Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.6 L+₹78,546.39 (27.9%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.8 L+₹98,680.27 (35.0%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.3 L+₹1.5 L (53.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.7 L+₹1.9 L (65.7%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.8 L
EMD Value
₹9,700
Closing Date
7 Jul 2026, 4:00 pmClosed
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Laying/Providing M/S flanged pipes 8 dia from house of Fakeer Mohd and others with stair steps and allied works for left branch Buglinder Khul at Buglinder Tulail
2026_PWDJK_313754_3
InFC E-NIT No 17 2026-27 EE-RnB-Grz-2532-38 E-tendering Dated-25-06-2026
Open Tender
Civil Works
Percentage
60 days
Gurez
Please refer Tender documents.
5 documents required · 5 mandatory
₹200
Executive Engineer RnB Division Gurez
₹9,700
Executive Engineer RnB Division Gurez
10 Jul 2026
27 Jun 2026
8 Jul 2026
27 Jun 2026
7 Jul 2026
27 Jun 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil | 14.03 | Cum | 592.9 | ₹8,319.57 |
| 2 | Providing and Laying of Stone soling in horizantal all Carriage complete job. | 9.06 | Cum | 1,200 | ₹10,872 |
| 3 | Providing and Laying in position Cement concrete of specified grade including curing but excluding the cost of centering and shuttering.All work upto plinth level with 1:3:6 mix.(Nallah). | 8.41 | Cum | 5,500 | ₹46,255 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for.Stairs (excluding landings) except spiral staircases | 20.54 | Sqm | 851.5 | ₹17,489.81 |
| 4.01 | Foundations, footings, bases of columns etc. for mass concrete. | 12 | Sqm | 286.35 | ₹3,436.2 |
| 5 | Providing/laying /fitting of 200mm dia MS flanged pipes 6mm thickness with genset ,electrodes , flanges 6mm thick 64mm in height all carriages ,primer , nuts, bolts , washers , testing , commissioning all complete job.200mm dia. | 66 | RM | 5,850 | ₹3,86,100 |
| 6 | Carriage of Material by M/T incl. Loading , unloading and stacking complete job.Cement avg.lead for 35km. | 1.85 | MT | 511.48 | ₹946.24 |
| 6.01 | Sand avg.lead for 5km. | 3.78 | Cum | 200.74 | ₹758.8 |
| 6.02 | AGG. avg.lead for 5km. | 7.48 | Cum | 200.74 | ₹1,501.54 |
| 7 | Carriage of material by H/L incl. Loading , unloading and Stacking complete job. Cement 50.00 m | 1.85 | MT | 116.22 | ₹215.01 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_1015622.xls
BOQ • 0.25 MB
Extend17.pdf
PDF • 0.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .