| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC STREET NO 3 W NO 16 SUBHASH NAGAR GIDDERBAHA DISTT SRI MUKTSAR SAHIB 152101 PUNJAB | SRI MUKTSAR SAHIB | PUNJAB | 152101 | ₹1.5 Cr | L1 | Accepted-AOC Award of Contract RAJ KUMAR CONTRACTOR by the committee for the Lower Bidder than others |
| 2 | L2₹1.6 Cr+₹8.0 L (5.24%)Rejected-Finance GIDDERBAHA PUNJAB | ₹1.6 Cr+₹8.0 L (5.24%) | L2 | Rejected-Finance Higher tender rates from the lowest bidder |
| 3 | L3₹1.6 Cr+₹11.3 L (7.43%)Rejected-Finance GIDDERBAHA PUNJAB | ₹1.6 Cr+₹11.3 L (7.43%) | L3 | Rejected-Finance Higher tender rates from the lowest bidder |
| 4 | L4₹1.7 Cr+₹21.1 L (13.9%)Rejected-Finance PATIALA PUNJAB | ₹1.7 Cr+₹21.1 L (13.9%) | L4 | Rejected-Finance Higher tender rates from the lowest bidder |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
22 Feb 2024, 10:00 amClosed
Executive Engineer, Abohar Canal and Ground Water
Executive Engineer, Abohar Canal and Ground Water Division Water Resources, Abohar
Reconstruction/rehabilitation of concrete lining of Sukhchain Distributary from RD 63550-72480 OFF taking RD 365890/R Sirhind feeder
2024_WR_116761_4
E-Tendering Notice No.48/Abohar Canal Ground Water Division /2023-24 Dated 01/02/2024
Open Tender
Civil Works - Canal
Item Rate
Sri Muktsar Sahib
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
Yes
₹2.8 L
Yes
Executive Engineer, Abohar Canal and Ground Water
11 Mar 2024
1 Feb 2024
22 Feb 2024
2 Feb 2024
22 Feb 2024
2 Feb 2024
15 Feb 2024
Dismantling of brick Masonry laid in CSM (CSR 8.5 b)
Dismantling of Plain Concrete 1:3:6 ( CSR 8.6 c)
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads with disposal with an avg lead
"Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m.. CSR 6.19 "
Extra for compaction of earth including laying earth in 20cm layers, watering and rolling to specifications.[ CSR 24.5 b (i) & (ii) ]
E/work for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (up to 1.50 mtr depth) (CSR 19.19 a)
E/work for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (1.50 mtr - 3 mtr depth) (CSR 19.19 b )
Dressing of side slopes and preparation of subgrade for lining complete in all respect as per PWD specifications and engineer-in-charge. (CSR 19.2 b)
E/work in excavation in foundation/ trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 mt depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation. ( csr 6.6)
"Extra bitumen painting at 0.69 Kg. per Sqm (as per IS 3384-1985 ) ( csr 13.54) "
"Supplying and Laying LDPE film of 150 microm over sleepers (for construction & expansion joints) I/C carriage & loading unloading of all material complete in all respect as per PWD specifications and engineer-in-charge.(M-73) "
Shuttering for faces of Concrete(CSR 9.1)
Cement water slurry 1:3 with cement @ 2.25 kg per Sqmt as on prepared side slopes before laying concrete on side slopes including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and engineer-in-charge.(CSR Item 19.12)
Cement concrete lining 75mm thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km
"Providing and filling Construction joint sealing compound with coarse sand and 6 percent bitumen by weight complete as per drawings complete in all respect "
Dressing of earth work for new work or remodeling work Unit CSR 6.3 (i)
Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge exceeding 1.5 Cum/s but upto 4.5 Cum/s including boundary road[CSR 26.24 b]
Cement concrete lining 75mm thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km ( for sleeper and coping)
Sub Estimate : 1.1 - outlet on petrolling side E/W involved in constructing new O.F,A.P.M. or O.S.M. type outlets with 'H' more than 0.5 m but upto 0.9 m
Sub Estimate : 1.1 - outlet on petrolling side Dismantling O.F., A.P.M. Or O.S.M. type outlets consisting of total dismantling i.e. R.C. Slab and cement Masonry with 'H' more than 0.5m but upto 0.9 m
Sub Estimate : 1.1 - outlet on petrolling side PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
Sub Estimate : 1.1 - outlet on petrolling side RCC M-20 in superstructure
Sub Estimate : 1.1 - outlet on petrolling side First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
Sub Estimate : 1.1 - outlet on petrolling side Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
Sub Estimate : 1.1 - outlet on petrolling side Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. position complete.
Sub Estimate : 1.2 - outlet on non petrolling side E/W involved in constructing new O.F,A.P.M. or O.S.M. type outlets with 'H' more than 0.5 m but upto 0.9 m
Sub Estimate : 1.2 - outlet on non petrolling side Dismantling O.F., A.P.M. Or O.S.M. type outlets consisting of total dismantling i.e. R.C. Slab and cement Masonry with 'H' more than 0.5m but upto 0.9 m
Sub Estimate : 1.2 - outlet on non petrolling side PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
Sub Estimate : 1.2 - outlet on non petrolling side First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
Sub Estimate : 1.2 - outlet on non petrolling side RCC M-20 in superstructure
Sub Estimate : 1.2 - outlet on non petrolling side Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
Sub Estimate : 1.2 - outlet on non petrolling side Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. position complete.
Sub Estimate : 1.3 - distance mark Laying cement concrete 1:3 :6 (M-10) with stone ballast or shingle I/c supply and carriage of material at site of work complete in all respect
Sub Estimate : 1.3 - distance mark Laying R.C.C. 1:2 :4 (M-15) excluding steel reinforcement but including centering and shuttering and vibrating the concrete (precast concrete )
Sub Estimate : 1.3 - distance mark Bending binding and placing in position steel reinforcement
Sub Estimate : 1.4 - boundary pillar Laying R.C.C. 1:2 :4 (M-15) batch mixed with stone ballast or shingle
Sub Estimate : 1.4 - boundary pillar Bending binding and placing in position steel reinforcement 10 mm dia. Bars
Any Other
SURINDER SINGH CONTRACTOR
M/S Sanjeev Sehgal Contractor
TARSEM SINGH
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .