Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹36.6 LAccepted-AOC | L-1 | Accepted-AOC Awarded to lowest bidder | |
| 2 | L-2₹40.6 L+₹4.0 L (11.0%)Rejected-Finance | L-2 | Rejected-Finance Higher Amount | |
| 3 | L-3₹41.4 L+₹4.8 L (13.0%)Rejected-Finance VPO TEHSIL JAWALI DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | L-3 | Rejected-Finance Higher Amount | |
| 4 | L-4₹44.4 L+₹7.8 L (21.3%)Rejected-Finance VILLAGE MAJRA POST OFFICE BAROONA TEHSIL NALAGARH DISTT SOLAN HP | L-4 | Rejected-Finance Higher Amount | |
| 5 | L-5₹45.0 L+₹8.4 L (22.9%)Rejected-Finance | L-5 | Rejected-Finance Higher Amount |
Tender Value
₹51.3 L
EMD Value
₹83,900
Closing Date
18 Apr 2023, 11:00 amClosed
Executive Engineer
Executive Engineer JSV Division Nalagarh District Solan HP
LWSS Scheme of various Harizan Basti under Ramshehar District Solan (HP) Sub Head Providing and fixing automation system for LWSS Ramshehar and group of villages
2023_HPIPH_71986_1
165-225 dated 06-04-2023
Open Tender
Civil Works
Item Rate
90 days
Ramshehar
Please refer Tender documents.
7 documents required · 7 mandatory
₹800
₹83,900
Yes
31 May 2023
6 Apr 2023
18 Apr 2023
6 Apr 2023
18 Apr 2023
6 Apr 2023
Amount
A. Vertical frequency Energy saving starter pannal for Centrifugal pumps 150 HP X 3 Set:- Supply , Installation, Testing and Commissioning of Energy Saving Variable Frequency Starter Panel for centrifugal pump made out of 16 Gauge sheet, powder coated dust and vermin proof, wall/base mounted and front opening door type with copper insulated wiring suitable to operate 3 Nos. pumps (2 working & 1 stand by) each of the rating 150 HP . Starter should be capable enough to handle the following faults like short circuit, over current, under current, over voltage, under voltage, dry run protection and phase loss with LED ON/OFF & TRIP indicators, Power Quality Monitoring & Controlling Relay at the Incomer Feeder, Should be fitted with Surge Suppressor Device suiatble to protect against class-1 & 2 surges. complete in all respect as per direction of Engineer-in- Charge. Make: Adlec/Tricolite/Aarmation/Approved Make from JSV
Supply and Installation Energy Saving Variable Frequency Starter of 150 HP Heavy Duty for smooth start and smooth stop of pumps and for the energy conservation in the system. It Should be capable to monitor & control the frequecy of pumps through out the operation and to maintain the power factor of the system within acceptable limits. It should be able to withstand ambient temperature upto 50 Degrees celcius without derating and have conformal coating class 3C2, so that it can work in any harsh environment like moisture etc. Make: SIEMENS/ROCKWELL/APPROVED MAKE complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Electrical Logic to Operate 2 Pumps with 1 Variable Frequency Energy Saving Starter complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Multi function meter indicating different parameters like Current, Voltage, KWH, PF, THD etc. with RS 485 communication Make:- L&T/Conserve/Schnieder complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Main incomer MCCB of suitable capacity of L&T / Schnieder/ABB/Siemens make on the coming feeder for pumping set confirming to BIS 2516-1985 ( Latest edition).complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Individual Incommers MCCB of suitable capacity of L&T / Schnieder/ABB/Siemens make on the coming feeder for pumping set confirming to BIS 2516-1985 ( Latest edition).complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation LED Three phase indicating lamps complete with logged switches for individual motors conforming to BIS 3452 ( Part I & II ) latest with upto date ammendments.complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation LED On / Off & Trip indicator and push buttons, Control and power wiring,Power capacitor,Cooling fan 230 VAC, Contorl terminal, Bus Bar, i.e.Bolt, insulator, etc.complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Input Choke of required 150 HP for Energy saving variable frequency Starter which should be installed at the input of Energy saving variable frequency starter, so that there should be proper protection in case of any voltage surge and distortions. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Control Transformer complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Power and Control Wiring and Busbar complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Surge supressor device with Isolating MCCB to eliminate the power surges due to lightening and system surges. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Power quality monitoring & controlling relay with Control Contactor to safeguard the Electronic & Electric elements. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Independent Control Panel with Switch Fuse Unit and Fuses of Suitable Amperage to eliminate the KItKat fuses of HPSEB complete in all respect as per direction of Engineer-in- Charge.
Variable Frequency Energy Saving Starter Panel for Tubewell Submercible Pumps 7.5HP x 1 Sets
Supply , Installation, Testing and Commissioning of Energy Saving Variable Frequency Starter Panel for submersible pump made out of 16 Gauge sheet, powder coated dust and vermin proof, wall/base mounted and front opening door type with copper insulated wiring suitable to operate 1 Nos. pump (1 working ) of the rating 7.5 HP . Starter should be capable enough to handle the following faults like short circuit, over current, under current, over voltage, under voltage, dry run protection and phase loss with LED ON/OFF & TRIP indicators, Power Quality Monitoring & Controlling Relay at the Incomer Feeder, Should be fitted with Surge Suppressor Device suiatble to protect against class-1 & 2 surges. Make: Adlec/Tricolite/Aarmation/Approved Make from JSV complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Energy Saving Variable Frequency Starter of 7.5 HP Heavy Duty for smooth start and smooth stop of pumps and for the energy conservation in the system. It Should be capable to monitor & control the frequecy of pumps through out the operation and to maintain the power factor of the system within acceptable limits. It should be able to withstand ambient temperature upto 50 Degrees celcius without derating and have conformal coating class 3C2, so that it can work in any harsh environment like moisture etc. Make: SIEMENS/ROCKWELL/APPROVED MAKE complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Multi function meter indicating different parameters like Current, Voltage, KWH, PF, THD etc. with RS 485 communication Make:- L&T/Conserve/Schnieder. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Main incomer MCCB of suitable capacity of L&T / Schnieder/ABB/Siemens make on the coming feeder for pumping set confirming to BIS 2516-1985 ( Latest edition). complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation LED Three phase indicating lamps complete with logged switches for individual motors conforming to BIS 3452 ( Part I & II ) latest with upto date ammendments. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation LED On / Off & Trip indicator and push buttons, Control and power wiring,Power capacitor,Cooling fan 230 VAC, Contorl terminal, Bus Bar, i.e.Bolt, insulator, etc. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Input Choke of required 7.5 HP for Energy saving variable frequency Starter which should be installed at the input of Energy saving variable frequency starter, so that there should be proper protection in case of any voltage surge and distortions. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Control Transformer complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Power and Control Wiring and Busbar complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Cloud Gateway for data cloud at Server. complete in all respect as per direction of Engineer-in- Charge.
Variable Frequency Energy Saving Starter Panel for Tubewell Submercible Pumps 17.50 HP x 1 Sets
Supply , Installation, Testing and Commissioning of Energy Saving Variable Frequency Starter Panel for submersible pump made out of 16 Gauge sheet, powder coated dust and vermin proof, wall/base mounted and front opening door type with copper insulated wiring suitable to operate 1 Nos. pump (1 working ) of the rating 17.5 HP . Starter should be capable enough to handle the following faults like short circuit, over current, under current, over voltage, under voltage, dry run protection and phase loss with LED ON/OFF & TRIP indicators, Power Quality Monitoring & Controlling Relay at the Incomer Feeder, Should be fitted with Surge Suppressor Device suiatble to protect against class-1 & 2 surges. Make: Adlec/Tricolite/Aarmation/Approved Make from JSV Complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Energy Saving Variable Frequency Starter of 20 HP Heavy Duty for smooth start and smooth stop of pumps and for the energy conservation in the system. It Should be capable to monitor & control the frequecy of pumps through out the operation and to maintain the power factor of the system within acceptable limits. It should be able to withstand ambient temperature upto 50 Degrees celcius without derating and have conformal coating class 3C2, so that it can work in any harsh environment like moisture etc. Make: SIEMENS/ROCKWELL/JSV APPROVED MAKE complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Multi function meter indicating different parameters like Current, Voltage, KWH, PF, THD etc. with RS 485 communication Make:- L&T/Conserve/Schnieder. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Main incomer MCCB of suitable capacity of L&T / Schnieder/ABB/Siemens make on the coming feeder for pumping set confirming to BIS 2516-1985 ( Latest edition). complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation LED Three phase indicating lamps complete with logged switches for individual motors conforming to BIS 3452 ( Part I & II ) latest with upto date ammendments. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation LED On / Off & Trip indicator and push buttons, Control and power wiring,Power capacitor,Cooling fan 230 VAC, Contorl terminal, Bus Bar, i.e.Bolt, insulator, etc. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Input Choke of required 20 HP for Energy saving variable frequency Starter which should be installed at the input of Energy saving variable frequency starter, so that there should be proper protection in case of any voltage surge and distortions. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Control Transformer complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Power and Control Wiring and Busbar complete in all respect as per direction of Engineer-in- Charge.
Installation and Commissioning complete in all respect as per direction of Engineer-in- Charge.
PLC,HMI and Automation systemat stage 1st
Supply and Installation PLC (Programmable logic controller) with appropriate digital and analog inputs and outputs to give automatic command to Star Delta Starter Panel/ Energy Saving Variable Frequency Starter Panel Make Siemens/Bechoff Automation/Rockwell Automation complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Electronic relay card 8 channel complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation SMPS 4.5 Amps to energise PLC system complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation HMI (Human Machine Interface) 7" display for Monitoring and Controlling of Centrifugal pumps Make: APPROVED MAKE complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Control MCB for Automation System complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Ultrasonic Level Sensor to indicate the water level of tank remotely Make: Siemens/SBEM/ Approved Make complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Shielded Data Cable for Communication of Level Sensor with PLC complete in all respect as per direction of Engineer-in- Charge.
Installation, Commissioning and Software Development complete in all respect as per direction of Engineer-in- Charge.
Variable Frequency Energy Saving Starter Panel for Centrifugal Pumps 120 HP x 3 Sets
Supply , Installation, Testing and Commissioning of Energy Saving Variable Frequency Starter Panel for centrifugal pump made out of 16 Gauge sheet, powder coated dust and vermin proof, wall/base mounted and front opening door type with copper insulated wiring suitable to operate 3 Nos. pumps (2 working & 1 stand by) each of the rating 120 HP . Starter should be capable enough to handle the following faults like short circuit, over current, under current, over voltage, under voltage, dry run protection and phase loss with LED ON/OFF & TRIP indicators, Power Quality Monitoring & Controlling Relay at the Incomer Feeder, Should be fitted with Surge Suppressor Device suiatble to protect against class-1 & 2 surges. Make: Adlec/Tricolite/Aarmation/Approved Make from JSV complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Energy Saving Variable Frequency Starter of 120 HP Heavy Duty for smooth start and smooth stop of pumps and for the energy conservation in the system. It Should be capable to monitor & control the frequecy of pumps through out the operation and to maintain the power factor of the system within acceptable limits. It should be able to withstand ambient temperature upto 50 Degrees celcius without derating and have conformal coating class 3C2, so that it can work in any harsh environment like moisture etc. Make: SIEMENS/ROCKWELL/ANY APPROVED MAKE complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Electrical Logic to Operate 2 Pumps with 1 Variable Frequency Energy Saving Starter complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Multi function meter indicating different parameters like Current, Voltage, KWH, PF, THD etc. with RS 485 communication Make:- L&T/Conserve/Schnieder complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Main incomer MCCB of suitable capacity of L&T / Schnieder/ABB/Siemens make on the coming feeder for pumping set confirming to BIS 2516-1985 ( Latest edition).complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Individual Incommers MCCB of suitable capacity of L&T / Schnieder/ABB/Siemens make on the coming feeder for pumping set confirming to BIS 2516-1985 ( Latest edition).complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation LED Three phase indicating lamps complete with logged switches for individual motors conforming to BIS 3452 ( Part I & II ) latest with upto date ammendments. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation LED On / Off & Trip indicator and push buttons, Control and power wiring,Power capacitor,Cooling fan 230 VAC, Contorl terminal, Bus Bar, i.e.Bolt, insulator, etc. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Input Choke of required 120 HP for Energy saving variable frequency Starter which should be installed at the input of Energy saving variable frequency starter, so that there should be proper protection in case of any voltage surge and distortions. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Control Transformer complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Power and Control Wiring and Busbar complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Surge supressor device with Isolating MCCB to eliminate the power surges due to lightening and system surges. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Power quality monitoring & controlling relay with Control Contactor to safeguard the Electronic & Electric elements. complete in all respect as per direction of Engineer-in- Charge.
Independent Control Panel with Switch Fuse Unit and Fuses of Suitable Amperage to eliminate the KItKat fuses of HPSEB. complete in all respect as per direction of Engineer-in- Charge.
PLC,HMI and Automation systemat stage 2nd
Supply and Installation PLC (Programmable logic controller) with appropriate digital and analog inputs and outputs to give automatic command to Star Delta Starter Panel/ Energy Saving Variable Frequency Starter Panel Make SIEMENS/Bechoff Automation/Rockwell Automation complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Electronic relay card 8 channel complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation SMPS 4.5 Amps to energise PLC system complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation HMI (Human Machine Interface) 7" display for Monitoring and Controlling of Centrifugal pumps Make: APPROVED MAKE. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Control MCB for Automation System complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation of Ultrasonic Level Sensor to indicate the water level of tank remotely. complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Shielded Data Cable for Communication of Level Sensor with PLC. i/c all leads and lifts complete in all respect as per direction of Engineer-in- Charge.
Supply and Installation Installation, Commissioning and Software Development. complete in all respect as per direction of Engineer-in- Charge.
SCADA Software,Industrial PC,Printer,UPS and Table
Supply and Installation Industrial Grade 4U Rack mount PC 400Watt ATX Industrial Grade Power Supply Industrial Grade Mother board Intel core-i5 processor 8 GB RAM 480 GB SSD 2 x Ethernet Port 2 x Serial Com Port 4 x USB Port DVD R/W IPC Logitech Key board & mouse 26 " Dell make monitor Windows-10 Professional operating systems Supply and Installation Webaccess SCADA with 1500 Tag SCADA Supply and Installation Intelligent Communication Gateway for IoT application:- IOT Device with cloud Gateway Supply and Installation UPS 1 KVA :- UPS 1 KVA Supply and Installation Coloured Printer make HP, CANON :- Printer Supply and Installation Development of SCADA software :- Development
KULBINDER SINGH GOVT CONTRACTOR
Mohit Kaushal
AMERENDER SINGH
AMIT KUMAR THAKUR
SS ENGINEERING WORKS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .