| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAdmitted-Finance | ₹17.7 L | L1 | Admitted-Finance |
| 2 | L2₹20.8 LAdmitted-Finance | ₹20.8 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | TIRUPATI ELECTRICALS L1 | A B CORPORATION L2 |
|---|---|---|---|---|---|
| 1.00SUPPLY PART | |||||
| 1.01 | Supply of DSE3 live parts with both barrier insulators for Y & B phase including all other necessary equipments. Enclosure will be provided by department. | 2 | No | 5,00,000 ₹10 L | 7,65,000 ₹15.3 L |
| 1.02 | Acetone/alcohol | 5 | Ltr | 5,000 ₹25,000 | 5,000 ₹25,000 |
| 1.03 | Ethanol | 5 | Ltr | 3,000 ₹15,000 | 3,500 ₹17,500 |
| 1.04 | Cotton waste | 5 | Kg | 200 ₹1,000 | 250 ₹1,250 |
| 1.05 | Polythene plastic wrapping sheet | 2 | Mtr | 100 ₹200 | 100 ₹200 |
| 1.06 | Lint free paper | 1 | Lot | 3,500 ₹3,500 | 3,500 ₹3,500 |
| 1.07 | Fine emery paper | 5 | Sheet | 35 ₹175 | 50 ₹250 |
| 1.08 | Scotch brite | 2 | Sheet | 50 ₹100 | 75 ₹150 |
| 1.09 | Contact Greese | 1 | Cane | 2,500 ₹2,500 | 3,500 ₹3,500 |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
15 Jan 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
132 KV S/S Lalkuan Campus , Ghaziabad
supply and works for repairing of damaged 220 kv HGIS Pass module of 220 KV Muradnagar pratapvihar line bay
2025_UPTCL_1101211_1
T-25/ETC/GZB/2025-26
Open Tender
Electrical Works
90 days
220 KV S/S Pratap Vihar
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
AS PER NIT
₹20,000
15 Apr 2026
23 Dec 2025
15 Jan 2026
23 Dec 2025
15 Jan 2026
23 Dec 2025
SUPPLY PART
Supply of DSE3 live parts with both barrier insulators for Y & B phase including all other necessary equipments. Enclosure will be provided by department.
Acetone/alcohol
Ethanol
Cotton waste
Polythene plastic wrapping sheet
Lint free paper
Fine emery paper
Scotch brite
Contact Greese
WORK PART
This job includes complete dismantaling of 220KV Bushing, CT, DSE3 and all other associated equipment for all the 3 Phases of 220KV Muradnagar-Pratapvihar line after gas recovery. After that successful erection of live parts with barrier insulators of DSE3 for Y & B phase in DSE3 enclosure. Cleaning of DSE3 section of R phase for any spot or dust(SO2) has to be done. Reinstallation of DSE3 Compartment, CT and bushing for all the three phases.After complete erection evacuation and gas filling work has to be done for all the three phases. Pre and final stage commissioning testing as Dew point, CT test, CB timing, CRM,IR test,HV test , LCC functional test and all other required testing has to be done to complete the work satisfactorily. Rate includes lodging, boarding and food expenses of service engineer/manpower. Note: 1. All local conveyance facilities for supervision, dismantaling, erection, testing & commissioning of equipmnets and all testing equipments has to be arranged by contractor including transpotation. 2. All the required Testing kit, Gas recovery & evacuation machine has to be arranged by the contractor.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_2029581.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
doc_25.pdf
Tender Documents • 2.50 MB
BOQ_2029581.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid