Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical GRAM ROMI PADMA HAZARIBAGH | HAZARIBAGH | JHARKHAND | 825301 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical DMFT MADHARGAT TATICHHARIYA PRAHAND ANTARGAT KASTURBA GANDHI BALIKA AWASIYA VIDYALAYA TATICHHARIYA | KHUNTI | JHARKHAND | 835209 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical ASHOK NAGAR DIPUGUDA HAZARIBAG | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical AT PO NEAR MAHAVIR MANDIR TANDWA DIST CHATRA JHARKHAND 825321 | CHATRA | JHARKHAND | 825321 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical DISTRICT COUNCIL HAZARIBAGH | HAZARIBAGH | JHARKHAND | 825301 | Admitted-Fee/PreQual/Technical |
Tender Value
₹2.3 Cr
EMD Value
₹4.7 L
Closing Date
18 Aug 2026, 5:00 pmClosed
EXECUTIVE ENGINEER, NREP, HAZARIBAG
EXECUTIVE ENGINEER, NREP, HAZARIBAG
Construction of P.C.C. Road and Guard Wall from R.E.O. Road to Gurukuwtara Burha via Satwahi in Panchayat Dumraun, Block - Ichak, District - Hazaribag
2026_NREPH_117242_1
NREP/HAZARIBAG/10/2026 - 27
Open Tender
Civil Works
Percentage
304 days
ICHAK, HAZARIBAG
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹4.7 L
19 Aug 2026
11 Aug 2026
19 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area. | 0.49 | Ha. | 19,760.3 | ₹9,682.55 |
| - | Compacting original ground supporting subgrade (Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction.) | 1,459.2 | M3 | 52.6 | ₹76,753.92 |
| - | Construction of Subgrade and Earthen Shoulders (Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.) | 4,377.6 | M3 | 131.3 | ₹5,74,778.88 |
| - | Construction of Embankment with Material Deposited from Roadway Cutting (Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2.) | 637.63 | M3 | 61.48 | ₹39,201.49 |
| - | Granular Sub-Base with Coarse Graded Material (Table:- 400- 1)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
With Grading-I Material | 1,193.77 | M3 | 2,232.57 | ₹26,65,175.09 |
| - | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 | 1,473.79 | M3 | 6,460.73 | ₹95,21,759.27 |
| - | E/W in excavation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and brading, removal of stumps and other deleterious material and disposal utp a lead of 50m, dressing of sides and bottom backfilling in trenches with excavated suitable material. | 850.17 | M3 | 55.8 | ₹47,439.49 |
| - | Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3 | 312.92 | M3 | 2,390.62 | ₹7,48,072.81 |
| - | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
(P.C.C. Grade M-15) | 123.83 | M3 | 4,828.44 | ₹5,97,905.73 |
| - | Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203
Square Rubble Coursed Rubble Masonry (1st sort) in C.M. (1:3) | 206.8 | M3 | 4,753.41 | ₹9,83,005.19 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
TENDER_DOCUMENTS_10.pdf
Tender Documents • 1.03 MB
BOQ_158387.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .