Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.0 LAccepted-AOC | ₹29.0 L Quoted ₹58.1 L | L1 | Accepted-AOC As per MOM |
| 2 | L1₹29.0 LAccepted-AOC | ₹29.0 L Quoted ₹58.1 L | L1 | Accepted-AOC As per MOM |
| Sl No | Description | Qty | Unit | Mantu Kumar Nath L1 | Kamal Uddin L1 |
|---|---|---|---|---|---|
| 1.00Test Boring | |||||
| 1.01 | Making test bore hole of 50mm dia upto required depth below ground level and collecting sample of soil at every 3mt depth or wherever there is a change of strata in sample boxes with the distingushing marks for asertaining the water bearing strata including arranging and carraige of necessary boring materials/tools etc. all complete as directed. | 140 | KM | 375.35 ₹52,549 Lowest | 375.35 ₹52,549 Lowest |
| 2.00Detailed estimate for Boring and Installation of Tube Well | |||||
| 2.01 | Movement of drilling Rig , Tools & Plants, Accessories including drill pipes, casing pipes etc. to drilling site and back. | 100 | KM | 496.14 ₹49,614 Lowest | 496.14 ₹49,614 Lowest |
| 2.02 | Boring/drillingof bore hole up to 450mm dia and up to required depth by RC/DR Drilling Rig including supply and transportation of all required tools & Plants, materials & labour to site to perform the job in complete as directed in alluvium areas ( means areas where the strata comprises of loose, unconsiolidated materials like clays, silts, sands gravels, pebbles, cobbles and boulders) as per IS:2800 (part-1) of 1991. ( soil sample must be collected & keep properly at every 3.00 M interval of depth in boring. | 140 | Rm | 2,990.99 ₹4,18,738.6 Lowest | 2,990.99 ₹4,18,738.6 Lowest |
| 2.03 | Supply, lowering & installation in tube well 200mm PVC housing pipe / blind pipe of wall thickness of 10.0 mm to 11.2 mm for casing assembly including supply of well cap, sockets, reducer, MS housing clamps etc. as required as per IS : 12818-1997 of length 3.00 M of repute brand like Oriplast / Jindal / Prince etc. and as directed.
( Litholog Assembly diagram must be approved by Engineer-in-Charge of the work prior to installation) | 104 | Rm | 3,406.5 ₹3,54,276 Lowest | 3,406.5 ₹3,54,276 Lowest |
| 2.04 | Supply, lowering & installation in tube well 200mm PVC Ribbed Screen Filter pipe of wall thickness of10 mm to 11.2mm for casing assembly including supply of sockets, reducer etc. as required as per IS : 12818-2010 of length 3.00 M/2.00 M of repute brand like supreme/Oriplast / ashirbad/Astral/Jindal / Prince etc. and as directed.
( Litholog Assembly diagram must be approved by Engineer-in-Charge of the work prior to installation) | 36 | Rm | 4,783.8 ₹1,72,216.8 Lowest | 4,783.8 ₹1,72,216.8 Lowest |
| 2.05 | Shrouding the DTW assembly by river pea gravel of size 4 mm to 8 mm free from sand / dust and any other foreign materials after screening / stacking at site including supply, transportation, labour etc. complete as directed. | 29.2 | CM | 4,107.57 ₹1,19,941.04 Lowest | 4,107.57 ₹1,19,941.04 Lowest |
| 2.06 | Developing the tube well assembly by Air-Compressor of capacity 8-12 kg/cm2 and CFM=450 M3/min so as to get sand free discharge of water with supply of all required materials at site complete as directed including furnishing of litho-log / draw down data etc. as per IS : 11189 of 2020. ( For new DTW minimum 72 hours development is compulsory. Additional pea gravel required if any, during development would be extra )
The following data should be reflected in the report of development
1. Static water level
2. Drawdown at various discharge
3. Available average discharge | 64 | Hours | 2,836.31 ₹1,81,523.84 Lowest | 2,836.31 ₹1,81,523.84 Lowest |
| 2.07 | Supply, fitting-fixing of Heavy duty CIDF sluice valve inside screw, non raising, vertical spindle type with hand wheel operation need of water purpose. The rotation of closing should be counter clock wise. The holes of the flange should be drilled as per BSS No. 10 , Part-I, Table-D. All materials construction and components should strickly conform to IS : 14846-2000 and having marked with manufacturers name and trade mark in the delivery pipe layout as directed / as per drawing along with HD GI flange, pipe joining materials and painting in complete as directed.
(i) 100 mm dia | 4 | Job | 11,439.08 ₹45,756.32 Lowest | 11,439.08 ₹45,756.32 Lowest |
Tender Value
₹58.1 L
EMD Value
₹1.2 L
Closing Date
18 Sept 2025, 2:00 pmClosed
Superintending Engineer
Amolapatty Nagaon
Construction of underground PVC distribution system spout chamber boundary Fencing sign board Boring installation of TW Installation and commissioning Solar PV Module including mounting structures Construction of Control room
2025_ID_47018_1
SEI/T-27/ET-1/2025-26/634
Open Tender
Civil Works - Others
Item Rate
90 days
kaliabor
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,200
₹1.2 L
Yes
27 Oct 2025
27 Aug 2025
18 Sept 2025
27 Aug 2025
18 Sept 2025
28 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .