Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.5 LAccepted-AOC 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | 1 | Accepted-AOC eligible L-1 bidder | |
| 2 | 2₹4.6 L+₹6,558.94 (1.46%)Rejected-Finance GOPALMATH DURGAPUR DIST PASCHIM BARDHAMAN PIN 713217 W B | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713217 | 2 | Rejected-Finance Quoted more than L-1 Bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical technically rejected |
Tender Value
₹4.3 L
EMD Value
₹5,400
Closing Date
5 Nov 2022, 5:00 pmClosed
Area Engineer EnM
Sonepur Bazari area ECL
Diversion/erection/dismantling of F-10 along with transformer and LT lines at R-V top near Mazaar at Sonepur Bazari Project
2022_ECL_259895_1
GM/SBA/EnM/e-Tender/22-23/512
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Sonepur Bazari Area ECL
please refer tender documents
6 documents required · 6 mandatory
₹5,400
11 Feb 2023
25 Oct 2022
7 Nov 2022
26 Oct 2022
5 Nov 2022
26 Oct 2022
26 Oct 2022 - 29 Oct 2022
Amount
Item Description/ Heading
Material Cost
Material cost for erection of 13/16 mtrs long steel tubular pole with cement concrete
Material cost for supply, fabrication, hoisting, erection of phase and earth bracket and painting with red oxide primer
Meterial cost for supplying and erection of nuts and bolts,flats and erection of clamps
Material cost for supply and installation of 11 KV disc insulator and hardware
Material cost for supply and installation of 11 KV pin insulator and hardware
Material cost for Supply and fixing of 7/14 SWG GI wire for earth continiuity and 6/8 SWG for making and erection of cradle guard
Material cost for supply and erection of HT stay set complete with stay plate, stay insulator, and stay wire for required dimensions and specification
Material cost for stringing of ACSR DOG/WOLF conductor
Material cost for erection of earth pit with supply of all required materials
Material cost for making drop wire with insulator, bracket, clamp etc
Labour Cost:-
Labour cost for erection of 13/16 mtrs long steel tubular pole with cement concrete
Labour cost for fabrication, hoisting, erection of phase and earth bracket and painting with red oxide primer
Labour cost for erection of nuts and bolts,flats for febrication,hoisting and erection of clamps
Labour cost for installation of 11kV disc insulator and hardware
Labour cost for installation of 11 kv pin insulator and hardware.
Labour cost for fixing of 7/14 SWG GI wire for earth continiuity and 6/8 SWG for making and erection of cradle guard
Labour cost for erection of HT stay set complete with stay plate, stay insulator, and stay wire for required dimensions and specification
Labour cost for stringing of ACSR DOG/WOLF conductor
Labour cost for erection of earth pit with supply of all required materials
labour for making drop wire with insulator, bracket, clamp etc
labour cost for dismantling of 6.6 KV/220 V lighting transformer and reinstalled at other DP in shifted feeder 10
Labour cost for dismantilling of 16 mtrs long steel tubular pole with cement concrete
Labour cost for dismantilling of phase and earth brackets, angles, channel etc
Labour cost dismantling of 11kv disc/pin insulator and hardware materials.
Labour cost for dismantling of ACSR DOG/WOLF conductor
Labour cost for dismantling of drop wire with insulator, bracket clamp etc
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
MAZUMDER ELECTRICAL
EVERGREEN ENTERPRISE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_268771.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .