| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.9 LAdmitted-Finance | ₹31.9 L | L1 | Admitted-Finance |
| 2 | L2₹32.5 LAdmitted-Finance | ₹32.5 L | L2 | Admitted-Finance |
| 3 | L3₹35.0 LAdmitted-Finance | ₹35.0 L | L3 | Admitted-Finance |
| 4 | L4₹43.1 LAdmitted-Finance | ₹43.1 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SVR CONSTRUCTION L3 | A T SABU THOMAS L4 | DURAIRAJ L2 | SIVALINGAM L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 78.54 | Cum | 598 ₹46,966.92 | 333 ₹26,153.82 | 330 ₹25,918.2 | 325 ₹25,525.5 Lowest |
| 2.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height etc., complete complying with standard specifications and as directed by the departmental officers. | 348.9 | Sqm | 984 ₹3,43,317.6 | 554 ₹1,93,290.6 Lowest | 660 ₹2,30,274 | 649 ₹2,26,436.1 |
| 3.00 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height) | 304.24 | Cum | 7,488 ₹22,78,149.12 | 10,349 ₹31,48,579.76 | 7,269 ₹22,11,520.56 | 7,147 ₹21,74,403.28 Lowest |
| 4.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 19.2 | Cum | 6,801 ₹1,30,579.2 Lowest | 7,207 ₹1,38,374.4 | 7,017 ₹1,34,726.4 | 6,899 ₹1,32,460.8 |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 17.4 | Cum | 8,877 ₹1,54,459.8 | 8,316 ₹1,44,698.4 | 8,204 ₹1,42,749.6 | 8,066 ₹1,40,348.4 Lowest |
| 6.00 | Supply and Fixing Bitumen Pad including all etc complete complying with standard specification. | 3.6 | Sqm | 550 ₹1,980 | 397 ₹1,429.2 Lowest | 644 ₹2,318.4 | 633 ₹2,278.8 |
| 7.00 | Provision For Name Board | 1 | LS | 10,000 ₹10,000 | 2,772 ₹2,772 Lowest | 3,580 ₹3,580 | 3,520 ₹3,520 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 5,33,782 ₹5,33,782 | 6,57,954 ₹6,57,954 | 4,95,196 ₹4,95,196 | 4,86,895 ₹4,86,895 Lowest |
Tender Value
Refer Docs
EMD Value
₹37,000
Closing Date
11 Jun 2026, 3:00 pmClosed
Block Development Officer
BDO Office Ooty
Construction of retaining wall and providing CC road at nanjanad indco tea factory (Leaf trough area) h/o nanjanad
2026_RDTN_678263_1
SADP 2025-2026
Open Tender
Civil Works
Item Rate
Nanjanad
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹37,000
Yes
BDO Office Ooty
19 Jun 2026
26 May 2026
12 Jun 2026
26 May 2026
11 Jun 2026
26 May 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 78.54 | Cum | - | - |
| 2 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height etc., complete complying with standard specifications and as directed by the departmental officers. | 348.9 | Sqm | - | - |
| 3 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height) | 304.24 | Cum | - | - |
| 4 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 19.2 | Cum | - | - |
| 5 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 17.4 | Cum | - | - |
| 6 | Supply and Fixing Bitumen Pad including all etc complete complying with standard specification. | 3.6 | Sqm | - | - |
| 7 | Provision For Name Board | 1 | LS | - | - |
| 8 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
nanjanadtech.pdf
Tender Documents • 0.98 MB
nanjanadprice.pdf
Tender Documents • 0.74 MB
BOQ_814885.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].