| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Eligible |
| 2 | Rejected-Technical | - | - | Rejected-Technical Techinical bid Not qualified |
| 3 | Rejected-Technical | - | - | Rejected-Technical Techinical bid Not qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Techinical bid Not qualified |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
24 Apr 2025, 3:00 pmClosed
EXECUTIVE OFFICER
Executive Officer Thiruppuvanam Town Panchayat Sivagangai District
NABARD SCHEME (RIDF-XVIII) 2022-2023 Construction of BT Surface to SMS nagar Streets in Thiruppuvanam Town Panchayat
2025_DTP_537652_1
344/2022/A1
Open Tender
Civil Works - Roads
Works
180 days
Thiruppuvanam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.4 L
Thiruppuvanam Town Panchayat
3 May 2025
3 Apr 2025
24 Apr 2025
3 Apr 2025
24 Apr 2025
3 Apr 2025
17 Apr 2025
Amount
Road work
Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401
Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam for 150mm thick specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density,including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers MORTH 406
Applying Tack Coat over existing Prime coating WMM surface using 2.5 Kg of Bitumen emulsion(RS-1) per 10 Sq.m including labour charges for preparing the surface removing of binder materials and other foreign matter with wire brushes and small picks & axes sweeping with brooms on soft brushes and finally dusting with old gunny bag and/or compressed air and applying the required quantity of bitumen emulsion as tack coat manually etc., Complete complying with 503 of MORTH specifications.
Providing and laying Prime Coat over WBM/WMM surface using 7 Kg of Emulsion Bitumen for 10 Sq.m and cost of Emulsion Bitumen(SS-2Grade) which will be supplied and procured by the contractor himself at his own cost as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bitumenius Binder as tack Coat by Bitumen sprayer including hire and fuel for all tools and plant employed etc., complete as per clause 503 of MORTH Specification . etc., complete as per standard specification
Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30 bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumatic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumatic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5.
Providing and laying Bituminous Concrete 40mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and 4.22kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and laying of hot applied thermoplastic compound 2.5 mm. thick including reflectorising glass beads @ 250 gms. per sqm. area, thickness of 2.5 mm. is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes etc. complete. (as per MORT & H specification No.803). (CE(H) Chennai Memo No.4848/BOE/138/2011-1/ dated:06.01.12)
Providing and laying soling Gravel for including cost and conveyance of Gravel from approved quarry to working site and stacking them to departmental gauge for pre measurement including labourcharges for sperading watering including all leads for water and consolidation by power roller rolling including hire and fuel charges for all tools and plants employed and all other incidental charges etc, complete complying as per clause 401 MORTH specification. Towards the charges for routine maintenance of the road work executed under NABARD SCHEME including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost.
Clearing and Grubbing by Light Jungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per MORTH Specification 111, 112, 201. Upkeeping for 1st year Upkeeping 1st year (50%)
Upkeeping 2nd year (60%)
Upkeeping 3rd year (60%)
Upkeeping 4rd year (60%)
Upkeeping 4th year (60%)
Earth Work excavating and deposting on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay, Stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS20A for making up the berms. as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision [Twice in a year] Earthen drain Upkeeping for 1st year (40%)
Upkeeping for 2nd year (40%)
Upkeeping for 3rd year (40%)
Upkeeping for 4th year (40%)
Upkeeping for 5th year (40%)
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg/sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per clause 503 4 th year 3%
5 th year 5%
Providing and laying Bituminous Concrete 40mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen and - kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 4 th year 3%
5 th year 5%
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .