Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC | ₹10.4 L Quoted ₹9.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.3 LRejected-AOC | ₹10.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K.G.P. ENTERPRISES L1 | KAILASH ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Providing two legged scaffolding using 10-13 cm dia casuarina props, distance between two rows being 1.25m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including logitudinal and transverse middle braces to step up and providing a platform with C.W.Planks of 40mm thick and 1m width etc., complete using coir and nails | 1,898.7 | m2 | 99 ₹1,87,971.3 Lowest | 115 ₹2,18,350.5 |
| 2.00 | Colour washing with two coats of interior emulsion paint over one coat of primer including the cost of all materials, lead, lift, labour, T&P etc., complete and as directed by the Engineer Incharge of the work. | 1,587.3 | m2 | 234 ₹3,71,428.2 Lowest | 260 ₹4,12,698 |
| 3.00 | Colour washing with two coats with Exterior Emulsion paint over one coat of primer for outside wall including cost of all materials, labour, lead, lift, T & P etc. complete and as directed by the Engineer at site. | 1,202.1 | m2 | 237 ₹2,84,897.7 Lowest | 265 ₹3,18,556.5 |
| 4.00 | Painting two coats of synthetic enamel paint for iron works after through scrapping of rest including cost of all materials, Labour, lead, lift, T&P etc. complete and as directed by the engineer at site. | 74.8 | m2 | 159 ₹11,893.2 Lowest | 185 ₹13,838 |
| 5.00Providing 20mm and 25mm dia PVC line to Toilet, including cost of all materials, specials, labour, lead, lift etc., complete. | |||||
| 5.10 | 20 mm dia PVC pipe | 19.3 | Rm | 200 ₹3,860 Lowest | 220 ₹4,246 |
| 5.20 | 25 mm dia PVC pipe | 48.1 | Rm | 221 ₹10,630.1 Lowest | 235 ₹11,303.5 |
| 6.00 | Supplying, and fixing of Wired / Plain glass in the existing steel windows, including the cost of all materials, labour, lead, lift, T &P , etc. complete. | 9.8 | m2 | 2,040 ₹19,992 Lowest | 2,200 ₹21,560 |
| 7.00 | Supplying and fixing of PVC push type / Normal tap of 20/15 mm dia, including cost of materials, labour, lead lift etc. complete. | 9 | Nos | 348 ₹3,132 Lowest | 365 ₹3,285 |
| 8.00 | Providing and fixing in position of 20mm dia Angle cock, including fixing charges etc., complete. | 14 | Nos | 748 ₹10,472 Lowest | 770 ₹10,780 |
Tender Value
Refer Docs
EMD Value
₹8,900
Closing Date
7 Apr 2026, 2:00 pmClosed
CE/NCTPS-II
Office of CE/NCTPS-II Chennai-120
NCTPS II Civil Maintenance Circle Civil Maintenance Division Repair and Maintenance works to the Workshop Building at NCTPS-II
2026_EB_674616_1
CE/NCTPS-II/SE/CM/85/2025-26
Open Tender
Civil Works
Works
NCTPS-II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,900
Yes
3 Jul 2026
13 Mar 2026
8 Apr 2026
13 Mar 2026
7 Apr 2026
13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing two legged scaffolding using 10-13 cm dia casuarina props, distance between two rows being 1.25m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including logitudinal and transverse middle braces to step up and providing a platform with C.W.Planks of 40mm thick and 1m width etc., complete using coir and nails | 1,898.7 | m2 | - | - |
| 2 | Colour washing with two coats of interior emulsion paint over one coat of primer including the cost of all materials, lead, lift, labour, T&P etc., complete and as directed by the Engineer Incharge of the work. | 1,587.3 | m2 | - | - |
| 3 | Colour washing with two coats with Exterior Emulsion paint over one coat of primer for outside wall including cost of all materials, labour, lead, lift, T & P etc. complete and as directed by the Engineer at site. | 1,202.1 | m2 | - | - |
| 4 | Painting two coats of synthetic enamel paint for iron works after through scrapping of rest including cost of all materials, Labour, lead, lift, T&P etc. complete and as directed by the engineer at site. | 74.8 | m2 | - | - |
| 5Providing 20mm and 25mm dia PVC line to Toilet, including cost of all materials, specials, labour, lead, lift etc., complete. | |||||
| 5.1 | 20 mm dia PVC pipe | 19.3 | Rm | - | - |
| 5.2 | 25 mm dia PVC pipe | 48.1 | Rm | - | - |
| 6 | Supplying, and fixing of Wired / Plain glass in the existing steel windows, including the cost of all materials, labour, lead, lift, T &P , etc. complete. | 9.8 | m2 | - | - |
| 7 | Supplying and fixing of PVC push type / Normal tap of 20/15 mm dia, including cost of materials, labour, lead lift etc. complete. | 9 | Nos | - | - |
| 8 | Providing and fixing in position of 20mm dia Angle cock, including fixing charges etc., complete. | 14 | Nos | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Spec85.pdf
Tender Documents • 0.78 MB
BOQ_810825.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].