Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.4 L+₹1.5 L (18.9%)Rejected-AOC NATIONAL TOWER 5TH FLOOR SCO 89 DSC RANJIT AVENUE AMRITSAR 143001 PUNJAB | AMRITSAR | AMRITSAR | PUNJAB | 143001 | L2 | Rejected-AOC L2 |
Tender Value
₹9.5 L
EMD Value
₹19,000
Closing Date
25 Aug 2021, 5:00 pmClosed
Executive Engineer
Office of Executive Engineer WSS Division No 3 Amritsar
Repair and Maintenance of Three Number Chiller Units 250 TR Capacity each having total capacity 750 TR installed at Guru Teg Bahadur Diagnostic Centre Located at Guru Nanak Dev Hospital Amritsar
2021_WSS_70144_1
8261-8310 Three No Chiller Units 250 TR at SGTB
Open Tender
Civil Works
Item Rate
30 days
Amritsar
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
₹19,000
24 Sept 2021
16 Aug 2021
26 Aug 2021
16 Aug 2021
25 Aug 2021
16 Aug 2021
Amount
Chemically Descaling of Condenser Units by circulating chemical (SCALE-2) with the help of descaling pump and cleaning each copper tube with the nylon brush.
Servicing of condenser Motor, work including varnishing the startar, Changing ball bearing and greasing complete in all respect.
Servicing of Condenser Pump, Working including a) Dismantling the pump from foundation and housing. 'b) Opening the coupling of pump from motor shaft. 'c ) Aligning shaft of pump & motor. 'd) Changing both side ball bearing. 'e) Refilling the gland with Teflon thread. f) Installing new cast iron gland piece. g) Changing the seal. h) Refilling the grease. i) Charging Lubricant oil up to required level. j) Changing SS Bush of shaft. After Overhauling of pump, installing the pump on base foundation and attached with housing , alignment of pump shaft with Electric Motor.
Servicing of Chiller Motor, work including varnishing the startar, Changing ball bearing and greasing complete in all respect.
Servicing of Chiller Pump, Working including a) Dismantling the pump from foundation and housing. 'b) Opening the coupling of pump from motor shaft. 'c ) Aligning shaft of pump & motor. 'd) Changing both side ball bearing. 'e) Refilling the gland with Teflon thread. f) Installing new cast iron gland piece. g) Changing the seal. h) Refilling the grease. i) Charging Lubricant oil up to required level. j) Changing SS Bush of shaft. After Overhauling of pump, installing the pump on base foundation and attached with housing , alignment of pump shaft with Electric Motor.
Replacing of Microprocessor Three Card Circuit of Chiller no 1 by Company Authoried Engineer.
Day to day maintenance of AHU, FCU including Replacement of V-BELT, MCB, ELECTRICAL CONTACTOR, RELAY, SINGLE PHASE PREVENTOR.
NAFREF ENGINEERS PVT. LTD.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .