Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | ₹3.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.7 LRejected-AOC | ₹3.7 L | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SMV POWER SOLUTION L1 | General Engineering Works L2 |
|---|---|---|---|---|---|
| 1.00 | Overhauling & servicing of single pole Diverter of 132/33 KV 63/40/20 MVA Power Transformer. Details of work given below :-
1. Perform the pre-overhauling test :- Continuty test & ratio test.
2. Check OLTC munal operation, raise & lower side.
3. Drain the oil of OLTC Diverter Chamber & OLTC conservator Tank in clean & moisture free empty barrel.
4. Remove diverter switch assembly from diverter chamber after opening of OLTC cover.
5. Check & clean the corban deposition in the OLTC diverter switch chamber with the help of power transformer oil.
6. Cleaning of moving & fixed contacts of diverter switch and diverter chamber with the help of hot transformer oil.
7. Check & correct the diverter operation.
8. Check the value of transition (shunt) resistance in the resistance basket assembly.
9. Check & correct the looseness & tighteness of resistance basket assembly connection.
10. Replace the required material like contacts, top oil seal or O-ring including other consumable Item and after that fill the OLTC with oil checking BDV of oil (BDV should be min. 60 KV), fresh oil if required will be provided by UPPTCL.
11. Re-assemble of diverter switch after cleaning of diverter chamber & then check oil level in conservator tank.
12. Release the air from the OLTC chamber by changing the taps of OLTC manually.
13. Check for looseness & tighteness of the drive mechanism of OLTC.
14. Check & correct all the gear box & soft allignment (greasing of gear box).
15. Check & test all the electrical contacts & relay in diverter mechanism (MCB, Motor operation & Raise/Lower operation).
16. Check & correct all the electrical connection & diverter mechanism box & correct electrical operation through local control & remote control.
17. Perform post overhauling test : continuty test, ratio test).
Details of transformers :-
1. 132 KV S/S Karchhana - 40 MVA T/F-I (PME Make, Mfg-2012)
2. 132 KV S/S Koraon - 20 MVA T/F- I & II (ECE Make, Mfg-2012)
3. 132 KV S/S Meja - 63 MVA T/F (T&R Make, Mfg-2017)
4. 132 KV S/S Jari - 40 MVA T/F-I (Technical Associate Make, Mfg-2016)
5. 132 KV S/S Salayakhurd - 40 MVA T/F-I & II (Technical Associate Make, Mfg-2016).
6. 132 KV S/S Naini Complex - 40 MVA T/F-III (Technical Associate Make, Mfg-2018 | 8 | Job | 45,600 ₹3.6 L | 46,200 ₹3.7 L |
Updated dates
Tender Value
₹3.6 L
EMD Value
₹4,300
Closing Date
17 Oct 2025, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle-II, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj.
Servicing and overhauling of OLTC of Power Transformer installed at various 132 KV Sub-stations under ETD-III, Prayagraj.
2025_UPTCL_1080024_1
41/ETC-II(P)/2025-2026
Open Tender
Electrical Works
60 days
ETD NAINI PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer Electy. Trans. Div. Naini Alld.
₹4,300
29 Dec 2025
6 Oct 2025
18 Oct 2025
6 Oct 2025
17 Oct 2025
6 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.03 MB
Tender Documents
Tender Documents • 0.35 MB
BOQ
BOQ • 0.28 MB
Download all tender documents and submit your bid