| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹81.7 LAccepted-AOC | ₹81.7 L Quoted ₹94.4 L | L-1 | Accepted-AOC Work allotted after financial approval from committee |
| 2 | L-2₹1.0 CrRejected-AOC | ₹1.0 Cr | L-2 | Rejected-AOC Work not allotted |
| Sl No | Description | Qty | Unit | Gowri Associates L1 | HS Associates L2 |
|---|---|---|---|---|---|
| 1.00 | Part-A (Supply of Material)
Holding Clamp for 11 KV Cross Arm | 960 | Nos. | 283.2 ₹2,71,872 | 290.28 ₹2,78,668.8 |
| 2.00 | Holding Clamp/DP Clamp | 143 | Nos. | 283.2 ₹40,497.6 | 295 ₹42,185 |
| 3.00 | Cable Holding Clamp | 40 | Nos. | 224.2 ₹8,968 | 230.1 ₹9,204 |
| 4.00 | MS Angle (65x65x6 mm) | 229 | Nos. | 1,003 ₹2,29,687 | 1,020.7 ₹2,33,740.3 |
| 5.00 | Pole Clamp | 24 | Nos. | 283.2 ₹6,796.8 | 300.9 ₹7,221.6 |
| 6.00 | Lug for conductor (off size) | 33 | Nos. | 41.3 ₹1,362.9 | 42.48 ₹1,401.84 |
| 7.00 | 11 KV F-Bracket | 662 | Nos. | 283.2 ₹1,87,478.4 | 295 ₹1,95,290 |
| 8.00 | Stone Pad (3000x300x75 mm) | 905 | Nos. | 106.2 ₹96,111 | 108.56 ₹98,246.8 |
| 9.00 | Number Plate with clamp and Nut & Bolt | 172 | Nos. | 283.2 ₹48,710.4 | 297.36 ₹51,145.92 |
| 10.00 | Danger board with clamp and Nut & Bolt | 727 | Nos. | 177 ₹1,28,679 | 174.64 ₹1,26,963.28 |
Tender Value
₹86.5 L
EMD Value
₹90,000
Closing Date
17 Nov 2025, 1:00 pmClosed
SE
EDC, B 690, Kamla Nagar, Agra
33 KV line strengthening work, 11 KV line strengthening work and 11 KV New line construction work on Semi-Turnkey basis in Business Plan 2025-26 under the area of EDD, Kiraoli and Kheragarh, Agra
2025_DVVNL_1088614_1
32/EDCA/2025-26
Open Tender
Electrical Works
90 days
EDC, B 690, Kamla Nagar
As per tender specification
2 documents required · 2 mandatory
₹3,540
www.dvvnl.org
₹90,000
14 Jan 2026
6 Nov 2025
17 Nov 2025
6 Nov 2025
17 Nov 2025
6 Nov 2025
Part-A (Supply of Material) Holding Clamp for 11 KV Cross Arm
Holding Clamp/DP Clamp
Cable Holding Clamp
MS Angle (65x65x6 mm)
Pole Clamp
Lug for conductor (off size)
11 KV F-Bracket
Stone Pad (3000x300x75 mm)
Number Plate with clamp and Nut & Bolt
Danger board with clamp and Nut & Bolt
Alu. Paint
Red Oxide Paint
Bracing Set
LT Incoming Panel with metering equipments fuse & Fire arrangement
Earth wire Clamp
Alu. Winding Wire
GI Barbed Wire
PG Clamp (Dog to Dog)
Nut & Bolt (off size)
Armoured Rod with ferrules
11 KV E-Bracket
33 KV F-Bracket
Alu. Jointing Sleeves
Garurding Angle for 11 KV
Gaurding Angle Holding Clamp for 11 KV
T-off Channel with Clamp
Holding Clamp for GI Pipe
Top Channel with Nut & Bolt
T Complete
Dropper Channel
Part-B (Erection work) Carriage of PCC Pole 8.5 Mtr. Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)
Carriage of ST Pole 9/11/13 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
Cartiage of Line Material from Store Center Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. Clamp for 11 KV V Type Cross Arm (694 Nos.), 33 KV Cross Arm V Type (203 Nos.), 33 KV Cross Arm Clamp for Pole (203 Nos.), Polymer Pin Insulator for 33 KV (393 Nos.), 33 KV Pin (408 Nos.), Polymer Pin Insulator for 11 KV (2389 Nos.), 11 KV Pin (2278 Nos.), Stay Set Complete (227 Nos.), MS Earthing Rod (851 Nos.), 33 KV Disc Fitting (48 Nos.), 33 KV Disc Insulator (3 Nos.), 11 KV Disc Fitting (576 Nos.), 11 KV Disc Insulator (418 Nos.), 11 KV DO Fuse Set (1 Nos), HDPE Pipe (490 Mtr.), GI Pipe 6" Dia (160 Mtr.), ACSR Weasel Conductor, Dog Conductor, Rabbit Conductor, Raccon Conductor, GI Wire 6 SWG (4472 Kg.), GI Wire 8 SWG (2144 Kg.), Stay Rod (70 Nos.), MS Angle for Hanging XLPE Cable (160 Kg.), 11 KV TPMO (1 Nos.), 33 KV TPMO (1 Nos.) etc and other line Material as required in Estimate/Package)
Cartiage of LT PVC Cable 3.5x150 sqmm (20 Mtr.), 33 KV XLPE Cable 3x300 sqmm (560 Mtr,), 11 KV XLPE Cable 3x120 sqmm (1480 Mtr.), 11 KV XLPE Cable 3x185 sqmm (1648 Mtr.) from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
Cartiage of 11 KV VCB from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.)
Cartiage of 33 KV Cable Jointing Kit 3x300 sqmm ID/OD (23 Nos), 11 KV Cable Jointing Kit 3x120 sqmm O/D (06 Nos.), 11 KV Cable Jointing Kit 3x185 sqmm OD/ID (30 Nos.), from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
Erection and grouting of PCC 8.5 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required suitable clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
Erection and grouting of PCC 8.5 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required suitable clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
Erection and grouting of ST Pole 09/11/13 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required suitable clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
Erection and grouting of ST Pole 09/11/13 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required suitable clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
Laying sagging stringing binding and jumpering of ACSR Weasel Conductor at 33/11 KV Line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
Laying sagging stringing binding and jumpering of Dog Conductor at 33/11 KV Line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
Laying sagging stringing binding and jumpering of Rabbit Conductor at 33/11 KV Line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
Laying sagging stringing binding and jumpering of Racoon Conductor at 33/11 KV Line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work.
Laying of 33 KV XLPE Cable 3x300 sqmm in trench with making loop, laying of bricks (18 nos. bricks in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc. complete work as RESPO norms as per RESPO Norms and direction by superivising Engineer.
Laying of 33 KV XLPE cable 3x300 sqmm (Double Circuit) Through H.D.P.E.pipe by drill machine/H.D.D. Machine including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine at a depth of 1.0 mtr. Below the ground level.
Laying of 33 KV XLPE Cable 3x300 sqmm through GI Pipe as per RESPO Norms and direction by superivising Engineer.
Laying of 11 KV XLPE cable 3x185 sqmm in trench with making loop laying of bricks (18 nos. bricks in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc., complete work as RESPO norms.
Laying of 11 KV XLPE cable 3x185 sqmm (Double Circuit) Through H.D.P.E.pipe by drill machine/H.D.D. Machine including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine at a depth of 1.0 mtr. Below the ground level.
Laying of 11 KV XLPE Cable 3x185 sqmm through GI Pipe as per RESPO Norms and direction by superivising Engineer.
Laying and stringing of 11 KV XLPE Cable 3x120 sqmm in trench with making loop laying of bricks (18 nos. bricks in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc., complete work as RESPO norms.
Laying of 11 KV XLPE Cable 3x120 sqmm through GI Pipe as per RESPO Norms and direction by superivising Engineer.
Installlation & Commissioning of 11 KV VCB Panel Complete with foundation, alignment, earthing, termination with all accessories as required at site as per RESPO Manual and direction by Supervising Engineer.
Installtion, Testing & Commissioning of 33 KV TPMO on newly erected existing structure including all accessories fixing arrangement, earthing, alignment and making propper electrical connections as per respo norms and direction by supervising engineer.
Installtion, Testing & Commissioning of 11 KV TPMO on newly erected existing structure including all accessories fixing arrangement, earthing, alignment and making propper electrical connections as per respo norms and direction by supervising engineer.
Filling of 33 KV Jointing Kit 3x300 sqmm OD and making connection as per direction by supervising engineer.
Filling of 11KV Jointing Kit 3x120 sqmm/3x185 sqmm (ID/OD) and making connection as per direction by supervising engineer.
Erection and grouting of stay set complete ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Erection of Stay Rod including excavation of pit, fixing of Rod with anchor plate in proper alignment backfilling, raming and compacting th soil and tightning with stay wire and insulator as per respo norms and direction by supervising engineer.
Fixing of MS Earthing Rod as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6/8 SWG including fabrication and fixing of guarding angle with holding clamps and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.
Concreting of Support PCC/ST Pole including the cost of arrangement of required material, labour, T&P etc for proper completion of work.
Concreting of Stay including the cost of arrangement of required material, labour, T&P etc for proper completion of work.
Fixing of 'T' Complete as per respo norms and direction by supervising engineer.
Fixing of 'T' off channel with clamp as per respo norms and direction by supervising engineer.
Fixing of F-Bracket for 33 KV as required on Poles as per RESPO norms and direction by supervising Engineer.
Fixing of E-Bracket for 11 KV as required on Poles as per RESPO norms and direction by supervising Engineer.
Fixing of F-Bracket for 11 KV as required on Poles as per RESPO norms and direction by supervising Engineer.
Fixing of GI Barbed Wire as required on Poles as per RESPO norms and direction by supervising Engineer.
Fixing of Alu. Winding Wire as required on Poles as per RESPO norms and direction by supervising Engineer.
Fixing of MS Angle (65x65x6 mm) as required on Poles as per RESPO norms and direction by supervising Engineer.
Fixing of P.G. Clamps (Dog to Dog) as per RESPO norms
erection of Bracing Set including lifting, positioning, alignment, bolting and tightning of all accessories complete in all respects as per RESPO norms and direction by supervising engineer.
Fixing of Danger Boards With clmap and Nut & Bolt (shock Proof, Rust Proofs) on Poles as per RESPO norms.
Fixing of Number plates on Poles as per RESPO norms.
Fixing of Al. Jointing Sleeves as per RESPO norms and direction by supervising engineer.
Fixing of Nut & Bolt as per RESPO norms and direction by supervising engineer.
Surface Preparation for Painting on ST Poles including cleaning, sanding and single coat of Red Oxide Paint as per RESPO norms and direction by supervising engineer.
Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint as per RESPO norms and direction by supervising engineer.
Strengthning of tilted Pole PCC/STP including excavation around pole alignment, refilling, ramming and proper consolidation complete as direction by Supervising Engineer.
Erection of Armoured Rods with ferruls on conductor including fixing, winding, alignment and all associated work complete as per respo norms and direction by supervising engineer.
Erection, Fixing and alignment of LT Incoming Panel on suitable foundation including making necessary connections, testing and commissioning as per respo norms and direction by supervising engineer.
Providing and Laying Earthing of VCB including required suitable GI Strip/copper wire form earth electrode to VCB frame/neutral point including clamping, welding/bolting as required completly As per respo norms and direction by supervising Engineer.
Marking of Poles on 33 KV/11 KV Lines by enamelled/paint & painting pole number directly on poles as per site numbering scheme and direction by Supervising Engineer. .
Moaling of Machine on foundation including alignment leveling, anchoring with cement concrete grouting and finishing complete in all respects.
33 KV Line Gaurding work including suitable clamps, wire and hardware fittings and finishing complete in all respects. Required material Provide by the contractor at his own cost.
Cutting/chopping of tree branches obstructing 33KV/11KV Lines & disposal of trimmed material complete as per direction by Supervising Engineer.
Sandries Providing of nuts, bolts, clamps, winding wire, tape & other petty items required for successful completion of the work completely.
Removal of old & Used ST Poles (11 Mtr.) and receive back to store center agra from work site along with loading unloading both ends (approx 50 to 90 km.).
HS Associates (BID ID -5670556)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
TechnicalBid32.rar
Tender Documents • 1.47 MB
BOQ_1997621.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid