Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
21 Feb 2023, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Town TANGEDCO
EE Town TANGEDCO
Town Division Fort Upgraded Section Work Contract
2023_EB_288324_1
EE/Town/WC.006/2022-23
Open Tender
Electrical Works
Works
180 days
Fort
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
Yes
24 Feb 2023
13 Feb 2023
22 Feb 2023
13 Feb 2023
21 Feb 2023
14 Feb 2023
Amount
Supply of Materials
LT 4X120 Sq.mm Straight Joint Kit
Aluminum Lugs 120 sqmm
Labour Charges
Excavation of pole pit upto 27"(8.0 m) Poleby using JCB/ Manual
Excavation of Stay pit 4.5' to 5' depth by using JCB/ Manual
Excavation of pole pit upto 9.14/9.00 Mtr Pole by using JCB/ Manual
Erection of PSC/RCC Poles/Metal Poles upto 8.00m.(27')by using crane/Manual
Erection of PSC/RCC Poles/Metal Poles Above 8.00m by using crane/Manual
Dismantling of PSC/RCC Poles/Metal Poles upto 8.00mts
Dismantling of PSC/RCC Poles/Metal Poles Above 8.00mts
Erection of stay set complete
Dismantling of stay set complete
Erection of HT "V" cross arms (all types)/ channel cross arms/guarding Cross arms 3 1/2
Dismantling of HT "V" cross arms (all types)/ channel cross arms/guarding Cross arms 3 1/2
Erection of LT 3 phase cross arms angle and channel
Dismantling of LT 3 phase cross arms angle and channel
Erection of LT Single phase cross arms angle and channel
Dismantling of LT Single phase cross arms angle and channel
Erection of HT/LT TI Fittings
Dismantling of HT/LT TI Fittings
Fixing of HT pin Insulators(22KV)
Dismantling of HT pin Insulators(22KV)
Fixing of HT 22 KV Strain Disc.
Dismantling of HT 22 KV Strain Disc
Fixing of LT pin Insulator
Dismantling of LT pin Insulator
Fixing of LT Shackle
Dismantling of LT Shackle
Fixing of Aluminium Knob
Dismantling of Aluminium Knob
Earthing of pole with pit including burying looping and binding.
Dismantling of HT/LT Lines -- ACSR 7/3.35 mm / AAAC 7/3.15 mm
Paving of Conductor & UG Cables Laying, stringing, binding Jumpering etc., complete with ACSR for both HT/LT lines - ACSR 7/3.35 mm / AAAC 7/3.15 mm
Paving of Conductor & UG Cables stringing, binding Jumpering etc., complete with ACSR for both HT/LT lines - ACSR 7/3.35 mm / AAAC 7/3.15 mm
Dismantling of HT/LT Conductor & Cables- ACSR 7/3.35 mm / AAAC 7/3.15 mm
Paving of Conductor & LT UG Cable- stringing, binding Jumpering etc., complete with 2x16 Sqmm,4x24 Sqmm, ACSR for both HT/LT lines - ACSR 7/2.59 mm , ACSR 7/2.11 mm , AAAC 7/2.50 mm & Paving of LT UG Cables
Dismantling of HT/LT Conductor and Cables (ACSR 7/2.59 mm , ACSR 7/2.11 mm , AAAC 7/2.50 mm)
Paving and Re-stringing of LT line with ACSR 7/2.59mm
Erection of DT Structure Materials in Transformer
Releasing of DT Structure Materials In Transformer
Transport of Materials/ conductors and other materials (excluding loading and unloading charges.) - Upto 8 Kms.
Loading of poles upto 27'-0"
Unloading of polesupto 27'-0"
Loading of poles upto 30"
Unloading of poles upto 30"
Loading and unloading of line materials
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual upto 100m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual beyond 100m
Erection of New Transformer all Capacities
Dismantling of Transformer all Capacities
Re-Sagging ACSR 7/3.35/AAAC 3.15 mm
Re-Sagging ACSR 7/2.59/AAAC 2.50 mm & ACSR 7/2.11
Releasing of single phase service and refixing
Releasing of Three phase service and (upto 50 KW)refixing
Drilling of hole in channel only 3/4" & 1" per hole
Cutting of channel
Erection of Transformer structure completed in all respects with wiring Earthing ,fixing of open type fuse units ,HT/LT/LAS and jumpering 3 Nos.Earth pits with tubs including painting of metal parts, structure poles ,fixing of top channel seating channel , belting angle( Except erection of transformer)
Dismantling of Transformer structure completed in all respects(( Except Dismantling of transformer)
Mass concreting for poles including cost of materials and labour 5'x2'x2'
Stay Concreting including cost of materials and labour 375mmx375mmx50mm
Fixing of Top channel
Raleasing of Top Channel
Fixing of Bed channel
Releasing of Bed channel
Erection of AB switch
Dismantling of AB switch
Dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking. - - Mini way pillar box
Erection of 1.1 KV 4C x 120,240 Sq.mm LT UG Cable Straight Joint Kit-Heat shrinkable type,including charges for cable jointer.
Erection of Mini Pillar Box including cost of excavation , transportation, construction of 2 Nos pillar walls ( 1.20 m - Height x 0.5 m - Length x 0.2 m - width)., plastering of 2 Nos pillar walls as specified below including supply of all civil materials such as cement, sand, jelly and T&Ps. This includes earthing ( Earth pipe alone will be supplied by TANGEDCO)
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .