Tender Value
₹29.6 L
EMD Value
₹59,200
Closing Date
23 Sept 2026, 5:00 pmDue today
Smt Priyanka Saini
Municipal Corporation Karnal
Relaying of 80mm thick IPB in various streets of Sector 13 Extension and Sector 13 New Housing Board, Ward No. 10, Municipal Corporation Karnal.(Only for L/C Societies)
2026_HRY_548103_1
2026A8939EE8 5BF3 468F 96EB C9D79D444016747ULB
Open Tender
Civil Works
Works
90 days
Karnal
2 documents required · 2 mandatory
₹5,000
₹59,200
Yes
16 Sept 2026
16 Sept 2026
24 Sept 2026
16 Sept 2026
23 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 684.08 | cum | 1,863 | ₹12,74,441.04 |
| 2 | [17.69.3]Interlocking Concrete Block Pavement 3. Providing and Laying 60 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 35 over the bed of 25 mm thick fine sand complete in all respect. [Through Rate] | 855.1 | Sqm | 576 | ₹4,92,537.6 |
| 3 | [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | 8,551 | Sqm | 26 | ₹2,22,326 |
| 4 | [17.71]Relaying of available (removed and stacked) Interlocking Paver Block Pavement having thickness 100mm/80 mm/ 60 mm (average = 80mm) as per drawings and Technical Specification Clause 1504 [Through Rate] | 7,695.9 | Sqm | 66 | ₹5,07,929.4 |
| 5 | [3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km] | 822.01 | cum | 66 | ₹54,252.66 |
| 6 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] | 684.08 | cum | 83 | ₹56,778.64 |
| 7 | [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate] | 69.52 | cum | 460 | ₹31,979.2 |
| 8 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 92.1 | cum | 3,476 | ₹3,20,139.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_627797.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .