Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.7 L+₹4,200.01 (2.47%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.9 L+₹20,790.03 (12.2%)Admitted-Finance N A | FARIDABAD | HARYANA | 121004 | L3 | Admitted-Finance | ||
| 4 | L4₹1.9 L+₹23,793.03 (14.0%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹2.0 L+₹34,545.04 (20.3%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹2.1 L
EMD Value
₹4,200
Closing Date
14 Aug 2026, 4:00 pmClosed
Executive Engineer PWD RnB Division Chatroo
Executive Engineer PWD RnB Division Chatroo
Plz refrer BOQ
2026_PWDJK_319920_1
e-NIT No. 37 of 2026-27 Dated 07/08/2026
Open Tender
Civil Works
Percentage
30 days
Chatroo
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RnB Division Chatroo
₹4,200
20 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation by manual means over areas(exceeding 30 cm in depth and up to 1.50m depth 1.50 m in width as well as 10 sqm on plan ) , including disposal of excavated earth upto I metre for cutting of edges ,disposal earth to be leveled and neatly dressed.All kinds of soil . | 10.42 | cum | 436 | ₹4,543.12 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.12 | cum | 4,029.15 | ₹8,541.8 |
| 3 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.35 | cum | 8,552.85 | ₹11,546.35 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Crushed Aggregates. | 6.62 | cum | 4,943.4 | ₹32,725.31 |
| 5 | Brick work with common burnt clay F.P.S.(non-modualar) bricks of class designation 75 in foundation and plinth in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 4.2 | cum | 6,183.75 | ₹25,971.75 |
| 6 | Extra for brick work in superstructure above plinthlevel
upto floor V level. (By manual means) | 4.2 | cum | 1,323.65 | ₹5,559.33 |
| 7 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer.Using flas 30x6mm for diagonal braces and central cross piece. | 3.72 | sqm | 4,189.6 | ₹15,585.31 |
| 8 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. | 122.63 | kg | 79.25 | ₹9,718.43 |
| 9 | Centering and Shuttering including strutting, popping and removal of form work. Foundations: footings, bases of columns | 20.62 | sqm | 262.3 | ₹5,408.63 |
| 10 | Centering and Shuttering including strutting, popping and removal of form work . Suspended floors, roofs, landings, balconies and access platforms | 6.88 | sqm | 635.6 | ₹4,372.93 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1061543.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .