Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.3 LAccepted-AOC | ₹47.3 L | L1 | Accepted-AOC Accepted Being L1 |
| 2 | L2₹48.2 L+₹92,050 (1.95%)Rejected-Finance AT ROAD CHABUA PO CHABUA DIST DIBRUGARH ASSAM 786184 | CHABUA | DIBRUGARH | ASSAM | 786184 | ₹48.2 L+₹92,050 (1.95%) | L2 | Rejected-Finance Rejected Being L2 |
| 3 | L3₹48.8 L+₹1.5 L (3.14%)Rejected-Finance PO HATIALI SIDING CHABUA DIST DIBRUGARH ASSAM 786184 | CHABUA | DIBRUGARH | ASSAM | 786184 | ₹48.8 L+₹1.5 L (3.14%) | L3 | Rejected-Finance Rejected Being L3 |
| 4 | L4₹49.2 L+₹1.9 L (3.95%)Rejected-Finance NEAR RASTRYA HINDI VIDYALAYA PO CHABUA DIST DIBRUGARH ASSAM 84 | CHABUA | DIBRUGARH | ASSAM | 786102 | ₹49.2 L+₹1.9 L (3.95%) | L4 | Rejected-Finance Rejected Being L4 |
| 5 | L5₹49.3 L+₹2.0 L (4.32%)Rejected-Finance | ₹49.3 L+₹2.0 L (4.32%) | L5 | Rejected-Finance Rejected Being L5 |
| Sl No | Description | Qty | Unit | pintoo construction L4 | M/S R G Construction L6 | J D construction L7 | M/S DURGA CONSTRUCTION & CO L9 | M/S P R SINGH AND SONS L5 | M/S MAHATO ENTERPRISE L2 | M/s Parma Construction L1 | M/s Krishna Construction L3 | D.D Construction L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work or stone /boulder masonary, built in cement moratar or cement lime mortar including all quoins, arches, pillars etc complete all as specified and as directed. | 71.6 | Cum | 850 ₹60,860 | 900 ₹64,440 | 900 ₹64,440 | 900 ₹64,440 | 800 ₹57,280 Lowest | 800 ₹57,280 Lowest | 800 ₹57,280 Lowest | 900 ₹64,440 | 900 ₹64,440 |
| 2.00 | M&L for brick work with sub class 'B' brick straight or curved on plan exc 6 m mean radius built in CM 1:4 complete all as specified and directed. | 48 | Cum | 11,500 ₹5,52,000 | 11,000 ₹5,28,000 Lowest | 12,000 ₹5,76,000 | 15,000 ₹7,20,000 | 11,000 ₹5,28,000 Lowest | 12,000 ₹5,76,000 | 11,000 ₹5,28,000 Lowest | 11,500 ₹5,52,000 | 11,000 ₹5,28,000 Lowest |
| 3.00 | All as per item No. 2 ( here in before) but except bricks complete all as specified and directed.
Note: Old servicable bricks obtained for an ser item No 02 shall be revised after proper cleaning of bricks. | 23.6 | Cum | 6,000 ₹1,41,600 Lowest | 7,000 ₹1,65,200 | 6,500 ₹1,53,400 | 6,500 ₹1,53,400 | 7,000 ₹1,65,200 | 7,000 ₹1,65,200 | 6,500 ₹1,53,400 | 6,000 ₹1,41,600 Lowest | 6,200 ₹1,46,320 |
| 4.00 | Dismantling Bricks (laid flat or on edge) or brick tiles in floors, channels, kerbs, aprons, etc. (each layer) complete all as specified and as directed. | 38 | 10 Sqm | 1,200 ₹45,600 | 1,500 ₹57,000 | 1,100 ₹41,800 Lowest | 1,200 ₹45,600 | 1,250 ₹47,500 | 1,200 ₹45,600 | 1,200 ₹45,600 | 1,300 ₹49,400 | 1,200 ₹45,600 |
| 5.00 | M&L for brick work with sub-class `B' bricks, laid on edge in floors; old size bricks bedded and jointed in Cement mortar 1:4 and pointed in cement mortar (1:3) complete all as specified and as directed. | 60 | Sqm | 1,600 ₹96,000 Lowest | 1,600 ₹96,000 Lowest | 1,700 ₹1,02,000 | 1,650 ₹99,000 | 1,700 ₹1,02,000 | 1,700 ₹1,02,000 | 1,600 ₹96,000 Lowest | 1,700 ₹1,02,000 | 1,600 ₹96,000 Lowest |
| 6.00 | All as per item No. 5 ( here in before) but except bricks complete all as specified and as directed.
Note: Old servicable bricks obtained for an ser item No 04 shall be revised after proper cleaning of bricks. | 20 | Sqm | 900 ₹18,000 | 900 ₹18,000 | 800 ₹16,000 Lowest | 900 ₹18,000 | 800 ₹16,000 Lowest | 900 ₹18,000 | 800 ₹16,000 Lowest | 800 ₹16,000 Lowest | 900 ₹18,000 |
| 7.00 | M&L for brick work with sub-class `B' brick old size, laid flat in channel, bedded and jointed in cement mortar (1:6) and pointed in CM (1:3) complete all as specified and as directed. | 280 | Sqm | 1,320 ₹3,69,600 | 1,300 ₹3,64,000 | 1,300 ₹3,64,000 | 1,100 ₹3,08,000 Lowest | 1,200 ₹3,36,000 | 1,200 ₹3,36,000 | 1,200 ₹3,36,000 | 1,300 ₹3,64,000 | 1,800 ₹5,04,000 |
| 8.00 | All as per item No. 7 ( here in before) but except bricks complete all as specified and as directed.
Note: Old servicable bricks obtained for an ser item No 04 shall be revised after proper cleaning of bricks. | 40 | Sqm | 600 ₹24,000 | 600 ₹24,000 | 700 ₹28,000 | 600 ₹24,000 | 500 ₹20,000 Lowest | 700 ₹28,000 | 600 ₹24,000 | 600 ₹24,000 | 600 ₹24,000 |
| 9.00 | Taking down of cement or cement plaster any description from brick or stone wall etc. including raking out of joints, hacking for key, scrubbing down with water etc. complete all as specified and as directed. | 1,200 | Sqm | 80 ₹96,000 Lowest | 80 ₹96,000 Lowest | 90 ₹1,08,000 | 110 ₹1,32,000 | 80 ₹96,000 Lowest | 80 ₹96,000 Lowest | 80 ₹96,000 Lowest | 90 ₹1,08,000 | 90 ₹1,08,000 |
| 10.00 | M&L for 15 mm thick rendering in Cement Mortar 1:4 on fair faces of brick work or concrete surfaces finishing the surface even and smooth without using extra cement complete all as specified and as directed. | 1,895 | Sqm | 350 ₹6,63,250 | 400 ₹7,58,000 | 400 ₹7,58,000 | 400 ₹7,58,000 | 300 ₹5,68,500 Lowest | 350 ₹6,63,250 | 350 ₹6,63,250 | 400 ₹7,58,000 | 350 ₹6,63,250 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
8 May 2026, 6:00 pmClosed
GE (AF) CHABUA
GE (AF) CHABUA
REPAIR TO DRAIN, PATH, HARD STANDING, CULVERT AND CERTAIN MISC B/R REPAIR IN TECH AREA UNDER AGE B/R-II AT AF STN CHABUA UNDER GE (AF) CHABUA
2026_MES_760588_1
791
Open Tender
Civil Works
Item Rate
270 days
GE (AF) CHABUA
As per tender docu
6 documents required · 6 mandatory
₹500
Yes
GE (AF) CHABUA
₹90,000
Yes
14 May 2026
17 Apr 2026
11 May 2026
17 Apr 2026
8 May 2026
1 May 2026
17 Apr 2026 - 24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick work or stone /boulder masonary, built in cement moratar or cement lime mortar including all quoins, arches, pillars etc complete all as specified and as directed. | - | Cum | - | - |
| 2 | M&L for brick work with sub class 'B' brick straight or curved on plan exc 6 m mean radius built in CM 1:4 complete all as specified and directed. | - | Cum | - | - |
| 3 | All as per item No. 2 ( here in before) but except bricks complete all as specified and directed.
Note: Old servicable bricks obtained for an ser item No 02 shall be revised after proper cleaning of bricks. | - | Cum | - | - |
| 4 | Dismantling Bricks (laid flat or on edge) or brick tiles in floors, channels, kerbs, aprons, etc. (each layer) complete all as specified and as directed. | - | 10 Sqm | - | - |
| 5 | M&L for brick work with sub-class `B' bricks, laid on edge in floors; old size bricks bedded and jointed in Cement mortar 1:4 and pointed in cement mortar (1:3) complete all as specified and as directed. | - | Sqm | - | - |
| 6 | All as per item No. 5 ( here in before) but except bricks complete all as specified and as directed.
Note: Old servicable bricks obtained for an ser item No 04 shall be revised after proper cleaning of bricks. | - | Sqm | - | - |
| 7 | M&L for brick work with sub-class `B' brick old size, laid flat in channel, bedded and jointed in cement mortar (1:6) and pointed in CM (1:3) complete all as specified and as directed. | - | Sqm | - | - |
| 8 | All as per item No. 7 ( here in before) but except bricks complete all as specified and as directed.
Note: Old servicable bricks obtained for an ser item No 04 shall be revised after proper cleaning of bricks. | - | Sqm | - | - |
| 9 | Taking down of cement or cement plaster any description from brick or stone wall etc. including raking out of joints, hacking for key, scrubbing down with water etc. complete all as specified and as directed. | - | Sqm | - | - |
| 10 | M&L for 15 mm thick rendering in Cement Mortar 1:4 on fair faces of brick work or concrete surfaces finishing the surface even and smooth without using extra cement complete all as specified and as directed. | - | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_851954.xls
BOQ • 0.35 MB
generalpage.pdf
Tender Documents • 0.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .