Loading…
Loading…
Tender Value
₹2.8 Cr
EMD Value
₹2.8 L
Closing Date
28 May 2026, 3:00 pmClosed
The District Forest Officer
No. 2 District Forest Office Madurai, Race Course Road, Near District Court Complex Madurai., PIN-625002
Improvement and Maintenance works at Kutladampatti Water Falls in Sirumalai RF Sholavandhan Range in Madurai Forest Division
2026_TNFD_667440_3
5949/2021/D1
Open Tender
Civil Works
Works
Sholavandhan Range
Please refer RFP
8 documents required · 8 mandatory
₹0
₹2.8 L
District Forest Office, Madurai
28 May 2026
14 May 2026
29 May 2026
15 May 2026
28 May 2026
22 May 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Improvement and Maintenance of Water Falls bath area Platform | - | - | - | - |
| 2 | Dismantling RCC by manual / by using deploying machineries | 1 | cum | - | - |
| 3 | Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 20mm size hard broken stone jelly 60% and 12mm size hard broken stone jelly 40% excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. -Mixing by manual means | 1 | cum | - | - |
| 4 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works | - | - | - | - |
| 5 | Grade beam | - | sqm | - | - |
| 6 | column | 1 | sqm | - | - |
| 7 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | - | - | - | - |
| 8 | upto basement | - | kg | - | - |
| 9 | above basement | - | kg | - | - |
| 10 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | - | - | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.48 MB
TenderDocument_14.pdf
Tender Documents • 8.69 MB
BOQ_813605.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .