Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L2₹7.9 LQualified Make: better power
Model: Make: Better Power Model: HR 20KVA60M_5 for critical infra 0 BETTER POWER SERVICES PVT LTD A K AZAD ROAD REHABARI KAMRUP ASSAM 781008 | KAMRUP METRO | ASSAM | 781008 | Make: better power
Model: Make: Better Power Model: HR 20KVA60M_5 for critical infra | ₹7.9 L | L2 | Qualified |
| 2 | L3₹9.6 LQualified Make: better power
Model: Make: Better Power Model: HR 20KVA60M_5 for critical infra RZ R 150 CHANAKYA PLACE PART 2 UTTAM NAGAR WEST DELHI D K MOHAN GARDEN WEST DELHI DELHI 110059 | WEST DELHI | DELHI | 110059 | Make: better power
Model: Make: Better Power Model: HR 20KVA60M_5 for critical infra | ₹9.6 L | L3 | Qualified |
| 3 | L4₹9.9 LQualified Make: electronics and controls
Model: E&C Make Renata i 20KVA Online UPS Three Phase Input and Single Phase Output with Minimum VAH 32770 29 A 2ND PHASE OPP TO ASIAN PAINTS GODOWN PEENYA INDUSTRIAL AREA BANGALORE KARNATAKA 560058 | BENGALURU URBAN | KARNATAKA | 560058 | Make: electronics and controls
Model: E&C Make Renata i 20KVA Online UPS Three Phase Input and Single Phase Output with Minimum VAH 32770 | ₹9.9 L | L4 | Qualified |
| 4 | L5₹10.3 LQualified Make: Uniline
Model: UNILINE Online UPS 20 KVA for critical infrastructures: 60 mins 113 PARK STREET PODDAR POINT PARK STREET KOLKATA WEST BENGAL 700016 | KOLKATA | WEST BENGAL | 700016 | Make: Uniline
Model: UNILINE Online UPS 20 KVA for critical infrastructures: 60 mins | ₹10.3 L | L5 | Qualified |
| 5 | L6₹6.8 LQualified Make: Delta
Model: DELTA Online UPS 20 KVA for Critical Infrastructures 11TH PAL ROAD JODHPUR RAJASTHAN 342001 | JODHPUR | RAJASTHAN | 342001 | Make: Delta
Model: DELTA Online UPS 20 KVA for Critical Infrastructures | ₹6.8 L Quoted ₹10.6 L | L6 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
8 Oct 2018, 3:00 pmClosed
Online UPS 20 KVA for Critical Infrastructures Average Turn Over of Last 3 Years 40 Lakh (s) Experience with Gov. Required 3 Year (s) Online UPS 20 KVA For Critical Infrastructures ( 2 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values GENERIC Online UPS should support for critical infrastructures such as Data Centres
Network operating centres
Security operation centres
State and District centres
Command and Control centre etc.
across the Country to provide impetus to the e- Governnance services e.g.Public food distribution
e Way bill
Counseling
e-Office
IVFRT etc.
services under Digital India Programme Yes * On Line UPS 20 KVA/60 20 KVA/60 1/8 Capacity/Battery back up time at full load/Minimum VAH Minutes/32770 VAH Minutes/32770 VAH Inverter Technology PWM with IGBT
double conversion * Isolation transformer: Galvanic Isolation through inbuilt transformer at UPS output side Yes * Output wave form Pure sine wave * Country of origin for Inverter India * Noise level (1 meter distance from UPS) </= 55 dB * UPS shall have cold start facility Yes * Type of cool Air cooled * Parallel load sharing redundant operation with all accessories Yes Yes Installation and commissioning Yes Yes INPUT Input AC Three Phase * In put Voltage Range 320 V to AC to 460 V AC 3 Phase * Input frequency range 50 Hz +/-6% Hz * Input power factor at full output load leading to unity with active power factor correction (APFC) >/=0.92 * Distortion (current) Less than 10% * UPS shall have DG set compatibility Yes * OUTPUT Out put voltage 230 V AC +/-1% Single Phase * Voltage regulation (Steady state) at No load to full load
0.6 lag to Unity PF
During entire back up time
Complete input voltage range +/-1% * Frequency 50 Hz +/-0.5 % Hz * CONSTRUCTION Minimum thickness (in mm) of M.S.Sheet 1.0 * 2/8 Enclosure for UPS duly powder coated UPS shall be free from workmanship defects
sharp edges
nicks
scratches
burst
etc. All fasteners shall be fixed properly. The equipment shall be complete with all parts and all parts shall be functional Yes * UPS enclosure's degree of protection as per IS:13947 (Part 1)/1993 latest IP21 * UPS shall have switches for: Mains ON/OFF MCB
Battery ON/OFF MCB/Fuse
Inverter push button with reset Yes * Standard quality Out put terminals shall be provided for output connection Yes * UPS shall have static and manual by pass facility Yes * UPS shall be supplied with required rated power cable (Copper) 5 Meters * Total Harmonic Distrotion (THD) for 100% linear load <3% * Total Harmonic Distrotion (THD) for 100% non-linear load <5% * Operating temeprature 0 deg C to 40 deg C * Humidity Upto 95% non- condensing * Crest factor on full non- linear load Not less than 3:1 * Over all efficiency on rated full load of 0.8 PF and 230 Volt
50 Hz AC output >/=85% * Inverter efficiency on rated full load of 0.8 PF and 230 Volt
50 Hz AC >/=90% * 3/8 output UPS shall withstand Over load capacity - 110% for 2 Minutes * UPS shall withstand Over load capacity - 125% for 30 seconds * Load power factor 0.8 lagging to unity Yes * Transient response time (for 100% load change
output must remain within +/-1% and recovery) </-20 milli seconds * PROTECTION Short circuit protection Yes * Over load protection Yes * Over temperature protection Yes * In put low/high voltage control Yes * DC low/high voltage trip Yes * BATTERY Battery shall conforming to JISC:8702(Pt.I
II&III) latest Yes * Battery type SMF VRLA * Country of origin for Battery India * Battery recharge time (after complete discharge to 90% charge) and charge rating: Battery recharge time to 90% charge after 100% DoD 8 to 10 hours * Battery charger should be capable to charge battery on C10 rating Yes * VAH tolerance -1% of the defined capacity * Battery cutoff voltage during back up Not less than 10.5 V * More than two battery banks should not be used in parallel in any configuration Yes * Batteries shall With rack With rack 4/8 supply with Meters and Indicators UPS shall have LCD meter to measure and monitor input votlage
output voltage
output current/load level in %
DC current/DC level in %
DC voltage
input and output frequency Yes * UPS shall have indicators for Mains on
Load on battery
Inverter
Battery level
Load level
Inverter over load Yes * UPS shall have audible alaram for over temperature
mains failure
battery low
inverter overload Yes * Management port: Preferably SNMP based with management Software Yes * WARRANTY AND SERVICES Warranty for UPS (on site comprehensive warranty) (in years) 5 5 Warranty for battery (replacement warranty) (in years) 2 2 After sales and complaint service within 48 hours * PAN India service support on 24 x 7 basis Yes * AMC support available after 5 year warranty Yes * Quarterly preventive maintenance Yes * Manufacturer shall provide and support for instllation
commissioning
spares
technical support all over India Yes * Availability of spares in close proximity (Spares should be easily available close to the site) Yes * 5/8 REPORTS AND CERTIFICATIONS ISO Certification Yes * CE Certification and marking Yes Yes
No Damp Heat Test: in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C
two cycles of (12+12) hours each 2007) Yes * Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs Yes * Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. Yes * Availability of the Type Test Report from Central Govt. NABL/ILAC Accredited lab covering all technical requirements. Yes * As per Meity (Government of India) guidelines storage battery shall have valid BIS CRS certifications as applicable as on date Yes * All the test reports and certificates shall furnish by the supplier to the buyer/consignee on demand Yes * * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Lallianmawii Hnamte 796001
National Informatics Centre
Mizoram State Centre
Mizoram Secretariat Annexe-II Room No 103
Treasury Square
Aizawl 2 42 6/8 796001
654970
GEM/2018/B/92919
Online UPS 20 KVA for Critical Infrastructures
Mizoram; Aizawl
PRODUCT
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| Online UPS 20 KVA for Critical Infrastructures Average Turn Over of Last 3 Years 40 Lakh (s) Experience with Gov. Required 3 Year (s) Online UPS 20 KVA For Critical Infrastructures ( 2 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values GENERIC Online UPS should support for critical infrastructures such as Data Centres | - | - | - |
| Network operating centres | - | - | - |
| Security operation centres | - | - | - |
| State and District centres | - | - | - |
| Command and Control centre etc. | - | - | - |
| across the Country to provide impetus to the e- Governnance services e.g.Public food distribution | - | - | - |
| e Way bill | - | - | - |
| Counseling | - | - | - |
| e-Office | - | - | - |
| IVFRT etc. | - | - | - |
| services under Digital India Programme Yes * On Line UPS 20 KVA/60 20 KVA/60 1/8 Capacity/Battery back up time at full load/Minimum VAH Minutes/32770 VAH Minutes/32770 VAH Inverter Technology PWM with IGBT | - | - | - |
| double conversion * Isolation transformer: Galvanic Isolation through inbuilt transformer at UPS output side Yes * Output wave form Pure sine wave * Country of origin for Inverter India * Noise level (1 meter distance from UPS) </= 55 dB * UPS shall have cold start facility Yes * Type of cool Air cooled * Parallel load sharing redundant operation with all accessories Yes Yes Installation and commissioning Yes Yes INPUT Input AC Three Phase * In put Voltage Range 320 V to AC to 460 V AC 3 Phase * Input frequency range 50 Hz +/-6% Hz * Input power factor at full output load leading to unity with active power factor correction (APFC) >/=0.92 * Distortion (current) Less than 10% * UPS shall have DG set compatibility Yes * OUTPUT Out put voltage 230 V AC +/-1% Single Phase * Voltage regulation (Steady state) at No load to full load | - | - | - |
| 0.6 lag to Unity PF | - | - | - |
| During entire back up time | - | - | - |
| Complete input voltage range +/-1% * Frequency 50 Hz +/-0.5 % Hz * CONSTRUCTION Minimum thickness (in mm) of M.S.Sheet 1.0 * 2/8 Enclosure for UPS duly powder coated UPS shall be free from workmanship defects | - | - | - |
| sharp edges | - | - | - |
| nicks | - | - | - |
| scratches | - | - | - |
| burst | - | - | - |
| etc. All fasteners shall be fixed properly. The equipment shall be complete with all parts and all parts shall be functional Yes * UPS enclosure's degree of protection as per IS:13947 (Part 1)/1993 latest IP21 * UPS shall have switches for: Mains ON/OFF MCB | - | - | - |
| Battery ON/OFF MCB/Fuse | - | - | - |
| Inverter push button with reset Yes * Standard quality Out put terminals shall be provided for output connection Yes * UPS shall have static and manual by pass facility Yes * UPS shall be supplied with required rated power cable (Copper) 5 Meters * Total Harmonic Distrotion (THD) for 100% linear load <3% * Total Harmonic Distrotion (THD) for 100% non-linear load <5% * Operating temeprature 0 deg C to 40 deg C * Humidity Upto 95% non- condensing * Crest factor on full non- linear load Not less than 3:1 * Over all efficiency on rated full load of 0.8 PF and 230 Volt | - | - | - |
| 50 Hz AC output >/=85% * Inverter efficiency on rated full load of 0.8 PF and 230 Volt | - | - | - |
| 50 Hz AC >/=90% * 3/8 output UPS shall withstand Over load capacity - 110% for 2 Minutes * UPS shall withstand Over load capacity - 125% for 30 seconds * Load power factor 0.8 lagging to unity Yes * Transient response time (for 100% load change | - | - | - |
| output must remain within +/-1% and recovery) </-20 milli seconds * PROTECTION Short circuit protection Yes * Over load protection Yes * Over temperature protection Yes * In put low/high voltage control Yes * DC low/high voltage trip Yes * BATTERY Battery shall conforming to JISC:8702(Pt.I | - | - | - |
| II&III) latest Yes * Battery type SMF VRLA * Country of origin for Battery India * Battery recharge time (after complete discharge to 90% charge) and charge rating: Battery recharge time to 90% charge after 100% DoD 8 to 10 hours * Battery charger should be capable to charge battery on C10 rating Yes * VAH tolerance -1% of the defined capacity * Battery cutoff voltage during back up Not less than 10.5 V * More than two battery banks should not be used in parallel in any configuration Yes * Batteries shall With rack With rack 4/8 supply with Meters and Indicators UPS shall have LCD meter to measure and monitor input votlage | - | - | - |
| output voltage | - | - | - |
| output current/load level in % | - | - | - |
| DC current/DC level in % | - | - | - |
| DC voltage | - | - | - |
| input and output frequency Yes * UPS shall have indicators for Mains on | - | - | - |
| Load on battery | - | - | - |
| Inverter | - | - | - |
| Battery level | - | - | - |
| Load level | - | - | - |
| Inverter over load Yes * UPS shall have audible alaram for over temperature | - | - | - |
| mains failure | - | - | - |
| battery low | - | - | - |
| inverter overload Yes * Management port: Preferably SNMP based with management Software Yes * WARRANTY AND SERVICES Warranty for UPS (on site comprehensive warranty) (in years) 5 5 Warranty for battery (replacement warranty) (in years) 2 2 After sales and complaint service within 48 hours * PAN India service support on 24 x 7 basis Yes * AMC support available after 5 year warranty Yes * Quarterly preventive maintenance Yes * Manufacturer shall provide and support for instllation | - | - | - |
| commissioning | - | - | - |
| spares | - | - | - |
| technical support all over India Yes * Availability of spares in close proximity (Spares should be easily available close to the site) Yes * 5/8 REPORTS AND CERTIFICATIONS ISO Certification Yes * CE Certification and marking Yes Yes | - | - | - |
| No Damp Heat Test: in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C | - | - | - |
| two cycles of (12+12) hours each 2007) Yes * Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs Yes * Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. Yes * Availability of the Type Test Report from Central Govt. NABL/ILAC Accredited lab covering all technical requirements. Yes * As per Meity (Government of India) guidelines storage battery shall have valid BIS CRS certifications as applicable as on date Yes * All the test reports and certificates shall furnish by the supplier to the buyer/consignee on demand Yes * * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Lallianmawii Hnamte 796001 | - | - | - |
| National Informatics Centre | - | - | - |
| Mizoram State Centre | - | - | - |
| Mizoram Secretariat Annexe-II Room No 103 | - | - | - |
| Treasury Square | - | - | - |
| Aizawl 2 42 6/8 796001 | - | - | - |
Exempted
8 Oct 2018
26 Sept 2018
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_654970.pdf
GEM_BID
termsCondition.pdf
OTHER
2657c7ca70287299b5181580fdb5a7ab.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .