Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹14.0 L+₹6,569 (0.47%)Rejected-Finance | L2 | Rejected-Finance Highest | |
| 3 | L3₹14.0 L+₹8,471.37 (0.61%)Rejected-Finance | L3 | Rejected-Finance Highest |
Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
21 Oct 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
(132/33 KV Campus) Gauriganj, Distt. Amethi.
Remaining work of Transformer capacity increasing and line related work in the area of Electricity Distribution Division- Ist (Gauriganj), Distt. Amethi under System Augmentation /Strengthening work in Different District.
2023_MVVNL_848394_1
48/E.D.C.(G.)/2023-24
Open Tender
Electrical Works
Lump-sum
90 days
EDD-Ist (Gauriganj), Distt. Amethi.
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE
₹14,000
21 Oct 2023
9 Oct 2023
21 Oct 2023
9 Oct 2023
21 Oct 2023
9 Oct 2023
Amount
Loading, carriage of following items from Store Centre, Gauriganj/Sultanpur to dump store including unloading and proper stacking (distance 0-70 km.)
PCC Pole
63 KVA T/F
100 KVA T/F
250 KVA T/F
400 KVA T/F
L.T. Cable.
ACSR Weasel Conductor
11 KV Pin Insulator with Pin
11 KV Disc insulator with pin
Earthing complete
Stay set complete
Base angle
T-off/Top Channel
Dropper Angle/Channel
AB Cable size 3x50+1x35+1x16
Suspension Clamp
Top/T-Off/ Drroper and other clamp
Other Line Materials
Dragging of STP/PCC Pole from dump store to pit site.
Digging of pits up to the depth of 1650/2200 mm. as per site requirement. Fabrication & erection of single pole support on PCC/ST pole support including digging of pit & fixing of all accessories and clamps as per RESSPO norms .(clamp ,nuts & Bolts will be provided by the contractor).
Grouting of STP/PCC pole in ratio 1:4:8 with cement stone ballast, coarse sand and plinthing 300 mm above ground level as well as muffing of plinth.
Spreading, laying & stringing of ACSR weasel conductor for construction of 11 KV line as per RESSPO norms.
Ordinary earthing by 11 KV MS earth rod 2500 mm long as per RESSPO norm.
Concreting & nuzzling of stay complete including fixing of necessary clamps with the help of nuts & bolts other accessorise required for completing the work as well as its grouting by civil material viz. Sand, stone ballast and cement. The contractor will provide all civil material as well as stay insulator
Spreading, Laying & Stringinging of AB Cable of size 3x50+1x35+1x16 as per RESSPO norms.
Demounting & Installation of 63 KVA & 100 KVATransformer on constructed D/P making proper connections from 11 KV system and proper testing as well as commissioning of Transformer.
Providing and fixing of danger board with clamp and nuts & bolts on PCC/STP as per RESSPO norm. (danger board, nuts & bolts as well as barbed wire will be provided by the contractor)
Construction of plinth for 250/400 KVA transformer of 2x2x1.2 mtr. with help of first class brick and masonry 1:4 cement & coarse sand. Filling the structure completely as per norm with RCC to 1:2:2 cement & stone grit with M.S. bar & M.S. for restling the transformer.
Installation of 250/400 KVA Transformer on constructed plinth making proper connections from 11 KV system and proper testing as well as commissioning of Transformer.
Earthing of 11/0.4 KV T/F with sutable G.I. pipe and fixing sutable G.I. Strip including all material requaired to complete the work.
Construction of fencing for newely constructed Transformer plinth as per RESSPO norms.
Spreading, Laying & Stringinging of L.T. Cable.
Dismantling/Loading/unloading, carriage of Old Transformer from site store to store center Gauriganj/Sultanpur to dump store. (distance 0 to 40 Km.)
25/16 KVA T/F
63 KVA T/F
100 KVA T/F
250 KVA T/F
Note: If any work which has been left over in BOQ and is necessary to complete the work, the same will be carried out by working agency free of cost.
SHRI HANUMAN ENTERPRISES
PRAGATI CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .