| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹23.3 L+₹24,971.55 (1.08%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹24 L
EMD Value
₹48,000
Closing Date
15 Feb 2021, 12:00 pmClosed
E.E.A.I.D. DHAMPUR
OFFICE OF THE E.E.A.I.D. DHAMPUR
LOT 03 CONSTRUCTION OF BOUNDRY WALL FOR PROTECTION AND SAFTY OF OLD RAMGANGA CANAL COLONY DHAMPUR IN DISTT. BIJNOR
2021_UPIDC_549429_6
04/EE/2020-21
Open Tender
Civil Works
Item Rate
45 days
DHAMPUR
AS PER NIT
2 documents required · 2 mandatory
₹354
₹48,000
2 Mar 2021
9 Feb 2021
15 Feb 2021
9 Feb 2021
15 Feb 2021
9 Feb 2021
Amount
ITEMS
Earth work in excavation for foundation in dry soil i/c lift 1.50M and lead upto 30M i/c all cost of all labour T&P etc. complete work. But excluding G.S.T.
Laying P.C.C. 1 Cement : 4 Coarse sand : 8 single (1:4:8) in foundation for making base i/c all cost of material, labour T&P etc. complete work. But excluding G.S.T.
Laying 20 mm thick D.P.C. in 1 :2 Cement & Coarse sand with water proofing compound i/c all material, labour T&P etc. complete work. But excluding G.S.T.
Painting on D.P.C. with two coat bitumen 80/50 or 85/25 about 1.7 kg/M2 i/c cost of fuel, labour T&P etc. complete. But excluding G.S.T.
Ist class Brick (M-100) work in mortar with cement and coarse sand i/c all material, labour T&P etc. complete work. But excluding G.S.T.
12mm Thick Plaster in 1 :4 mortor with Cement & Coarse sand i/c all cost of material, labour T&P etc. complete work. But excluding G.S.T.
Laying 35mm thick C.C. Flooring (1:2:4) of 1 Cement : 2 Coarse Sand : 4 Crushed Coarse Aggregate, finished with a floating coat of neat cement i/c all cost of material, labour T&P etc. complete work. But excluding G.S.T.
Snowcem Painting with two coats over New surface of Approved Quality Snowcem i/c all cost of material, labour, T & P etc. complete work. But excluding G.S.T.
Laying R.C.C. 1 Cement : 1.5 Coarse Sand : 3 Crushed Coarse Aggregate of 10-20 mm Size (1:1.5:3) in column and footing i/c all cost of material, labour T&P etc. complete. But excluding cost of steel and Centring and Shuttering complete work. But excluding G.S.T.
Iron work in heavy sizes such as gates wrought to require from i/c drilling holes, rivetting or welding where necessary, and also i/c all cost of material, labour, T & P etc. complete work. But excluding G.S.T.
Supply, Bending, Binding, Cutting and Placing of reinforcement steel i/c cost of Material, labour and T&P etc. complete work. But excluding G.S.T.
Ordinary Centering and Shuttering for R.C.C. work i/c all labour T&P etc. complete work. But excluding G.S.T.
Applying Ready mix primer of Approved Quality on steel gate i/c all cost of material, labour, T & P etc. complete work.
Painting 2 coates enamal paint of Approved Quality on Steel gate i/c all cost of material, labour T&P etc. complete work. But excluding G.S.T.
M/S PRABHAT CHANDRA CONTRACTOR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .