| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹40.6 LAdmitted-Finance | -41.96% | ₹40.6 L | L1 | Admitted-Finance |
| 2 | L2₹42.7 L+₹2.1 L (5.27%)Admitted-Finance | -38.90% | ₹42.7 L+₹2.1 L (5.27%) | L2 | Admitted-Finance |
| 3 | L3₹43.1 L+₹2.5 L (6.17%)Admitted-Finance | -38.38% | ₹43.1 L+₹2.5 L (6.17%) | L3 | Admitted-Finance |
| 4 | L4₹43.4 L+₹2.8 L (6.87%)Admitted-Finance | -37.97% | ₹43.4 L+₹2.8 L (6.87%) | L4 | Admitted-Finance |
| 5 | L5₹44.9 L+₹4.3 L (10.6%)Admitted-Finance | -35.80% | ₹44.9 L+₹4.3 L (10.6%) | L5 | Admitted-Finance |
Tender Value
₹69.9 L
EMD Value
₹1.4 L
Closing Date
6 Jan 2026, 6:00 pmClosed
Executive Engineer Irrigation Division No 1 Jammu
Executive Engineer Irrigation Division No 1 Jammu
Remodellling of Bathera Khul of MRC at places.
2025_IFC_299397_2
eNIT 37 of 2025-26
Open Tender
Civil Works
Percentage
60 days
Malpur
Refer trender documents
2 documents required · 2 mandatory
₹1,000
Executive Engineer Irrigation Division No I Jammu
₹1.4 L
21 Jan 2026
30 Dec 2025
7 Jan 2026
30 Dec 2025
6 Jan 2026
30 Dec 2025
Clearing Jungle including uprooting of rank vegation grass brush wood trees and saplings of girth upto 30CM measured at a height of 1M above ground level and removal of rubbish upto a distance of 50Mtr. Outside the periphery of the area cleared.
Dismantling concrete grouted stone pitching in aprons drains etc.including stacking of serviceable material and disposal of unserviceable material, stacking /disposal lead upto 100 meters.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) .
Dry stone pitching (any thickness) excluding cost of stones. On Horizontal .
Dry stone pitching (any thickness) excluding cost of stones. On Slopes
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m on horizontal/side slopes; complete including curing.
Supply of stones
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Filling available excavated earth ( excluding rock ) in trenches plinth sides of foundations etc in layers not exceeding 20CM in depth.
Carriage of material from source to site of work : Sand average distanace 23KM by MT.
Carriage of material from source to site of work : Stone avg distance 11 KM by MT.
Carriage of material from source to site of work : Stones avg distance 10KM by MT.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_971258.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .