| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC Low Level Quoted |
| 2 | Rejected-Technical | - | - | Rejected-Technical High Level Quoted |
| Sl No | Description | Qty | Unit | V.GOPINATHAN L1 | SANKAR CONSTRUCTION WORK L2 |
|---|---|---|---|---|---|
| 1.00 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with | 9.3 | Cum | 263.7 ₹2,452.41 | 264 ₹2,455.20 |
| 2.00 | Providing and laying Granular Sub Base material using 53mm to 26mm , 26mm and below including cost and conveyance of all materials and all other charges etc complete | 20.15 | Cum | 2,459 ₹49,548.85 | 2,460 ₹49,569 |
| 3.00 | CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 22.94 | Cum | 5,356.5 ₹1.2 L | 5,357 ₹1.2 L |
| 4.00 | CEMENT CONCRETE 1:2:4 mix using 20mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 9.3 | Cum | 6,659.7 ₹61,935.21 | 6,659.9 ₹61,937.07 |
| 5.00 | Supply and fixing of centering materilas for Concrete works including cost and conveyance of all materials to site and all labour charges etc complete | 74.4 | Sqm | 547 ₹40,696.80 | 549 ₹40,845.60 |
| 6.00 | CEMENT CONCRETE 1:1.5:3 mix using 20mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 15.11 | Sqm | 9,098 ₹1.4 L | 9,099 ₹1.4 L |
| 7.00 | Provision for Bitumen Pad | 3.66 | Cum | 243 ₹889.38 | 244 ₹893.04 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 74,856.88 ₹74,856.88 | 74,893.57 ₹74,893.57 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
24 Dec 2025, 5:30 pmClosed
Block Development Officer,Uthiramerur
Block Development Office,Uthiramerur
Providing for Cement Concrete Road in Perumal Koil Street At Nancheepuram Panchayat
2025_RDTN_634536_1
R.C.No.179/2025 A17- Dt 24.11.2025
Open Tender
Civil Works
Uthiramerur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
21 Jan 2026
19 Dec 2025
24 Dec 2025
19 Dec 2025
24 Dec 2025
19 Dec 2025
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with
Providing and laying Granular Sub Base material using 53mm to 26mm , 26mm and below including cost and conveyance of all materials and all other charges etc complete
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
CEMENT CONCRETE 1:2:4 mix using 20mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Supply and fixing of centering materilas for Concrete works including cost and conveyance of all materials to site and all labour charges etc complete
CEMENT CONCRETE 1:1.5:3 mix using 20mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Provision for Bitumen Pad
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_759259.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Schedule.pdf
Tender Documents • 0.38 MB
BOQ_759259.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid