Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.6 L+₹3,856.74 (1.09%)Admitted-Fee/PreQual/Technical/Finance | ₹3.6 L+₹3,856.74 (1.09%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.6 L+₹3,894.72 (1.10%)Admitted-Fee/PreQual/Technical/Finance | ₹3.6 L+₹3,894.72 (1.10%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.6 L+₹4,811.50 (1.36%)Admitted-Fee/PreQual/Technical/Finance NO 1007 12TH SECTOR 78TH STREET KCEE MANASA APARTMENTS E BLOCK 3RD FLOOR K K NAGAR CH 600 078 | CHENNAI | CHENNAI | TAMIL NADU | 600078 | ₹3.6 L+₹4,811.50 (1.36%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.7 L+₹12,734 (3.61%)Admitted-Fee/PreQual/Technical/Finance COIMBATORE | ₹3.7 L+₹12,734 (3.61%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | ANANDKUMAR L6 | SRI PUGAZH CONSTRUCTIONS L2 | THANGAM AND CO L3 | SS ENGINEERRS L4 | S RAJATHI L5 | GOVINDAN ARUL KUMARAN L1 | B SHANAVAS L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling plain cement concrete | 33 | m3 | 570 ₹18,810 | 486.42 ₹16,051.86 | 486.43 ₹16,052.19 | 488 ₹16,104 | 300 ₹9,900 Lowest | 484 ₹15,972 | 500 ₹16,500 |
| 2.00 | Plain Cement concrete 1:4:8 (one cement, four sand, eight aggregate) using 40mm gauge hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted,etc., complete complying with standard specification. | 41 | m3 | 5,200 ₹2,13,200 | 5,068.06 ₹2,07,790.46 Lowest | 5,068.63 ₹2,07,813.83 | 5,082 ₹2,08,362 | 5,300 ₹2,17,300 | 5,200 ₹2,13,200 | 5,600 ₹2,29,600 |
| 3.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification etc., complete. | 21 | m2 | 7,250 ₹1,52,250 | 6,176.82 ₹1,29,713.22 | 6,177.5 ₹1,29,727.5 | 6,194 ₹1,30,074 | 6,500 ₹1,36,500 | 5,740 ₹1,20,540 Lowest | 7,100 ₹1,49,100 |
| 4.00 | Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 33 | m3 | 104 ₹3,432 | 88.4 ₹2,917.2 | 88.4 ₹2,917.2 | 87.5 ₹2,887.5 | 50 ₹1,650 Lowest | 88 ₹2,904 | 100 ₹3,300 |
| 5.00Add :- GST @ 18% | ||||||||||
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
9 Jul 2026, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Providing Cement Concrete Flooring at Bango street in ward no 18 North Zone
2026_MAWS_683429_12
E1/NorthZone/2026-27
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
10 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling plain cement concrete | 33 | m3 | - | - |
| 2 | Plain Cement concrete 1:4:8 (one cement, four sand, eight aggregate) using 40mm gauge hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted,etc., complete complying with standard specification. | 41 | m3 | - | - |
| 3 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification etc., complete. | 21 | m2 | - | - |
| 4 | Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 33 | m3 | - | - |
| 5 | Add :- GST @ 18% | - | - | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
NITE1-Road.pdf
Tender Documents • 0.37 MB
BOQ_821776.xls
BOQ • 0.28 MB
ITBE1.pdf
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .