Tender Value
₹5.4 L
EMD Value
₹10,740
Closing Date
5 Jun 2026, 5:00 pmClosed
Executive Officer
Nagar Palika Parishd Shamli
Road construction work in Ward No. 8, Ranjit Nagarfrom Kushalpal house to Ombir house.
2026_DOLBU_1149926_1
228/E-T/PWC/2025-26
Open Tender
Civil Works
Percentage
30 days
Road construction work in Ward No. 8, Ranjit Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Officer
₹10,740
23 Jul 2026
19 May 2026
6 Jun 2026
19 May 2026
5 Jun 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet). | 7.29 | Cum | 1,000 | ₹7,290 |
| 2 | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). | 5.75 | Cum | 400 | ₹2,300 |
| 3 | Deduct the cost of old bricks | 397 | Nos | 4.2 | ₹1,667.4 |
| 4 | Ded the cost of old bricks/batts | 0.86 | Cum | 600 | ₹516 |
| 5 | Excavation in foundation in odinary soil (loam clay or sand) including lift upto 1.50M and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer incharge upto a distance of 30Mfrom the foundation trenches | 12.6 | Cum | 90 | ₹1,134 |
| 6 | Disposal of earth up to 8.00 Km from site including etc. all complete work. | 11.97 | Cum | 230.1 | ₹2,754.3 |
| 7 | Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc, required for proper completion of the work. | 4.98 | Cum | 4,850 | ₹24,153 |
| 8 | Cast Cement concrete door sills, chaukhats, boundary posts shelves and similar small work with cement, approved coarse sand and 2 cm gauge stone grit in proportions of 1:2:4 excluding its fixing and binding the same with 24 B. W. G.G.I., binding wire, moulds, all materials labour, Tools & Plants etc. required for proper completion of the work. The rate excludes making of drip course which shall be paid extra. | 10.71 | Cum | 6,280 | ₹67,258.8 |
| 9 | Supply & Laying, spreading and compacting 53 mm to 22.4 mm size stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. | 38.7 | Cum | 3,474.84 | ₹1,34,476.31 |
| 10 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 (1:12:3) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, appiying debonding sirips primer, sealani, dowel bars, near approaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including Cost of Polythene Sheet and Dowel har and also including complete shifting of matrials & Concrete etc. | 38.7 | Cum | 7,300 | ₹2,82,510 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
technicaldocuments.pdf
Tender Documents • 1.48 MB
BOQ_2153123.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .