| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹1.4 L+₹20,562.47 (16.6%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹1.6 L+₹33,416.06 (27.1%)Rejected-Finance | 3 | Rejected-Finance L3 | |
| 4 | 4₹1.6 L+₹35,653.35 (28.9%)Rejected-Finance | 4 | Rejected-Finance L4 | |
| 5 | 5₹1.6 L+₹37,063.59 (30.0%)Rejected-Finance 233 LALPUR CIVIL LINE ETAH | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | SHREE SHYAMLA TRADERS L6 | M/S ADESH KUMAR THEKEDAR L2 | M/S N.S. CONSTRUCTION L4 | VINOD KUMAR L5 | A K INFRATECH L3 | M/S MAYA CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in silt clearance including lift up to 1.5 m and lead up to 30 m by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in-charge. Drains | 3,066.03 | Cum | 32 ₹98,112.96 | 32 ₹98,112.96 | 26 ₹79,716.78 | 38 ₹1,16,509.14 | 25 ₹76,650.75 Lowest | 31.5 ₹96,579.95 |
| 2.00 | Uprooting jhunds and moonj wih disposal away from site. | 3,487.5 | Sqm | 26 ₹90,675 | 5 ₹17,437.5 Lowest | 17 ₹59,287.5 | 6 ₹20,925 | 13 ₹45,337.5 | 5 ₹17,437.5 Lowest |
| 3.00 | Cement concrete 1:3:6 in foundation with cement, coarse sand , and stone grit 20-40 mm size including cost of all materials, labour , dewatering and T&P complete etc . | 1.1 | Cum | 5,500 ₹6,039 | 5,000 ₹5,490 | 3,000 ₹3,294 | 3,000 ₹3,294 | 5,300 ₹5,819.4 | 1,200 ₹1,317.6 Lowest |
| 4.00 | Ist class brick work in 1:4 C.M. cement and coarse sand including cost of all materials, Labour and T& P etc | 2.43 | Cum | 5,500 ₹13,365 | 4,000 ₹9,720 | 2,900 ₹7,047 | 3,000 ₹7,290 | 5,500 ₹13,365 | 1,200 ₹2,916 Lowest |
| 5.00 | Cement Plaster on Brick Masonry with cement mortar 1:4 (1cement:4sand). cement and coarse sand including cost of all materials, Labour and T& P etc | 8.66 | Sqm | 3,500 ₹30,296 | 160 ₹1,384.96 | 85 ₹735.76 | 100 ₹865.6 | 150 ₹1,298.4 | 50 ₹432.8 Lowest |
| 6.00 | Cement Pointing(Struck deep) on Brick Masonry with cement mortar 1:2 (1cement:2 sand). ement and coarse sand including cost of all materials, Labour and T& P etc | 16.41 | Sqm | 1,500 ₹24,609 | 100 ₹1,640.6 | 70 ₹1,148.42 | 150 ₹2,460.9 | 180 ₹2,953.08 | 50 ₹820.3 Lowest |
| 7.00 | C.C in 1:1.5:3 with cement, coarse sand , and stone grit 10-20 mm. including cost of all materials labour T&P complete etc . | 0.26 | Cum | 6,500 ₹1,709.5 | 5,000 ₹1,315 | 3,600 ₹946.8 | 2,500 ₹657.5 | 6,000 ₹1,578 | 1,200 ₹315.6 Lowest |
| 8.00 | Wall painting (Two coat) with plastic emulsion paint of approved brand and manufacture on decorative wall surface to give an even shade including thoroughly brushing the surface clean all of dirt, grease loose pieces and prepare smooth | 65.62 | Sqm | 150 ₹9,843.6 | 100 ₹6,562.4 | 85 ₹5,578.04 | 100 ₹6,562.4 | 120 ₹7,874.88 | 50 ₹3,281.2 Lowest |
| 9.00 | Supplying&Fixing wheel gard stone | 4 | Nos. | 5,000 ₹20,000 | 600 ₹2,400 | 350 ₹1,400 | 500 ₹2,000 | 510 ₹2,040 | 100 ₹400 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
23 May 2026, 2:00 pmClosed
Executive Engineer
ICD Firozabad HQ Shikohabad
Repair of Pacca Structure and Clearance of Tijaura Drain from Km 0.000 to 3.823
2026_UPIDC_1149144_1
02/EE/2026-27/09
Open Tender
Civil Works - Canal
Item Rate
15 days
Tijuara Drain
Please refer tender documents
2 documents required · 2 mandatory
₹266
₹7,000
11 Jun 2026
16 May 2026
23 May 2026
16 May 2026
23 May 2026
16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in silt clearance including lift up to 1.5 m and lead up to 30 m by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in-charge. Drains | - | Cum | - | - |
| 2 | Uprooting jhunds and moonj wih disposal away from site. | - | Sqm | - | - |
| 3 | Cement concrete 1:3:6 in foundation with cement, coarse sand , and stone grit 20-40 mm size including cost of all materials, labour , dewatering and T&P complete etc . | - | Cum | - | - |
| 4 | Ist class brick work in 1:4 C.M. cement and coarse sand including cost of all materials, Labour and T& P etc | - | Cum | - | - |
| 5 | Cement Plaster on Brick Masonry with cement mortar 1:4 (1cement:4sand). cement and coarse sand including cost of all materials, Labour and T& P etc | - | Sqm | - | - |
| 6 | Cement Pointing(Struck deep) on Brick Masonry with cement mortar 1:2 (1cement:2 sand). ement and coarse sand including cost of all materials, Labour and T& P etc | 1 | Sqm | - | - |
| 7 | C.C in 1:1.5:3 with cement, coarse sand , and stone grit 10-20 mm. including cost of all materials labour T&P complete etc . | - | Cum | - | - |
| 8 | Wall painting (Two coat) with plastic emulsion paint of approved brand and manufacture on decorative wall surface to give an even shade including thoroughly brushing the surface clean all of dirt, grease loose pieces and prepare smooth | 0.6 | Sqm | - | - |
| 9 | Supplying&Fixing wheel gard stone | - | Nos. | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.16 MB
BOQ_2151221.xls
BOQ • 0.34 MB
9.pdf
Tender Documents • 3.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .