| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.6 CrAdmitted-Finance | ₹30.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹32.2 CrAdmitted-Finance EN 62 7TH FLOOR SALTLAKE CITY KOLKATA SECTOR V WEST BENGAL 700091 | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹32.2 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Tender Documents not as per requirement |
| 4 | Rejected-Technical | - | - | Rejected-Technical Tender Documents not as per requirement |
| Sl No | Description | Qty | Unit | Gupta Power Infrastructure Limited L2 | M M Brothers L1 |
|---|---|---|---|---|---|
| 1.00Supply of following materials/items, F&I and GST including loading, unloading & Proper stacking at work place/sites. | |||||
| 2.00 | S.T. Pole 13 Mtr long | 254 | No. | 54,000 ₹1.4 Cr | 34,000 ₹86.4 L |
| 3.00 | S.T. Pole 11 Mtr long | 209 | No. | 43,961.94 ₹91.9 L | 24,500 ₹51.2 L |
| 4.00 | PCC Pole 8.5 Mtr long | 88 | No. | 4,689.63 ₹4.1 L | 2,300 ₹2.0 L |
| 5.00 | Aluminium Single Core Flaxible Cable 25 sqmm | 350 | Mtr | 64.86 ₹22,699.53 | 100 ₹35,000 |
| 6.00 | AB Cable (1x16+1x25) sqmm | 400 | Mtr | 60.96 ₹24,385.78 | 68 ₹27,200 |
| 7.00 | AB Cable (3x95+1x70+1x16) sqmm | 3,300 | Mtr | 520.14 ₹17.2 L | 477 ₹15.7 L |
| 8.00 | AB Cable (3x120+1x95+1x16) sqmm | 1,500 | Mtr | 656.34 ₹9.8 L | 595 ₹8.9 L |
| 9.00 | LT Distribution Box (Three Phase) with clamp | 80 | No. | 1,607.76 ₹1.3 L | 65,000 ₹52 L |
| 10.00 | L.T. XLPE Cable 1x400 sqmm | 60 | Mtr | 800.32 ₹48,019.24 | 565 ₹33,900 |
Tender Value
₹48 Cr
EMD Value
₹48 L
Closing Date
11 May 2022, 4:00 pmClosed
Superintending Engineer (MM-II)
MVVNL, 4-A, Gokhale Marg, Lucknow
Underground cable laying work of HT overhead lines, construction of new HT/LT lines, erection of 11/0.4KV LT substations and other associated construction works including dismantling of existing line in Ayodhya city under EDC Ayodhya, MVVNL (U.P.) on
2022_MVVNL_682515_3
MEDCO/2644/2022
Open Tender
Electrical Works
180 days
Ayodhya Circle
As per tender documents
2 documents required · 2 mandatory
₹11,800
EE To MD MVVNL A/c No 10101985738 IFSC SBIN0003347
₹48 L
Yes
20 May 2022
6 May 2022
12 May 2022
6 May 2022
11 May 2022
6 May 2022
Amount
Supply of following materials/items, F&I and GST including loading, unloading & Proper stacking at work place/sites.
S.T. Pole 13 Mtr long
S.T. Pole 11 Mtr long
PCC Pole 8.5 Mtr long
Aluminium Single Core Flaxible Cable 25 sqmm
AB Cable (1x16+1x25) sqmm
AB Cable (3x95+1x70+1x16) sqmm
AB Cable (3x120+1x95+1x16) sqmm
LT Distribution Box (Three Phase) with clamp
L.T. XLPE Cable 1x400 sqmm
11 KV XLPE Cable 3x185 sqmm (including jumpering work)
11 KV outdoor Jointing Kit for 3x185 sq mm XLPE Cable
11 KV Staight Through cable Jointing Kit for 3x185 sq mm XLPE Cable
33 KV 3x300 sqmm XLPE Cable (including jumpering work)
33 KV outdoor Jointing Kit for 3x300 sq mm XLPE Cable
33 KV Staight Through cable Jointing Kit for 3x300 sqmm XLPECable
ACSR Weasel Conductor
ACSR dog Conductor
T/F 63 KVA
T/F 250 KVA
Top channel (125x65 mm 2240 mm long )
Top channel (125x65 mm 3200 mm long )
33KV Pin insulator
33KV Pin with nut
MS Angle Iron 100x50x2600 mm
MS Angle Iron Brasing 65x65x6 mm
11/0.4KV Substation Base(75x75x6x2028mm) MS Angle with clamps & bolt and nut
11KV fuse set
Brabed wire
33KV aluminium lug
11KV aluminium lug
LT Clamp with I-Huk
Suspension clamp
Dead end clamp
11KV stay set complete
11KV Disc insulator with fitting
11KV pin insulator
11KV pin with nut
11KV top channel clamp
11KV dropper channel 100x50x2028 mm
11KV dropper channel clamp
11KV F-Clamp
11 KV T-off Channel (125x65xx1300mm)
11 KV T-off Channel Clamp
33KV/11KV earthing complete
LT Clamp
33KV Disc insulator with fitting (B&S)
33KV Dropper Channel with clamp
33KV T-off channel
33KV T-off channel clamp
33KV F-Clamp
33KV Stay Set Complete
11KV V-Type X-Arm (65x65x6mm)
11KV V-Type X-Arm holding clamp
33KV X-Arm (100x50x6mm) with clamp
Supply of G. I. Pipe 6'' dia
Errection/Construction/Laying of following materials/items and GST including loading, unloading & Proper stacking at work place/sites.
Fabrication and Errection of Double Pole Support on 11/13 meter STP including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESSPO Norms. Including supply of all neccesary items.
Fabrication and Errection of Four Pole Support on 11/13 meter STP including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESSPO Norms. Including supply of all neccesary items.
Fabrication and Errection of Single Pole Support on 11/13 meter STP including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESSPO Norms. Including supply of all neccesary items.
Fabrication and Errection of Single Pole Support on 8.5 meter PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast & including digging of pit and fixing of all accessories clamp & earthing as per RESSPO Norms. Including supply of all neccesary items.
Earthing of Poles 33 KV/11 KV as per RESSPO Norms
Grouting and Binding of Stay 11 KV/33 KV with in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms.
i) Laying of underground 33 KV 3x300 sq mm (Double Circuit) XLPE Cable by HDD (HORIZONTAL DRILL DIRECTION) Method by using suitable HDD Machine Complete in all Respect as per norms. (All the material will be supplied by the contractor except 33 KV XLPE cable)
ii) Laying of underground 33 KV 3x300 sqmm (Double Circuit) XLPE Cable by manual method using bricks and sand as per norms (All the material will be supplied by the contractor except 33 KV XLPE cable). Cable route marker will be installed by contractor as per norms with supply of materials.
iii) Laying of 33 KV 3x300 sqmm (double circuit) XLPE Cable with help of 6" dia G.I, pipe for canal crossing including fixing of G.I. pipe along overbridge with proper clamp , nut bolt and other required materials.
Hanging, Looping, Hosting & Clamping of 33KV 3x300 sqmm XLPE cable including supply of all materials like clamp, nut & bolt, channel etc. (G.I. pipe supply has taken else where).
Jumpering of 33KV 3x300 sqmm XLPE cable (after making single core of cable)
Installation of Heat Shrinkable Type cable jointing kits Outdoor end Termination suitable for 33 KV XLPE cable 3x300 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any.
Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 33 KV XLPE cable 3x300 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any.
Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 33 KV XLPE cable 3x300 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. Including construction of inspection pit with materials as per norms.
i) Laying of underground 11 KV 3x185 sq mm (Double Circuit) XLPE Cable by HDD (HORIZONTAL DRILL DIRECTION) Method by using suitable HDD Machine Complete in all Respect as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable)
ii) Laying of underground 11 KV 3x185 sq mm (Double Circuit) XLPE Cable by manual method using bricks and sand as per norms(All the material will be supplied by the contractor except 11 KV XLPE cable). Cable route marker will be installed by contractor as per norms with supply of materials.
Hanging, Looping, Hosting & Clamping of 11KV 3x185 sqmm XLPE cable including supply of all materials like clamp, nut & bolt, channel etc. (G.I. pipe supply has taken else where).
Jumpering of 11KV 3x185 sqmm XLPE cable (after making single core of cable)
Installation of Heat Shrinkable Type cable jointing kits Outdoor end Termination suitable for 11 KV XLPE cable 3x185 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any.
Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 11 KV XLPE cable 3x185 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any.
Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 11 KV XLPE cable 3x185 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. Including construction of inspection pit with materials as per norms.
Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T & P etc. complete in all respect on 250KVA Tf. (all the material will be supplied by the contractor.)
Construction of Plinth of 250 KVA Transformer including excavation of foundation, base concreting of 1:6:12 (Cement mortar of Ratio 1:4 foundation, CC in 1:4:8 ratio (Cement fine sand and brick ballast ) and RCC work with ratio 1:2:4 Cement, Coarse sand and Stone Grit of 20 mm gause as per RESSPO norms
Fencing of Transformer Plinth 250 KVA with the help of wire mesh/Barbed wire after grouting proper size of angle (65x65x6 mm size) as per RESSPO Norms. Inclusive of all material such as Wiremesh/Barbed Wire, Angle Flats, Nut Bolts etc.
Mounting/Shifting of 10 KVA Transformer as per RESSPO Norms
Mounting/Shifting of 25 KVA Transformer as per RESPO Norms
Mounting /Shifting of 63 KVA Transformer as per RESSPO Norms
Mounting of 63 KVA Transformer as per RESSPO Norms
Mounting of 250 KVA Transformer as per RESSPO Norms
Dismantling of old line including Dismantling Matarial
Stringing, Sagging, binding and jumpering of ACSR Weasel as per RESSPO Norms
Stringing, Sagging, binding and jumpering of ACSR Dog as per RESSPO Norms
Stringing, Sagging, binding and jumpering of Three Phase ABC (3x120+1x95+1x16) sqmm as per RESSPO Norms
Stringing, Sagging, binding and jumpering of Three Phase ABC (3x95+1x70+1x16) sqmm as per RESSPO Norms
Stringing, Sagging, binding and jumpering of Three Phase ABC (1x16+1x25) sqmm as per RESSPO Norms
Erection & Commissioning of of 3 Phase Distribution Box with help of clamps (Cost of Bolt & Nuts shall be borne by contractor) as per Norms.
Laying G. I. Pipe 6'' dia
Rect. Back old and used Scrap Iron dump site to Electricity Store Center
Rect. Back old and used Alluminium Conductor Scrap dump site to Electricity Store Center
Rect. Back old and used L.T. ABC 3x95 sqmm Scrap dump site to Electricity Store Center
Rect. Back old and used S.T. Pole Scrap dump site to Electricity Store Center
Rect. Back old and Used 10 KVA T/F from dump site to Electricity Store Center
Rect. Back old and Used 16 KVA T/F from dump site to Electricity Store Center
Rect. Back old and Used 25 KVA T/F from dump site to Electricity Store Center
Rect. Back old and Used 100 KVA T/F from dump site to Electricity Store Center
NOTE: All other supply/works which are not covered above but required to complete the work has to be supply/done without any extra cost payable to successful Bidder.
Gupta Power Infrastructure Limited
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid