Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance A 99 SECTOR 4 AIROLI NAVI MUMBAI 400708 | NAVI MUMBAI | THANE | MAHARASHTRA | 400708 | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Technical documents are not found in line with eligibility criteria |
| 4 | Rejected-Technical 24 DH SCHEME NO 74 C VIJAY NAGAR INDORE INDORE MADHYA PRADESH 452001 | INDORE | MADHYA PRADESH | 452001 | Rejected-Technical Technical documents are not found in line with eligibility criteria |
Tender Value
₹23.1 L
Closing Date
14 Oct 2021, 3:30 pmClosed
Superintending Engineer (EandAC), RRCAT
Office Of SE (E and AC), CSD building, RRCAT, Indore-452013
Comprehensive annual service and maintenance contract of VRF based HVAC system and cassette type split ACs for various labs at RRCAT, Indore
2021_RRCAT_650746_1
RRCAT/CSD/ACC/2021/20 dated 27.09.2021
Open Tender
Miscellaneous Works
Item Rate
365 days
RRCAT
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
21 Dec 2021
30 Sept 2021
18 Oct 2021
1 Oct 2021
14 Oct 2021
7 Oct 2021
Amount
Comprehensive annual maintenance contract of VRF systems with both heating and cooling option at INDUS II user's building & A Block building. Outdoor unit (Make: LG & Samsung) With hermetically sealed scroll compressor, condensing coil, microprocessor controller etc.connected to following Indoor units and accessories : (i) 3TR 4-way air flow cassette units – 18 Nos. (ii) 4TR 4-way air flow cassette units – 06 Nos. and accessories. (iii) 2TR 1-way air flow cassette units – 06 Nos.
Comprehensive annual maintenance contract of VRF systems with both heating and cooling option at UHV and MFL building. Outdoor unit (Make: Bluestar ) with hermetically sealed scroll compressor, condensing coil, microprocessor controller etc.connected to following Indoor units and accessories. (i) 2TR 4-way air flow cassette units – 05 Nos. (ii) 2TR High wall split type – 34 Nos. (iii) 1.5TR High wall split type – 20 Nos. (iv) 1TR High wall split type – 01 No.
Comprehensive annual maintenance contract of VRF systems with both heating and cooling option at ATF building. Outdoor unit (Make: Samsung) with hermetically sealed scroll compressor, condensing coil, microprocessor controller etc. connected to following indoor units and accessories. (i) 2 TR 4-way air flow cassette units – 02 Nos. (ii) 3 TR 4-way air flow cassette units – 04 Nos.
Comprehensive annual maintenance contract of VRF systems with both heating and cooling option at Precision Lab beam diagnostic building. Outdoor unit (Make: Midea) with hermetically sealed scroll compressor, condensing coil, microprocessor controller etc.connected to following Indoor units and accessories. 2TR 4-way air flow cassette units – 09 Nos.
Comprehensive annual maintenance contract of Cassette type ceiling mounted split ACs. for various labs.
4 TR ACs ( Invertor)
3 TR ACs. (Non Inverter)
2 TR ACs ( Non inverter )
2 TR ACs. (Inverter)
ALASKA INDUSTRIES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .