Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.6 LAccepted-Finance | 1 | Accepted-Finance Admitted | |
| 2 | 2₹11.0 L+₹1.4 L (14.1%)Accepted-Finance | 2 | Accepted-Finance Admitted | |
| 3 | 3₹12.7 L+₹3.0 L (31.6%)Accepted-Finance | 3 | Accepted-Finance Admitted | |
| 4 | 4₹12.8 L+₹3.2 L (32.8%)Accepted-Finance | 4 | Accepted-Finance Admitted | |
| 5 | 5₹12.9 L+₹3.3 L (34.3%)Accepted-Finance HOUSING COLONY LEH | LEH LADAKH | LADAKH | 194101 | 5 | Accepted-Finance Admitted |
Tender Value
Refer Docs
EMD Value
₹24,060
Closing Date
14 Sept 2020, 4:00 pmClosed
Divisional Forest Officer Leh
Divisional Forest Office Fort road Leh
Construction of compound walling at Dambuchan fire wood depot Leh
2020_FEE_594_3
E-Tender (14 )of FDL of 2020-21
Open Tender
Civil Works - Others
Works
45 days
Dambuchan Leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Divisional Forest Office Leh
₹24,060
Yes
16 Sept 2020
9 Sept 2020
16 Sept 2020
9 Sept 2020
14 Sept 2020
9 Sept 2020
Amount
Earth work in excavation by mechanical means (Hudraulic excavator) over areas (exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, leasd up to 50m and lift up to 1.50m, disposed earth to be levelled and neatly dressed : All kind of soil
Earth work in excavation by mechanical means (Hudraulic excavator) over areas (exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, leasd up to 50m and lift up to 1.50m, disposed earth to be levelled and neatly dressed : Ordinary rock
P/l in position cement concrete of specified grade excl the cost of centering and shuttering all work up to plinth level crushed 1:4:8 mix
Random Rubble masonry with hard stone from nallah in foundation and plinth incl. levelling with cement concrete 1:6:12 mic with cement mortor 1:6 mix 1cement 6 coarse sand
Providing and fixing up to floor five level precast cement concrete solid blocks including hoisting andsetting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centring, shttering and complete 1:3:6 ( 1cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size)
providing and lying in position cement concrete of specified grade excluding the cost of centring and shuttering all work up to plinth level 1:2:4 (1cement : 2coarse sand : 4 graded stone aggregate 20mm nominal size.)
centering and shuttering including strutting propping etc and removal of form work for columns pillers piers abutment post and struts.
15mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1cement : 4 fine sand)
painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade. Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.
P/lying damp proof course 50mm thick with cement concrete 1:2:4 (1 cement :2coarse sand : 4 graded stone aggregate 20mm nominal size crushed )
Rough cast plaster up to 10m height abvoe ground level with a mixture of sand and grael or crushed stone from 6mm to 10mm nominal size dashed over and including the fresh plaster in two layer under layer 12mm cement plaster 1:3 (1cement:3 fine sand)mixed with 10% finely grounded hydrated lime.
providing and fixing steel gate .
Reinforcement for RCC work including straightening cutting bending placing all complete.
M/S JAMAL UD DIN
TSERING NAMGIAL
M/S RIGZEN WANGTAK
M/S TUNDUP YANGJOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .