| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹57.1 LAccepted-AOC | 1 | Accepted-AOC ACCEPTED | |
| 2 | 2₹60.1 L+₹2.9 L (5.15%)Rejected-AOC | 2 | Rejected-AOC REJECTED |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
29 Nov 2023, 12:30 pmClosed
EXECUTIVE OFFICER
ARULMIGU SELLIESWARAR VAGAIYARA TEMPLE ANTHIYUR ANTHIYUR TK ERODE DISTRICT 638501
RECONSTRUCTION OF COMPOUND WALL ARULMIGU SELLIESWARAR TEMPLE ANTHIYUR ANTHIYUR TK ERODE DISTRICT 638501
2023_HRCE_377871_1
V.AA.NO.278/S.M.T.A/TENDER 2023
Open Tender
Civil Works
Item Rate
210 days
ANTHIYUR
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹40,000
Yes
9 Jul 2024
11 Oct 2023
29 Nov 2023
11 Oct 2023
29 Nov 2023
18 Oct 2023
Amount
Reconstruction of Compoundwall for Arulmigu Sellieswarar Temple at Anthiyur Town and Taluk , Erode District under HR&CE announcement no.75 in the year 2022-2023.
Earth work excavation for foundation in all classes of soils except hard rock requiring blastering with initial lead and lift etc., Complete.
Supplying filling the foundation and basement with good filling M sand including cost and conveyance of sand and labour charges for filling watering consolidation etc.,
Cement concrele of mix 1:5:10 (One cement Five sand and Ten aggregates) using 40mm gauge hard broken including cost conveyance of all materials elc., complete as per standard specification.
Providing and laying , Standard Concrete Mix - 20 Grade in accordance with IS : 456 2000, using 20mm and downgraded hard broken granite stone jelly for all RCC items but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying vibrating with mechanical vibrators finishing ,curing,etc.,and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra. etc, complete complying with standard specification
Upto basement
Above NGL
Supplying and erecting centering shuttering including necessary supports for plain surfaces such as R.C.C.Column foolings Plinthbeam, Staircase steps R.C.C.Critical Piers etc, Complete in all - floors (The rectified materials should be taken by the Contractor). The Payment for the centering shall be give after the concrete is laid .
Supplying and erecting centering for sides soffits Including supports and strutting upto 3.20 mt.helght for plane surfacos such as roinforcod cement concrete slabs, rectangular beams, Tee or ELL beams, lintels, bedblocks, Stalrcase Waist and landing slabs,landing beams,beams conopy etc., with all cross bracings using nailed ,steel sheets of size 90cmx60cmx10cm stiffened with welded mild steel sheets of angle of size 25x25x3mm for boardings laid over silver oak (Country wood centering shuttering for RCC works by using M.S sheets and angles etc.complete(For plain surface)
Supplying and centering for plain surfaces such as RCC wall etc. complete
Supplying and centering for Column etc., complete.
Supplying fabricating and placing in position steel reinforcement using mild steel /Ribbed tar steel rods for all RCC works.
Supplying and fixing in position best approved quality PVC pipe of 110mm dia having a pressure of 4 Kg/em 2 including cost of necessary PVC pipe efc.., complete
supplying and fixing MS grill gate including cost conveyance etc:, complete
Random Rubble Masonry in Cement Mortar 1:5 ( one cement and five M sand P mix - with using new stones including necessary provision of bond stones etc., complete
Upto basement
Above basement
painting of new iron works such as gate etc:,with 2coats of synthetic enamel paint over the exists zinc chromite primer
Plastering walls with Cemen Mortar 1:1.5one cement , three P sand ,10mm thick in all floors and all exposed surfaces including cost and conveyance of malerials to site and all labour charges efc complete.
Supplying and painting two coats with approved water based exterior / interiorEmlsuion over the the cement plastered wall surface , ceiling and other new surface including the cost of priming coat etc.,complete in all floors, the make and colour of paint to be used be got approved.
GST Amount for providing Service to Government Contract Works at 18%(9%+9%) for the above Works. { GST Amount is the Total GST Amount for overall quoted amount}
THIRU BALAJI COMPANY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_450362.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .