Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹6.0 L+₹22,407.29 (3.90%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹6.9 L+₹1.2 L (20.6%)Admitted-Finance VILLAGE P O BARIN MANDIR TEHSIL TOUNI DEVI DISTT HAMIRPUR H P | L3 | Admitted-Finance | |
| 4 | L4₹7.4 L+₹1.7 L (29.3%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹7.7 L+₹2.0 L (34.2%)Admitted-Finance 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | m/sbalagi contector L2 | manglesh thakur L4 | sanjeev kumar L5 | Raksha Devi L1 | Anil Chauhan L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work, jumper work, blasting work in soft / hard rock, chiselling in soft / hard including wedging out of a rock where blasting is prohibited and stacking the excavated earth up to all lifts, stacking the excavated soil up to all lead clear from the edge of excavation and then returniing the stacked soil in 15 centimeters layers when required in to plinths, sides of foundation etc. consolidating each deposited layer by ramming and waterng and then disposing of all surplus excavated earth as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts. | 41.21 | Cum | 340 ₹14,011.4 Lowest | 400 ₹16,484 | 400 ₹16,484 | 351 ₹14,464.71 | 380 ₹15,659.8 |
| 2.00 | Providing and laying cement concrete 1:3:6 ( 1 cement:3 sand :6 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | 2.55 | Cum | 6,000 ₹15,300 Lowest | 8,200 ₹20,910 | 8,400 ₹21,420 | 7,500 ₹19,125 | 7,600 ₹19,380 |
| 3.00Providing and laying cement concrete 1:1.5: 3 (1 cement: 1.5 sand: 6graded crushed stone agg. 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in :- | ||||||||
| 3.01 | Foundation, footing, basis of columns and the like mass concrete.as per direction and to the entire satisfaction of Engineer-in-Charge. | 6.38 | Cum | 8,500 ₹54,230 Lowest | 9,700 ₹61,886 | 9,900 ₹63,162 | 9,000 ₹57,420 | 9,000 ₹57,420 |
| 3.02 | Walls any thickness including attached pillaster buttresses, plinth and string courses from top of foundationup to all floor level as per direction and to the entire satisfaction of Engineer-in-Charge. | 11.49 | Cum | 8,700 ₹99,963 Lowest | 9,700 ₹1,11,453 | 9,900 ₹1,13,751 | 9,000 ₹1,03,410 | 9,250 ₹1,06,282.5 |
| 4.00Providing form work of steel shuttering with steel plat as 3.15mm thich welded with angle iron in frame 30x30x5mm so as to fair finish including centring, shuttering floor two seiling not exceeding 4 mtrs. And removal of the same for insiturein forced conerete and plain concrete work in:- | ||||||||
| 4.01 | Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 102.64 | Sqm | 300 ₹30,792 Lowest | 425 ₹43,622 | 450 ₹46,188 | 425 ₹43,622 | 410 ₹42,082.4 |
| 5.00 | Providing form work of ordinary timber plankings so as to give a rough finish including centring, shuttering, strutting and propping etc. height of propping and centring below supporting floor to ceiling not exceeding 4 metres and removal of the same for insitu reinforced concrete and plain concrete work in : Arches Upto 6 mtr. Span. | 26.55 | Sqm | 300 ₹7,965 Lowest | 2,200 ₹58,410 | 2,400 ₹63,720 | 425 ₹11,283.75 | 2,100 ₹55,755 |
| 6.00Providing and laying cement concrete 1:1.5:3 ( 1 cement:1.5 sand :3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and rain renforcement fpr rainforced cement concrete work in: | ||||||||
| 6.01 | Suspended floor roofs, landing & shelves & their support balconies, beams, girders, bressumers & canilever upto floor level in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | 0.77 | Cum | 8,500 ₹6,545 Lowest | 9,700 ₹7,469 | 9,900 ₹7,623 | 9,000 ₹6,930 | 9,250 ₹7,122.5 |
Tender Value
₹7.4 L
EMD Value
₹14,774
Closing Date
25 Sept 2026, 5:00 pmClosed
Executive Engineer
JSV Division Bhoranj
CO underground Storage Tank 50000 ltr. Cap. at Grahaun GP Dari Under PDNA
2026_HPIPH_143804_1
8001-8060 dated 19-09-2026
Open Tender
Civil Works
Item Rate
120 days
Executive Engineeer Jal Shakti Division Bhoranj
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹14,774
30 Sept 2026
19 Sept 2026
26 Sept 2026
19 Sept 2026
25 Sept 2026
19 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work, jumper work, blasting work in soft / hard rock, chiselling in soft / hard including wedging out of a rock where blasting is prohibited and stacking the excavated earth up to all lifts, stacking the excavated soil up to all lead clear from the edge of excavation and then returniing the stacked soil in 15 centimeters layers when required in to plinths, sides of foundation etc. consolidating each deposited layer by ramming and waterng and then disposing of all surplus excavated earth as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts. | 41.21 | Cum | - | - |
| 2 | Providing and laying cement concrete 1:3:6 ( 1 cement:3 sand :6 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | 2.55 | Cum | - | - |
| 3Providing and laying cement concrete 1:1.5: 3 (1 cement: 1.5 sand: 6graded crushed stone agg. 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in :- | |||||
| 3.01 | Foundation, footing, basis of columns and the like mass concrete.as per direction and to the entire satisfaction of Engineer-in-Charge. | 6.38 | Cum | - | - |
| 3.02 | Walls any thickness including attached pillaster buttresses, plinth and string courses from top of foundationup to all floor level as per direction and to the entire satisfaction of Engineer-in-Charge. | 11.49 | Cum | - | - |
| 4Providing form work of steel shuttering with steel plat as 3.15mm thich welded with angle iron in frame 30x30x5mm so as to fair finish including centring, shuttering floor two seiling not exceeding 4 mtrs. And removal of the same for insiturein forced conerete and plain concrete work in:- | |||||
| 4.01 | Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 102.64 | Sqm | - | - |
| 5 | Providing form work of ordinary timber plankings so as to give a rough finish including centring, shuttering, strutting and propping etc. height of propping and centring below supporting floor to ceiling not exceeding 4 metres and removal of the same for insitu reinforced concrete and plain concrete work in : Arches Upto 6 mtr. Span. | 26.55 | Sqm | - | - |
| 6Providing and laying cement concrete 1:1.5:3 ( 1 cement:1.5 sand :3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and rain renforcement fpr rainforced cement concrete work in: | |||||
| 6.01 | Suspended floor roofs, landing & shelves & their support balconies, beams, girders, bressumers & canilever upto floor level in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | 0.77 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_213765.xls
BOQ • 0.24 MB
Termsandconditions.pdf
Tender Documents • 0.13 MB
Form6.pdf
Tender Documents • 0.56 MB
PWD8.pdf
Tender Documents • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .