Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical fulfill the PQ criteria |
| 2 | Accepted-Technical F 03 FIRST FLOOR PLOT NO 166 BEHIND TOKAS PLAZA AMVERHAI EXT SECTOR 19B DWARKA DELHI 110075 | DELHI | SOUTH WEST DELHI | DELHI | 110075 | Accepted-Technical fulfill the PQ criteria |
| 3 | Accepted-Technical 17 VIJAY KIRAN APARTMENT TIDKE COLONY NASHIK 422002 MH INDIA | NASHIK | MAHARASHTRA | 422002 | Accepted-Technical fulfill the PQ criteria |
| 4 | Accepted-Technical 23A 1 SHAKTI VIHAR TANKI ROAD BADARPUR NEW DELHI 110 044 | SOUTH EAST | DELHI | 110044 | Accepted-Technical fulfill the PQ criteria |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
11 Apr 2026, 6:30 pmClosed
Ashok Kumar K, Technical Officer D
CCE R AND D WEST PUNE
Operation and Maintenance of External/ Internal Electrification, DG Set and Air Conditioning System at VRDE, Ahmednagar
2026_DRDO_903924_1
CCEW/C8/80579/EndM/VRDE/CONT
Open Tender
Electrical Works
Item Rate
365 days
VRDE Ahmednagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
CCE R AND D WEST
₹1.4 L
30 Apr 2026
27 Mar 2026
13 Apr 2026
28 Mar 2026
11 Apr 2026
6 Apr 2026
30 Mar 2026 - 6 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Operation and Maintenance of External / Internal Electrification, DG Set and Air Conditioning System at VRDE, Ahmednagar (Percentage Rate Schedule for Item No . 1.01 Only) | |||||
| 1.01 | Operation and Maintenance of External / Internal Electrification, DG Set and Air Conditioning System at VRDE, Ahmednagar Note:-
1.The amount of EPF, ESI, Bonus and Spare is
Rs. 14,01,812.36 will be added on quoted percentage to arrive contract Sum. For details refer Appendix - 'D' of Tender Enquiry.
2. The bidder shall quote more than or equal to 3.85% (Three Point Eight Five) Percent (up to two decimal only) 3. Bidder are advised to quote rate in pecrcentage basis in Basic rate Column No- M14 for Item No- 1.01 more than or equal to 3.85 % | - | Months | - | - |
| 2Fully Comprehensive AMC (Item Rates Schedule for Srl Item No 2.01 to 2.06 ) | |||||
| 2.01 | Fully Comprehensive AMC for 1.5 Ton Voltas make split Unit-18 TR | - | Months | - | - |
| 2.02 | Fully Comprehensive AMC for 2 Ton Voltas make split Unit-72 TR | - | Months | - | - |
| 2.03 | Fully Comprehensive AMC 5.5 Ton Voltas Make Ductable AC-11 TR | - | Months | - | - |
| 2.04 | Fully Comprehensive AMC for Carrier Make VRF System -66 HP | - | Months | - | - |
| 2.05 | Fully Comprehensive AMC for 8.5 Ton Precission Make AC -34TR | - | Months | - | - |
| 2.06 | Fully Comprehensive AMC for 6.0 Ton Carrier Make Ductable AC | - | Months | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.66 MB
BOQ_950110.xls
BOQ • 0.28 MB
ENQVRDE.PDF
Tender Documents • 6.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .