Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.9 LAdmitted-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Admitted-Finance | |
| 2 | L2₹74.6 L+₹4.6 L (6.64%)Admitted-Finance 16 PRATAP NAGAR CHARBHUJA RAWATBHATA RAJASTHAN 323307 | RAWATBHATA | CHITTORGARH | RAJASTHAN | 323307 | L2 | Admitted-Finance | |
| 3 | L3₹84.5 L+₹14.5 L (20.8%)Admitted-Finance 00 JALESAR MAHAVIR GANJ 00 VILLAGE TOWN JALESAR CITY ETAH ETAH UTTAR PRADESH 207302 INDIA | ETAH | UTTAR PRADESH | 207302 | L3 | Admitted-Finance | |
| 4 | L4₹85.1 L+₹15.1 L (21.7%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹1.2 Cr+₹49.6 L (70.9%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHIVAM ENTERPRISES L1 | Gupta Construction Co. L2 | Versha and Brothers L3 | Rare Solutions Pvt. Ltd. L4 | AARVANSS BUILDWELL AND INFRACON LLP L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00SUPPLY (Tower) | ||||||||
| 1.01 | Fabrication, Galvanising, Inspection & Supply of 132 KV DC Tower including stubs & extensions, as per drawing & BOM. | 51.06 | MT | - | - | - | - | - |
| 1.02 | Hot Dip Galvanised Nut & Bolts suitable for above towers. | 2 | MT | - | - | - | - | - |
| 2.00TOWER ACCESSORIES | ||||||||
| 2.01 | Number Plate | 5 | Nos. | - | - | - | - | - |
| 2.02 | Danger Plate | 5 | Nos. | - | - | - | - | - |
| 2.03 | Phase Plate | 5 | Set | - | - | - | - | - |
| 2.04 | Pipe type earthing material for towers | 5 | Set | - | - | - | - | - |
| 3.00HARDWARE FITTINGS SUITABLE FOR ACSR PANTHER CONDUCTOR | ||||||||
| 3.01 | Double Tension Fitting | 12 | Nos. | - | - | - | - | - |
Tender Value
₹1.3 Cr
EMD Value
₹1.4 L
Closing Date
2 Jan 2020, 1:00 pmClosed
SE ETC ALIGARH
LAL DIGGI ALIGARH
Raising Height of 132 KV Etah Ganjdundwara line between location no 49 and 50 Infringing in Jawaharpur TPS Railway Track under Deposit Scheme under ETD Mainpuri
2019_UPTCL_407403_3
ETC-92/2019-20
Open Tender
Electrical Works
Item Rate
90 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
SE ETC ALIGARH
₹1.4 L
23 Jun 2020
26 Dec 2019
3 Jan 2020
26 Dec 2019
2 Jan 2020
26 Dec 2019
Amount
SUPPLY (Tower)
Fabrication, Galvanising, Inspection & Supply of 132 KV DC Tower including stubs & extensions, as per drawing & BOM.
Hot Dip Galvanised Nut & Bolts suitable for above towers.
TOWER ACCESSORIES
Number Plate
Danger Plate
Phase Plate
Pipe type earthing material for towers
HARDWARE FITTINGS SUITABLE FOR ACSR PANTHER CONDUCTOR
Double Tension Fitting
Vibration Damper
120 KN Polymer Insulator
Single Tension Fitting
HARDWARE FITTINGS SUITABLE FOR 7/10 SWG EARTHWIRE
Tension Clamp
Vibration Damper
Survey including prepration of profile and schedule of materials, marking of locations (Route Length)
Check Survey and final peg marking. (Route Length)
Cost of excavation of 132 KV tower foundation pits including all earth work back filling watering and leveling. The work has to be done manually.
Setting of Stubs (02 Nos C+15, 02 Nos. C+5 and 01 No C+0) including all foundation work but excluding cost of concereting and excavation (rate per location) for 132 KV DC towers.
Cost of concreting for all types of 132 KV DC tower foundation including cost of cement, core sand, stone grid, dewatering, shoring and shuttering, forming, curing but excluding cost of reinforcement bars with 1:2:4 mix concrete with RCC, FS foundation.
Installation of steel reinforcement bars in RCC foundation including cost of cutting, welding, binding and placing them in foundation pits.
Erection of super structure of 132 KV DC tower and their extensions including all works above ground level and fitting of danger, number and phase plate, bird guard etc but excluding hoisting of insulator, hardware and accessories.
Tack welding of all the bolts up to the height of one section of 5 mtrs from ground level whichever is higher with three tacks of 10mm/12mm electrode and application of zinc point on the affected surface including cost of materials.
Carriage of new material such as conductor, hardwares, tower parts etc from store at 132 KV Substation, Etah to site near JTPS.
Destringing of ACSR Panther conductor from location no. 47 to 51. The work includes all destrining work required for proper completion of work no. of span = 01 job
Stringing of ACSR Panther conductor from tension to tension tower including all stringing work required for proper completion of work.
Destringing of Earthwire from location no. 47 to 51. The work includes all destringing work required for proper completion of work No. of span = 01 Job.
Stringing of Earthwire from tension to tension tower including all stringing work required for proper completion of work.
Dismantalling of existing foundation in all respect.
Dismantalling of 132 KV A+0 tower (Approx. 4 Ton)
Grounding work including earth work etc for pipe typerounding including the cost of coke & salt but excluding the cost of earhting material.
Carriage of all dismantalled material from site to store at 132 KV Substation, Etah.
Gupta Construction Co.
Versha and Brothers
Rare Solutions Pvt. Ltd.
AARVANSS BUILDWELL AND INFRACON LLP
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
document.pdf
Tender Documents • 0.63 MB
BOQ_609050.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .