| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance | -38.38% | ₹4.6 L | L1 | Admitted-Finance |
| 2 | L2₹6.1 LAdmitted-Finance | -19.01% | ₹6.1 L | L2 | Admitted-Finance |
Tender Value
₹7.5 L
EMD Value
₹14,940
Closing Date
27 Apr 2026, 6:00 pmClosed
EXECUTIVE ENGINEER, PHED, PROJECT DIV.II BHARATPU
EXECUTIVE ENGINEER, PHED, PROJECT DIV.II BHARATPUR
Work of Operation and Maintenance of Regional Water Supply Scheme for 63 villages of District Deeg From Kumher Offtake under CDBP Project for 03 Month
2026_PHCJA_552854_1
01/2026-27
Open Tender
Civil Works - Water Works
90 days
EXECUTIVE ENGINEER, PHED, PROJECT DIV.II BHARATPU
Tec- copy of Registration Certificate, GST Registration, Experience Certificate and other as per TD
2 documents required · 2 mandatory
₹500
EXECUTIVE ENGINEER, PHED, PROJECT DIV.II BHARATP
₹14,940
Yes
30 Apr 2026
20 Apr 2026
28 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Daily/ periodical operation of valves at supply times for specified by department per sluice valve per month. (Valve rod and cap to be arranged by contractor) | - | - | - | - |
| 2 | 80-300mm | - | Nos | - | - |
| 3 | Maintenance of centrifugal pump motor sets including cost of rewinding of motor, material components & accessories required to repair pumpsets, starters, meters etc. of electric panels, deinstallation and re installation of pumpsets complete in all respect for per Centrifugal pump set with panel per month.maintenance of history sheet as directed by Engineer-in-charge for centrifugal pump sets per month.All pump set & pannels are presently in need of repairing.
Operated load of Centrifugal Pump sets (HP)
Specification & as per direction of Engineer-in-charge. | - | - | - | - |
| 4 | 41.0 HP to 50.0 HP | - | Nos | - | - |
| 5 | 61.0 HP to 70.0 HP | - | Nos | - | - |
| 6 | 71.0 HP to 80.0 HP | - | Nos | - | - |
| 7 | Non BSR Item | - | - | - | - |
| 8 | Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection &recording minimum 10 nos. residual chlorine samples during supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de- watering if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distributionpipelinenetworkwithinthescopeofworkfor per km pipe line per month, includingcostof material as required.
Minimum labour to be deployed (two fitter, fourbeldar) | - | KM | - | - |
| 9 | Supply of labour for O&M of pump House | - | - | - | - |
| 10 | Skilled Labour | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_985051.xls
BOQ • 0.28 MB
TD01.pdf
Tender Documents • 2.03 MB
Download all tender documents and submit your bid