| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC | ₹2.0 Cr | L1 | Accepted-AOC L1 Tenderer |
| 2 | L2₹2.0 Cr+₹5.5 L (2.77%)Rejected-Finance | ₹2.0 Cr+₹5.5 L (2.77%) | L2 | Rejected-Finance L2 Tenderer |
| 3 | L3₹2.0 Cr+₹6.3 L (3.16%)Rejected-Finance | ₹2.0 Cr+₹6.3 L (3.16%) | L3 | Rejected-Finance L3 Tenderer |
| 4 | L4₹2.2 Cr+₹19.7 L (9.98%)Rejected-Finance | ₹2.2 Cr+₹19.7 L (9.98%) | L4 | Rejected-Finance L4 Tenderer |
Tender Value
₹2.2 Cr
EMD Value
₹4.3 L
Closing Date
26 Jun 2023, 3:00 pmClosed
Project Director, DRDA, Chengalpattu
O/o of Project Director, DRDA, Chengalpattu
Construction and 5 Year Maintenance of the Bridge in Thathankuppam to K.K.Pudhur road at Ch 5 300km across MKM Kalkulam stream in Madhurandhakam Block having Pkg No. TN 34 03
2023_RDTN_125385_2
DIPR.2469.Tender.2023 dated.08.05.2023
Open Tender
Civil Works - Bridge Construction
Item Rate
270 days
Madurantakam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹4.3 L
21 Aug 2023
20 Jun 2023
26 Jun 2023
20 Jun 2023
26 Jun 2023
20 Jun 2023
Amount
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.(without dewatering).Dressing the bed.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.(with dewatering and shoring) in ordinary soil
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 .-(M15 grade-below sill) levelling course
Plain cement concrete for reinforced cement concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 - M20 grade (below sill)-cutoff wall
Construction of flexible apron Gabion stone boulders weighining not less than 25 kg beyond curtain wall
Reinforced Cement Concrete in substructure complete as per drawings and technical specifications Clause 802, 804, 805, 806, 807, 1202 & 1204- M30 grade(below sill)- footing
Reinforced Cement Concrete in substructure complete as per drawings and technical specifications Clause 802, 804, 805, 806, 807, 1202 & 1204- M30 grade(below sill)- abutment stem
Reinforced Cement Concrete in substructure complete as per drawings and technical specifications Clause 802, 804, 805, 806, 807, 1202 & 1204- M30 grade(below sill)-Pier column
Reinforced Cement Concrete in substructure complete as per drawings and technical specifications Clause 802, 804, 805, 806, 807, 1202 & 1204- M30 grade(above sill)-abutmentstem
Reinforced Cement Concrete in substructure complete as per drawings and technical specifications Clause 802, 804, 805, 806, 807, 1202 & 1204- M30 grade(above sill)-Pier column
Reinforced Cement Concrete in substructure complete as per drawings and technical specifications Clause 802, 804, 805, 806, 807, 1202 & 1204 M30 grade(above sill)-bedblock
Reinforced Cement Concrete in substructure complete as per drawings and technical specifications Clause 802, 804, 805, 806, 807, 1202 & 1204 M30 grade(above sill)-capping beam
providing weepholes in brick masonry/stone masonry, plan/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope 1(V):20:H) towsrds drawing face complete complete as per drawings and technical specifications Clauses 614, 709, 1204.3.7
Providing and fixing tar paper for bearing between bed block and deck slab
Providing and laying Reinforced Cement Concrete in superstructure complete as per drawings and technical specifications Clause 800, 1205.4 & 1205.5.-M30 grade-deck slab
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Providing & fixing PVC Expansion joint in between Deck Slab over Abutment & Piers as shown in the drawing including cost & conveyance of Expansion Joint including Shalimar Pad and Joint sealant etc., complete.
Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in Super structrue (bed block and dirt wall) complete as per drawings and technical specification Clauses 1002, 1010 & 1202
Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in Super structrue (deck slab) complete as per drawings and technical specification Clauses 1002, 1010 & 1202
P.C.C M15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clause 800 and 1211.-M15 grade-base course
Reinforced Cement Concrete M30 grade approach slab including reinforcement and Formwork complete as per drawing and technical specifications Clause 800 and 1211.-M30 garde-approach slab
Providing and laying plain cement concrete wearing course M 30 grade complete as per drawing and technical specifications Clauses 800 and 1206.3
Reinforced Cement Concrete in superstructure complete as per drawings and technical specifications Clause 802, 804, 805,806, 807, 1202 & 1204 .-M40 grade crashbarrier
Providing and Laying Parapet with PCC M 20 as per drawing and technical specifications Clauses 800 and 1208.4-M20 grade-parapet
Drainage spouts complete as per drawing and technical specifications Clause 1209
PCC Retaining wall along river
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.(with dewatering and shoring) Upto 3 m depth IN SOILS
Plain cement concrete for reinforced cement concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 - M20 grade (below sill)-retainingwall footing
Plain cement concrete for reinforced cement concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 - M20 grade -retainingwall stem
Providing & Fixing seepage pipes of 100mm PVC pipes of required lengths for abutments & wings including cost …..
APPROACH ROAD
Excavation for Formation including removal and satisfactory disposal of all materials necessary for the constuction of roadway and drain in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer (c)Formation of embankment using carted earth.
100% Compaction
98% Compaction
Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structure graded and compacted to meet requriement of Tables 300.1 and 300.2 as per Technical Specification Clause (Gravel Shoulder)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 401 Grading III
Providing, laying, spreading and compacting stone aggregates to Wet Mix Macadam specification including premixing the material with water at OMC in mechnical mix plant carriage of mixed material by tripper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibatory roller to achieve the desired density
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing, laying bituminous macadam with hot mix plant using crushed aggregates of grading as per table 500.4 premixed with bituminous binder transported to site upto lead of 1000m laid over a previously prepared surface with paver finisher to the requried grade, level and alignment and rolled to achieve the desired compaction as per technical specification clause 504.
Providing, laying and rolling of open graded premix carpet of 20 mm thick compossed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a 3 wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seel coat of either Type A or Type B or Type C as per technical specification clause 508
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SSK CONSTRUCTION
R.SAMPATH
SANKARANCONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .