Tender Value
₹3.3 Cr
EMD Value
₹6.7 L
Closing Date
7 Sept 2026, 12:00 pm
ACE PWD ZONE KOTA
ACE PWD ZONE KOTA
RJ-04-P4-05
2026_CERJ_149201_2
ACE PWD ZONE KOTA NITNO-15/2026-27
Open Tender
CIVIL
Percentage
240 days
BARAN
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,000
₹6.7 L
ACE PWD ZONE KOTA
17 Aug 2026
17 Aug 2026
7 Sept 2026
17 Aug 2026
7 Sept 2026
17 Aug 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRD Specification Clause 201. By Mechanical Means In area of thorny jungle | 3.45 | Per Hect | 29,384 | ₹1,01,374.8 |
| 2 | Construction of reference bench mark (1 No.), working bench mark (4 Nos.) and near all drainage structures and bridges (as per direction of Engineer-in-charge), reference pillar/ burgees @ 50m interval on both side of formation width including marking of centre line, setting out curves, recording of levels, white washing and lettering etc. complete as per MORD specifications cl. 108. | 4.5 | Per Km | 73,946 | ₹3,32,757 |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet equirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Specification Clause 301.5 | 17,454.44 | Per Cum | 149 | ₹26,00,711.81 |
| 4 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per MoRD Specification Clause
303 | 4,185 | Per Cum | 150 | ₹6,27,750 |
| 5 | Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete Earth, Sand, Morrum manure or sludge For 5 Km | 4,185 | Per Cum | 66 | ₹2,76,210 |
| 6 | Construction of granular sub-base by providing well graded crusher borken material, mixing in a mechanical mix plant at OMC , carriage of mixed material to work site upto lead of 1000m spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method
with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Specification Clause 401. For Grading III Material | 1,350 | Per Cum | 802.53 | ₹10,83,415.5 |
| 7 | Construction of granular sub-base by providing well graded crusher borken material, mixing in a mechanical mix plant at OMC , carriage of mixed material to work site upto lead of 1000m spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Specification Clause 401. For Grading I Material | 3,192.1 | Per Cum | 861.53 | ₹27,50,092.07 |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in
uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the
desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and MoRD Specification Clause 406. By Mechanical Means with 1 km lead | 2,063.3 | Per Cum | 1,415.32 | ₹29,20,233.29 |
| 9 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRD Specification Clause 502 | 13,676.45 | Per Sqm | 42.47 | ₹5,80,838.83 |
| 10 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRD Specification Clause 503. | 13,676.45 | Per Sqm | 13.48 | ₹1,84,358.55 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.12 MB
BOQ_234742.xls
BOQ • 0.34 MB
SBD-04-05.pdf
Tender Documents • 5.44 MB
OnlineBid-19March2021.pdf
Tender Documents • 3.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].