| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹180.3 CrAccepted-AOC | ₹180.3 Cr | L1 | Accepted-AOC Agreement done as per attached letter |
| 2 | L2₹190.4 CrRejected-Finance AHEMDABAD B WING 15TH FLOOR PRIVILON BUILDING VIKRAM NAGAR AMBALI BOPAL ROAD BEHIND ISCONTAMPLE AHEMDABAD 380058 GUJRAT INDIA | AHMADABAD | GUJARAT | 380058 | ₹190.4 Cr | L2 | Rejected-Finance BEING L2 |
| 3 | L3₹192.8 CrRejected-Finance | ₹192.8 Cr | L3 | Rejected-Finance BEING L3 |
Tender Value
₹185.9 Cr
EMD Value
₹50 L
Closing Date
3 Apr 2024, 5:30 pmClosed
EE Water Resources Division NO.1 Jhabua
Executive Enginee Water Resources Division no. 1 Jhabua
On Turnkey Basis Construction of Talawada Dam, as per detailed scope of work but not limited to that.
2024_WRD_343212_1
1060/2023-24/Einc/Etendering/ dt.09-03-2024
Open Tender
Civil Works - Others
1095 days
Jhabua
Please refer Tender documents.
30 documents required · 30 mandatory
₹50,000
₹50 L
o/o ENC , TULSI NAGAR , BHOPAL
13 Nov 2024
16 Mar 2024
5 Apr 2024
16 Mar 2024
3 Apr 2024
22 Mar 2024
22 Mar 2024
Amount
Talawada Dam Project
Construction of Talawada Dam Project on Mahi River having approximate gross capacity of 67 MCM on turnkey basis with maximum total submergence of 653 Ha land comprising of preparation of Construction drawings & design, obtaining approval of all construction drawings & design from the competent authority including construction of all civil, mechanical, and electrical works involved in the construction of Dam. The work includes survey of Head Work and Submergence with Fixing of Chainage cum Boundary Stone, geological investigations, hydrology approval, preparation, and submission of complete Land Acquisition (LA) cases to competent authority for land acquisition of dam seat and submergence area and perusing LA cases for award, forest clearance, environmental clearance, NHAI clearance, and all other clearances which are required for dam construction. Construction of permanent two lane CC road for dam approach from SH or NH road, All structures coming under submergence i.e. culverts, bridges, roads etc., Concrete Overflow block, Energy Dissipation arrangement, Non-over flow blocks earthen dam including river training and construction of coffer dam, provision of environmental sluice and Vertical/Radial gates with hoisting arrangements, automatic lifting beam, automatic operated Monorail hoist, Stop log arrangements, gantry crane with rails arrangement, RCC T beam Deck slab bridge with minimum 7.5 meter width and foot bridge etc. and hoist supporting structures with primer anti corrosive and painting necessary as per IS CODE for all component of steel structure involved in construction, including removal of defect for 60 months in defect liability period, model study of the project Construction, Planning & Design of control room, Guest House, staff room and chaukidar quarter Building with supply of generator and procurement, supply and erection of DG set with required capacity for operation of all gates with one stand by generator and maintenance of all components for five years after completion of the project, including dam break analysis, Emergency action plan(EAP) preparation, gate operation manual, instrumentation in dam for monitoring and any other work as directed by the Engineer-in-Charge as per details given in scope of work. The work also includes Watch and ward, Management, Operation and Maintenance (MOM) for the Period of 60 months after completion and further extendable for another 60 months, including 60 months of defect liability period running simultaneously.
LCC PROJECTS PVT. LTD.
Karan Development Services PVT. LTD.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB