Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
16 Mar 2026, 3:30 pmClosed
Ashish Morla
Office of PMM-SH, CL-690 6th floor Vasudhara Bhavan ONGC Mumbai Bandra East.
Instrumentation control system maintenance and integration works at SH Complex
2026_ONGC_269288_1
YY1AL26013
Limited
Oil/Gas
Works
450 days
SH complex.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
17 Mar 2026
2 Mar 2026
17 Mar 2026
2 Mar 2026
16 Mar 2026
2 Mar 2026
Instrumentation & control system maintenance and integration works at SH Complex as per Scope of work.
Instrumentation Cable Management, Identification and Support Restoration Works at various locations of SH complex as per Scope of Work.
Replacement of Faulty or Leaking Tubings (ESD/FSD) as per Scope of Work.
Replacement of PGC Panel Gauges as per Scope of work.
Replacement of Faulty Panel Gauges in Unmanned SDP and Cleaning and Servicing of IUG components as per Scope of work.
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Tender.pdf
Tender Documents • 1.66 MB
BOQ_313615.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .