Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹6.3 L
EMD Value
₹6,250
Closing Date
8 Dec 2020, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC-I BSR
HYDEL COLONY BSR
Against Full Deposit Scheme For line shifting and give new connection under EUDD-BSR
2020_PVVNL_534458_1
T-42/20-21
Open Tender
Electrical Works
Item Rate
90 days
BULANDSHAHR
PLZ REFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,180
SE EDC-I
₹6,250
9 Dec 2020
2 Dec 2020
8 Dec 2020
2 Dec 2020
8 Dec 2020
2 Dec 2020
90 days
Amount
fo|qr uxjh; forj.k [k.M&cqyUn'kgj ds dk;Z{ks= ds vUrxZr iw.kZ tek ;kstuk en esa l;ksatu fuxZr djus lEcU/kh ,oa f'kf¶Vax lEcU/kh fofHkUu dk;ZA
Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about 0 to 60 Kms.
STP Pole 11 mtr Long.
PCC Pole 8.5 mtr Long.
Carriage of All line Material from store center BSR to j.e store Sub station as ACSR Weasel conductor, ACSR Dog conductor, GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Disc Insulator Pin Insulator etc.
Erection of Single pole support including complete fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of Double pole support including complete fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Double pole shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Carriage of All line Material from J.E store Sub station to Pit Site ACSR Weasel conductor, ACSR Dog conductor, GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Disc Insulator Pin Insulator etc.
fixing of Stay Set Complete
Laying, sagging. Stringing and binding and jumpering of ACSR Weasel conductor, ACSR Dog conductor, XLPE cable, newly erected pole and old existing Pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.
ACSR Dog conductor
ACSR Weasel conductor
3x70 sq mm 11Kv XLPE Cable
ABC cable 3 x50 sq mm
Recived back and loding/unloding Old T/F From site to je store/ ESC BSR. 63 KVA T/F
Recived back and loding/unloding Old T/F From site to je store/ ESC BSR. 25 KV T/F
Recived back and loding/unloding Old T/F From site to je store/ ESC BSR Iron Scraped
Fixing of 11KV PIN POLYMERIC INSULATOR
Fixing of Top chanel
Fixing of Droper chanel
Fixing of 11KV DISC INSULATER WITH FiTTING
Fixing of 11kv X arm V Type
Fixing of 11kv earthing COMPLITE
Fixing of earthing of support
Fixing of earthing of metering
Fixing of MS Channel
Fixing of MS Angle
Fixing of GI wire 6 & 10 SWG for garding
Fixing of 11 Kv Pilfer Proof meetering Qubicle
Fixing of 11 Kv CT/PT Metering pole mounted unit
The folloing material is required to be supplied by the contractor and Fixing at site.
MS Holding clamp
Suspencen clamp
Clamp with Nut & Bolt
Pearsing clamp
Dead & clamp
Stone Pad 300 x300 x 75 mm
Distribution Box 3 P
LT PCC Clamp With J Hook
GI Pipe 6 Dia
11Kv F Clamp
11Kv Cable jointing kit
Bolt & nut off size.
LT scackle Insulator
Concerating of stay & support
Installation of T/F 63 kva 11/0.4 kva
Installation of T/F 25 kva 11/0.4 kva
Earthing of T/F by MS Plate by Chemical process
Natural Earthing by Chemical process
Fanceing of T/F
Dismantalled old PCC Pole LT Line
NEHA ENTERPRISES
Vivek Electricals
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .