Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC VPO KAIRON TEHSIL PATTI DISTRICT TARN TARAN | TARN TARAN | PUNJAB | ₹1.2 Cr | L1 | Accepted-AOC Accept |
| 2 | L2₹1.2 Cr+₹6.0 L (5.19%)Rejected-AOC 66 RISHI VIHAR PHASE II MAJITHA ROAD AMRITSAR | AMRITSAR | AMRITSAR | PUNJAB | ₹1.2 Cr+₹6.0 L (5.19%) | L2 | Rejected-AOC Reject |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
3 Mar 2026, 11:00 amClosed
Executive Engineer
Construction Division No.3 Amritsar
Construction of Non 24x7 U.P.H.C Ghanupur Kale Amritsar
2026_CEPW_160464_2
Tender Notice No.27 Dt.13.02.2026c3
Open Tender
Civil Works - Buildings
Percentage
180 days
Amritsar
Please refer Tender documents.
20 documents required · 20 mandatory
₹10,000
Yes
₹2.9 L
Yes
17 Sept 2026
17 Feb 2026
3 Mar 2026
17 Feb 2026
3 Mar 2026
17 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF MAIN BUILDING (UPHC) | - | - | - | - |
| 2 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. | 398.53 | cum | 35.82 | ₹14,275.34 |
| 3 | Cement concrete 1:5:10 with 40 mm gauge stone ballast. using concrete mixing volumetric type | 46.89 | cum | 4,054.39 | ₹1,90,110.35 |
| 4 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 174.83 | cum | 6,224.76 | ₹10,88,274.79 |
| 5 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 295.74 | sqm | 221.24 | ₹65,429.52 |
| 6 | First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | 46.06 | cum | 6,099.53 | ₹2,80,944.35 |
| 7 | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in supersturcture. | 175.1 | cum | 7,014.88 | ₹12,28,305.49 |
| 8 | Extra Rate for First Floor (CSR No. 10.48) | 79.14 | cum | 190.68 | ₹15,090.42 |
| 9 | Extra Rate for Second Floor | 10.05 | cum | 381.37 | ₹3,832.77 |
| 10 | Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including attached pilasters buttresses etc. | 366.73 | sqm | 426.67 | ₹1,56,472.69 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_325888.xls
BOQ • 0.86 MB
SBD.pdf
Tender Documents • 18.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .