Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.9 LAccepted-AOC | ₹34.9 L | L1 | Accepted-AOC QUALIFY |
| 2 | L1₹34.9 LRejected-AOC | ₹34.9 L | L1 | Rejected-AOC DISQUALIFY |
Tender Value
₹41.1 L
EMD Value
₹41,500
Closing Date
1 Dec 2025, 5:00 pmClosed
Superintending Engineer
Rural Works Division Jajpur, Bhagabatpur, 755001
Construction of Sub- Center Building at Rekabibazar under Jajpur Block in Jajpur District for 2023-24
2025_CERWI_121763_21
Tender Online 04 jjpt 2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
270 days
Jajpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹41,500
Yes
24 Aug 2026
25 Nov 2025
2 Dec 2025
25 Nov 2025
1 Dec 2025
25 Nov 2025
25 Nov 2025 - 29 Nov 2025
Earth work in excavation in foundation in hard soil including hard moorum, stony earth mixed with boulders (except sheet rock & boulders requiring blasting) with all leads & lifts including dressing and leveling the bed and depositing the excavated earth at places away from work site with all leads & lifts including cost of all labour, cess & T&P and dewatering if required for the work etc. complete and as directed by the Engineer-in-charge.
Filling in foundation and plinth with sand, watered & rammed including all cost of materials, labours, conveyence, etc all complete as per the direction of E.I.C
Cement concrete (1:3:6) with 4cm size crusher broken hard granite metals including all cost of materials, labour, conveyance, royality, watering, curing etc. all complete as per the direction of E.I.C
Fly Ash brick masonary in Cement Mortar (1:6) in foundation/Superstructure using-Fly Ash.-brick of 23cm X 11cm X 8cm size having a crushing strength in between 75kg to 100 kg per Sq.cm with dimensional tolerance ± 8% including splays cutting circular moulding chamfering & corbelling watering and curring for 7days after immersing the bricks in water for six hours before use etc. complete including cost & conveyance of all materials & labour required for the work with all taxes & royalties with all T&P & cess etc, complete in all respect as per the direction of Engineer-in-charge.
Providing and laying Reinforced cement concrete of M-20 grade with 20mm and down grade clean crusher broken granite chips aggregate of approved quality from approved quarry including hoisting, lowering & levelling in position to required level in each layer not exceeding 15cm thick including frame work where necessary ramming using vibrator to proper slope and levelling curing dewatering if necessary with cost, conveyance taxes royalty labour of all materials and including hire and running charges of machinaries T&P required for the work including supplying and working of pumps and cess as per the specification and direction of Engineer-in-charge.
GROUND FLOOR
(i) Column Base footing-
(ii) Plinth Beam :-
( iii ) Column Supt
(iv) Lintel Band
(v) Chajja:-
(vi) Wall Beam
(vii) Roof Slab
(viii) Staircase
FIRST FLOOR
( iii ) Column Supt
(iv) Lintel Band
(v) Chajja:-
(vi) Wall Beam
(vii) Roof Slab-
(viii) Staircase
Cutting, bending, binding & placing in position MS bar reinforcement complete as per drawing & technical specifications with all cost of materials, labour, conveyence, etc all complete as per the direction of E.I.C
GROUND FLOOR
FIRST FLOOR
Brick work with Fly ash bricks 25cm x 12cm x 8cm size having crusing strength not less than 75kg/cm^2 with dimesional tolerance +/- 2% in cement motar (1:6) with all cost of materials, labour, coveyance, royality, watering, etc all complete as per the directions of E.I.C
GROUND FLOOR
FIRST FLOOR
16mm thick cement plaster (1:6) for brick or concrete work with all cost of materials, labour, conveyence, watering, curing, etc. all complete all complete as per direction of EIC
GROUND FLOOR
FIRST FLOOR
12mm thick cement plaster (1:6) for brick or concrete work with all cost of materials, labour, conveyence, watering, curing, etc all complete as per direction of EIC
GROUND FLOOR
FIRST FLOOR
6mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chiping and slurry treatment with all cost of all materials, labour, conveyence, etc. all complete as per the directions of EIC
GROUND FLOOR
FIRST FLOOR
2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips. On new work with all taxes royalties & cess etc, complete as per direction of Engineer-in-charge.
FIRST FLOOR
Supplying & fixing vitrified tile in floors of size 600mm x 600mm of approved make conforming to IS: 15622 laid on 20mm thick cement mortar (1:4) and filling joints with white cement of approved quality including all cost of all materials, labour, T&P, conveyence, watering, curing, etc all complete as per the directions of EIC
GROUND FLOOR
FIRST FLOOR
Fixing Ceramic tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. complete in all respect as per the direction of Engineer in Charge.
Fixing chequred tile in floor kirting and in rises of steps on 20mm thick bed of cement plaster (1:4) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. complete in all respect as per the direction of Engineer in Charge.
Finishing surface of wall with cement based wall putty ( water Based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete in all respect as per the direction of Engineer in Charge.
GROUND FLOOR
FIRST FLOOR
Wall Priming one coat with any approved shade of primer ( WBD ) on New Plastered surface of with any approved primer including cost of primer ( water Based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete in all respect as per the direction of Engineer in Charge.
GROUND FLOOR
FIRST FLOOR
Distempering two coats with any approved shade including cost of distemper on New Plastered surface including cost of distemper of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete in all respect as per the direction of Engineer in Charge.
GROUND FLOOR
FIRST FLOOR
Painting of old/ new wall surfaces 2 coats with any weather coat paint of approved quality, shade & make with all cost of materials, labour, conveyence, taxes, etc all complete as per the directions of Er i/c.
GROUND FLOOR
FIRST FLOOR
Providing and fixing factory made UPVC door with door frame of required length (shape & size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc.
GROUND FLOOR
FIRST FLOOR
Supplying , Fitting, fixing up window (sliding type) made up aluminium section 9778 as windows frame, section No 4095, 4096 and 9777, 3994 as shutter frame with 5mm thick plain glass as panel fitted with rubber beading including locking arrangement including all fitting including all cost of materials, labour, T&P, etc all complete as per direction of E.I.C
GROUND FLOOR
FIRST FLOOR
Supplying, fitting, fixing of stainless steel of 304 in hand grade railing using 50 mm dia of 2mm thick circular pipe with balustrade of size 32mm x 32mm x 2mm @ 0.90m c/c and stainless steel square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in staircase as per approved design & specification, buffing, polishing, etc. with all cost of all materials, labour, conveyence, T&P, etc all complete as per the direction of E.I.C
Supplying,fitting and fixing M.S. made doors and windows in posituion including all etc. complete as per the direction of E.I.C
GROUND FLOOR
FIRST FLOOR
Painting two coats of enamel paint in all floors to new iron work over a coat of primer including sand papering,polishing the surface,including cost conveyance royalties and all taxes of all materials alongwith T&P required for the work including cost of paint & primer complete in all respect as per the direction of Engineer in Charge.
GROUND FLOOR
FIRST FLOOR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
Tendernotice_2.pdf
PDF • 3.79 MB
BOQ_566890.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .