| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAccepted-Finance | L1 | Accepted-Finance Bidder Accepted | |
| 2 | L2₹12.7 L+₹17,239.39 (1.38%)Rejected-Finance | L2 | Rejected-Finance Quoted Amount above the tender |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
29 Nov 2023, 4:00 pmClosed
Block Development Officer (V.Pt.), Vallioor
Block Development Office, Vallioor
Providing New Open well,Pumpset and Pipeline at Keelkulam Village in Erukkandurai Village Panchayat,Valliyoor Panchayat Union.
2023_RDTN_392971_1
B1/1410/2023pmagy
Open Tender
Civil Works
Works
180 days
Erukkandurai Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,000
Yes
30 Nov 2023
25 Nov 2023
29 Nov 2023
25 Nov 2023
29 Nov 2023
25 Nov 2023
Amount
Earthwork Open well excavation complying with relevant clauses of TNDSS well sinking with lead upto 10m in Hard Soil not requiring Blasting etc., complete (Top Soil) I st depth
Open well excavation complying with standard specification complying with TNSS Deepening of Well by Blasting and removing SDR not requiring blasting II nd depth
Open well excavation complying with standard specification complying with TNSS Deepening of Well by Blasting and removing SDR not requiring blasting III rd depth
Open well excavation complying with standard specification complying with TNSS Deepening of Well by Blasting and removing SDR not requiring blasting IV th depth
Open well excavation complying with standard specification complying with TNSS Deepening of Well by Blasting and removing hard rock measured in solid V th Depth
Open well excavation complying with standard specification complying with TNSS Deepening of Well by Blasting and removing hard rock measured in solid VI th Depth
Open well excavation complying with standard specification complying with TNSS Deepening of Well by Blasting and removing hard rock measured in solid VII th Depth
Open well excavation complying with standard specification complying with TNSS Deepening of Well by Blasting and removing hard rock measured in solid VIII th Depth
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, curing, compacting and consolidating concrete and other incidental charges etc., complete
Supplying and erection Centering for Sides and Soffits including necessory supports and structing for plain surfaces such as RCC slab, Lintel, Beam, Column, Sunshade etc., complete including cost and conveyance of all materials to site and other labour charges etc.,
Supplying and Fabrication, Placing in position of mild steel or Ribbed tor steel grills for RCC works including cost of Steel and binding wire, and conveyance of all materials to site, labour charges etc., complete
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, curing, compacting and consolidating concrete and other incidental charges etc., complete
Below 1.50m - 4.50m G.L
Below 0.00m - 1.50m G.L
Above 0.00m - 4.50m G.L
Refilling with the Excavated earth, Back filling between the Sidewalls and excavated portion, including labour charges for Filling, levelling and compacting etc., complete
Supplying and filling with filling sand in layers not more than 15 cm thick including labour charges for Filling, Levelling, watering, well rammed and compacted etc., complete For Flooring Filling material
Brick work with cement mortar 1:5 mix using Country bricks for Foundation, Basement and Superstructure inculding cost and conveyance of all materials to site, labour charges for curing and other incidental charges etc ,complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, curing, compacting and consolidating concrete and other incidental charges etc., complete
Plastering with Cement Morter 1:5 mix, 12 mm thick Smooth finish for Brick, RR masonry surface and other Concrete surfaces inculding cost and conveyance of all materials to site and all other labour charges, incidental charges etc., complete
MS.SMS ENGINEERING & TRANSPORT
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_468214.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .