Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹1.7 LAccepted-AOC 1B 35 JAWAHAR NAGAR PO BERMO DIST BOKARO PIN 825104 JHARKHAND | BERMO | BOKARO | JHARKHAND | 825104 | ₹1.7 L | l1 | Accepted-AOC l1 |
| 2 | l2₹1.8 LRejected-AOC TETULMURI DHANBAD 00 00 TETULMURI SIJUA DHANBAD TETULMURI DHANBAD 00 00 TETULMURI SIJUA DHANBAD DHANBAD JHARKHAND INDIA | DHANBAD | JHARKHAND | 828121 | ₹1.8 L | l2 | Rejected-AOC l2 |
| 3 | l3₹1.9 LRejected-AOC BHANDARIDIH GIRIDIH | ₹1.9 L | l3 | Rejected-AOC l3 |
| Sl No | Description | Qty | Unit | RASHID MANJAR L1 | SUNRISE ENTERPRISES L2 | M/S NEEMA ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.01 | Dismantling of 8" dia M/S Pipeline (24 nos. x 6.15 m = 147.6 m) | 147.6 | metre | 135 ₹19,926 | 141.75 ₹20,922.30 | 146 ₹21,549.60 |
| 1.02 | Laying of 8" dia G.I. Pipeline (25 nos. x 6.15 m = 153.75 m) | 153.75 | metre | 178.89 ₹27,504.34 | 187.83 ₹28,878.86 | 193.2 ₹29,704.50 |
| 1.03 | Loading and unloading including transporting of 8" dia G.I. Pipeline | 25 | no. | 333 ₹8,325 | 350 ₹8,750 | 360 ₹9,000 |
| 1.04 | Cutting of 8" dia M.S./ G.I. Pipes for smooth surface making as required for flange (one side = 27") | 1,350 | inch | 12 ₹16,200 | 12.6 ₹17,010 | 12.96 ₹17,496 |
| 1.05 | Double layer welding of 8" dia M.S./ G.I. Pipes | 2,700 | inch | 14.68 ₹39,636 | 15.41 ₹41,607 | 15.85 ₹42,795 |
| 1.06 | Supply of G.I. Flange 08" dia (H.D.) | 50 | no. | 1,049 ₹52,450 | 1,101.45 ₹55,072.50 | 1,133 ₹56,650 |
| 1.07 | Making and fixing of Rubber Joints | 28 | no. | 112 ₹3,136 | 117.6 ₹3,292.80 | 121 ₹3,388 |
| 1.08 | Laying of 8" dia Sluice Valve/ NR Valve/ Foot Valve | 3 | no. | 800 ₹2,400 | 840 ₹2,520 | 864 ₹2,592 |
| 1.09 | Providing and fixing of M.S. Nut & Bolts | 152 | set | 19 ₹2,888 | 19.95 ₹3,032.40 | 20.52 ₹3,119.04 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹2.0 L
EMD Value
₹2,600
Closing Date
18 Oct 2024, 11:00 amClosed
P.E. (EnM), Karo OCP
Office of the P.O. (Karo OCP), P.O. Bermo, Dist. Bokaro, Jharkhand 829104
Dismantling and laying of 8 inch dia M.S. Pipeline required for diversion of the delivery pipeline of the 2000 G.P.M. Pump Motor Set installed at the A patch in Mine, involved in dewatering of the A patch, w.r.t. Karo OCP, under BnK Area.
2024_CCL_318943_1
P.E. (EnM)/ Karo OCP/ e-tender/ 2024-25/ 57
Open Tender
Electrical and Maintenance Works
5 days
Karo OCP
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,600
12 Mar 2026
9 Oct 2024
19 Oct 2024
9 Oct 2024
18 Oct 2024
10 Oct 2024
9 Oct 2024 - 18 Oct 2024
Amount
Dismantling of 8" dia M/S Pipeline (24 nos. x 6.15 m = 147.6 m)
Laying of 8" dia G.I. Pipeline (25 nos. x 6.15 m = 153.75 m)
Loading and unloading including transporting of 8" dia G.I. Pipeline
Cutting of 8" dia M.S./ G.I. Pipes for smooth surface making as required for flange (one side = 27")
Double layer welding of 8" dia M.S./ G.I. Pipes
Supply of G.I. Flange 08" dia (H.D.)
Making and fixing of Rubber Joints
Laying of 8" dia Sluice Valve/ NR Valve/ Foot Valve
Providing and fixing of M.S. Nut & Bolts
Total impact of GST for the purpose of CTC
SUNRISE ENTERPRISES
M/S NEEMA ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid