Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -16.22% | ₹1.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.1 L+₹20,661.53 (11.0%)Admitted-Fee/PreQual/Technical/Finance | -7.00% | ₹2.1 L+₹20,661.53 (11.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.2 L
EMD Value
₹6,720
Closing Date
29 Jul 2026, 4:00 pmClosed
Executive Engineer ID Ompora
Executive Engineer ID Ompora
Construction of cement concrete lining wall on left side of minor of lar canal at village SK.Pora at RD-10500 mtrs.
2026_IFC_314589_2
enit2of072026
Open Tender
Civil Works
Percentage
15 days
Budgam
Please refer Tender documents.
6 documents required · 6 mandatory
₹200
Chief Engineer Kmr I and FC Deptt.
₹6,720
3 Aug 2026
4 Jul 2026
30 Jul 2026
4 Jul 2026
29 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge. All kinds of soil : | 32.54 | cum | 187.3 | ₹6,094.74 |
| 2 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.
Beyond 30 cm girth upto and including 60 cm girth. | 1 | No | 379.05 | ₹379.05 |
| 3 | Dumping stone excluding cost of stones. in Horizontal on level | 6.53 | cum | 237.9 | ₹1,553.01 |
| 4 | Supplyof stone soling (nallah) nominal size 225 mm | 6.53 | cum | 700 | ₹4,569.6 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1.92 | cum | 5,202.9 | ₹9,989.57 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 93.9 | sqm | 286.35 | ₹26,888.27 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 19.84 | cum | 5,733.6 | ₹1,13,754.62 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.31 | cum | 6,591.25 | ₹21,817.04 |
| 9 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 coarse sand) | 67.25 | Sqm | 283.8 | ₹19,085.55 |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1.6 | cum | 218.4 | ₹349.44 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.36 MB
BOQ_1018645.xls
BOQ • 0.29 MB
extensionnitno2.pdf
PDF • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .