| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LAccepted-AOC | L1 | Accepted-AOC LER | |
| 2 | Rejected-Technical | - | Rejected-Technical ABOVE ER |
| Sl No | Description | Qty | Unit | R.SIVA KUMAR L2 | AK SURESH L1 |
|---|---|---|---|---|---|
| 1.001.CONSTRUCTION OF PANCHAYAT OFFICE BULDING IN PATHAPLAYAM VILLAGE IN PATHAPALAYAM PANCHAYAT | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. | 69.33 | SQ.M | 360 ₹24,958.8 | 263 ₹18,233.79 Lowest |
| 3.00 | Supplying and Filling foundation and basement with filling M. sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 21.48 | CUM | 2,500 ₹53,700 | 2,214 ₹47,556.72 Lowest |
| 4.00 | Filling in Basment with Excavated earth in layer of not more than 15cm thick well ramed,watered and compacted Complete complying with standard specification. | 32.63 | CUM | 55 ₹1,794.65 | 45 ₹1,468.35 Lowest |
| 5.00 | Plain Cement Concrete 1:4:8 mix using 40mm HBG metal from an approved quarry it from an site including cost and conveyance and materials of labour charges etc,.complete. | 34.94 | CUM | 6,500 ₹2,27,110 | 6,086.5 ₹2,12,662.31 Lowest |
| 6.00 | Brickworkin CM1:5 Mix using C,bricks size of 23x11x75cm for following including cost and conveyance and materials of all labour charges with complying,curing with standared specification etc,. Below | 23.88 | SQ.M | 6,500 ₹1,55,220 | 6,218 ₹1,48,485.84 Lowest |
| 7.00 | Brickworkin CM1:5 Mix using C,bricks size of 23x11x75cm for following including cost and conveyance and materials of all labour charges with complying,curing with standared specification etc,. Above | 38.71 | SQ.M | 6,500 ₹2,51,615 | 6,311 ₹2,44,298.81 Lowest |
| 8.00 | Supplying and Erecting for centering for sides and soffits including necessary supports and strutting upto 3.29mheight for plane surface in all floors with all cross bracing complete with standared specification etc,. | 71.21 | CUM | 650 ₹46,286.5 | 547 ₹38,951.87 Lowest |
| 9.00 | Supplying and Erecting for centering for sides and soffits including necessary supports and strutting upto 3.29mheight for plane surface in all floors with all cross bracing complete with standared specification etc,.Above | 231.19 | MT | 1,500 ₹3,46,785 | 1,095 ₹2,53,153.05 Lowest |
| 10.00 | Supplying and fabrication and placing position MS steel or Ribbed tor steel for all RCC works as per the design including necessary supports (MSRod or RTS bar will be supplied department) including binding wire charges etc,. | 4.04 | SQ.M | 91,858 ₹3,71,106.32 Lowest | 91,858 ₹3,71,106.32 Lowest |
Tender Value
₹30.9 L
EMD Value
₹62,000
Closing Date
27 Feb 2026, 4:00 pmClosed
BLOCK DEVELOPMENT OFFICE GUMMIDIPOONDI UNION
BLOCK DEVELOPMENT OFFICE GUMMIDIPOONDI UNION
CONSTRUCTION OF PANCHAYAT OFFICE BULDING IN PATHAPALAYAM VILLAGE IN PATHAPLAYAM PANCHAYAT
2026_RDTN_665778_1
RC/550/2025/A6
Open Tender
Civil Works
Item Rate
180 days
GUMMIDIPOONDI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹62,000
Yes
10 Sept 2026
24 Feb 2026
27 Feb 2026
24 Feb 2026
27 Feb 2026
24 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.CONSTRUCTION OF PANCHAYAT OFFICE BULDING IN PATHAPLAYAM VILLAGE IN PATHAPALAYAM PANCHAYAT | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. | 69.33 | SQ.M | 263.78 | ₹18,287.87 |
| 3 | Supplying and Filling foundation and basement with filling M. sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 21.48 | CUM | 2,214.4 | ₹47,565.31 |
| 4 | Filling in Basment with Excavated earth in layer of not more than 15cm thick well ramed,watered and compacted Complete complying with standard specification. | 32.63 | CUM | 45.85 | ₹1,496.09 |
| 5 | Plain Cement Concrete 1:4:8 mix using 40mm HBG metal from an approved quarry it from an site including cost and conveyance and materials of labour charges etc,.complete. | 34.94 | CUM | 6,086.98 | ₹2,12,679.08 |
| 6 | Brickworkin CM1:5 Mix using C,bricks size of 23x11x75cm for following including cost and conveyance and materials of all labour charges with complying,curing with standared specification etc,. Below | 23.88 | SQ.M | 6,218.23 | ₹1,48,491.33 |
| 7 | Brickworkin CM1:5 Mix using C,bricks size of 23x11x75cm for following including cost and conveyance and materials of all labour charges with complying,curing with standared specification etc,. Above | 38.71 | SQ.M | 6,311.1 | ₹2,44,302.68 |
| 8 | Supplying and Erecting for centering for sides and soffits including necessary supports and strutting upto 3.29mheight for plane surface in all floors with all cross bracing complete with standared specification etc,. | 71.21 | CUM | 547.5 | ₹38,987.48 |
| 9 | Supplying and Erecting for centering for sides and soffits including necessary supports and strutting upto 3.29mheight for plane surface in all floors with all cross bracing complete with standared specification etc,.Above | 231.19 | MT | 1,095 | ₹2,53,153.05 |
| 10 | Supplying and fabrication and placing position MS steel or Ribbed tor steel for all RCC works as per the design including necessary supports (MSRod or RTS bar will be supplied department) including binding wire charges etc,. | 4.04 | SQ.M | 91,858.5 | ₹3,71,108.34 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_799679.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
document.pdf
Tender Documents • 0.62 MB
BOQ_799679.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .