| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.7 LAdmitted-Fee/PreQual/Technical/Finance | -33.10% | ₹17.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹17.7 L+₹2,644.03 (0.15%)Admitted-Fee/PreQual/Technical/Finance | -33.00% | ₹17.7 L+₹2,644.03 (0.15%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹18.5 L+₹77,470.07 (4.38%)Admitted-Fee/PreQual/Technical/Finance | -30.17% | ₹18.5 L+₹77,470.07 (4.38%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹19.0 L+₹1.4 L (7.64%)Admitted-Fee/PreQual/Technical/Finance AT PO RETANG PS TAMANDO DIST KHORDHA | RETANG | KHORDHA | ODISHA | -27.99% | ₹19.0 L+₹1.4 L (7.64%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹19.3 L+₹1.6 L (9.13%)Admitted-Fee/PreQual/Technical/Finance | -26.99% | ₹19.3 L+₹1.6 L (9.13%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹26.4 L
EMD Value
₹26,440
Closing Date
4 Jul 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, BHUBANESWAR
Renovation of conference hall of Central R.W. Circle building, Bhubaneswar at Unit-IX, Bhubaneswar
2026_CERWI_133609_1
Tender Online Divn. BBSR 07 of 2026
Open Tender
Civil Works - Buildings
Percentage
90 days
Khordha
2 documents required · 2 mandatory
₹6,000
₹26,440
Yes
6 Jul 2026
29 Jun 2026
6 Jul 2026
29 Jun 2026
4 Jul 2026
29 Jun 2026
29 Jun 2026 - 4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fly Ash Brick Masonry in cement mortar of mix (1:6) using Fly Ash bricks of size 25c.m x 12 c.m x 8 c.m in Super structure having crushing strength not less than 75 kg per square c.m. with cement and screened & washed sharp sand for mortar after immersing the bricks for 6 (Six) hours in water before use in works with all necessary projections, splays cutting, circular moulding, corbelling, chamfering, watering and curing etc. including cost, coveyance,stacking, loading, unloading, royalties , all taxes ,cost of all labour,Labour cess ,scaffolding, sundries and T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. (A/R 2006, Pg-71, item no-3)
2nd Floor | 14.47 | Cum | 6,425.5 | ₹92,976.99 |
| 2 | Providing 12 mm thick cement plaster with cement mortar of mix (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties, with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect and specification and direction of the Engineer in charge. (Inside plastering)
2nd Floor | 82.29 | Sqm | 200.1 | ₹16,466.23 |
| 3 | Providing 16mm. Thick cement plaster in cement mortar or mix(1:6) in all floors at all height with cement & screened and washed sharp river sand for mortar and finished smooth to the rough surface of the brick masonary walls after racking out the joints (alongwith providing grooves wherever necessary)including watering and curing,rounding of corners etc. complete with cost,conveyance,loading, unloading,royalities and taxes of all materials,cost of all labour,T&P and scaffolding required for the work etc. as directed by the Engineer-in-charge. (Inside PLastering)
2nd Floor | 82.29 | Sqm | 290.3 | ₹23,888.79 |
| 4 | Priming one coat with water bound wall cement primer etc. complete as per direction of the Engineer-in-Charge.
2nd Floor | 164.58 | Sqm | 87.5 | ₹14,400.75 |
| 5 | Finishing plastered surfaces of walls with cement based wall putty (Water based) of approved make and finishing the surface smooth and even by sand papering to receive painting in walls, at all heights with staging wherever necessary with cost, conveyance, all materials, cost of all labour,labourcess, all T&P etc. required for the work complete in all respect as per the direction of the Engineer-in-charge.
2nd Floor | 164.58 | Sqm | 89.5 | ₹14,729.91 |
| 6 | Painting two coats with plastic emulsion paint with a approved quality primer to make an even finished surface in all floors and heights to wall surface of approved make and shade including sand papering, applying putty wherever necessary & cost of scaffolding, staging charges with cost, conveyance, cost of all labour,labour cess, T&P etc. complete as per the direction of the Engineer-in-charge.
2nd Floor | 164.58 | Sqm | 114.8 | ₹18,893.78 |
| 7 | Providing Mat finished Granite stone prepolished 20mm thick of area above 0.40 Sqm in flooring of approved quality, colour and size in floors, treads on steps and landings in all floors at all height on 6mm thick bed of Tile Adhesive laid in proper slope and gradient ,grouting the joints with Tile Grout mixed with required quantities of pigments of approved make to match the shades of the granite tile if required watering and curing for 21 days, including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, Labour cess ,sundries, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge.
2nd Floor | 0.96 | Sqm | 2,836.2 | ₹2,722.75 |
| 8 | Providing vitrified tile flooring using vitrified tiles having thickness of 8mm to 10mm conforming to IS 13755 of 600mmx600mm (coloured/printed) (homogeneous) of premium quality (Make :- Orient bell / RAK / Johnson or equivalent) in floors, treads on steps and landings on 20mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and fixing with neat white cement slurry,grouting the joints with neat white cement slurry mixed with required quantities of pigments of approved make to match the shades of the vitrified tile if required , watering and curing for 21 days, including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour,Labour cess , sundries, T&P required for the work, complete in all respect as per specification and direction of Engineer-in-charge. | 9.94 | Sqm | 1,220.6 | ₹12,132.76 |
| 9 | Providing vitrified tile in dado/ skirting using vitrified tiles having thickness of 8mm to 10mm conforming to IS 13755 of 600mmx600mm, (coloured/printed) (homogeneous) (Make :- Orient bell / RAK / Johnson or equivalent) in dado/ skirting,riser of steps,wall on on 12mm thick bed of cement mortar of mix (1:3) laid in proper slope and gradient with screened and washed sharp sand for mortar and fixing with neat white cement slurry,grouting the joints with neat white cement slurry mixed with required quantities of pigments of approved make to match the shadesof the vitrified tile if required watering and curing for 21 days, including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, Labour cess ,sundries, T&P required for the work, etc. complete in all respect as per specification and direction of Engineer-in-charge.
2nd floor | 11.55 | Sqm | 1,318.9 | ₹15,233.3 |
| 10 | Glazed ceramic tiles 20cmx30cm / 20cm x 20cm special plain /printed Wall tile series of premium grade 12mm thick bed CM(1:3) (A/R 2006, Pg-90, item no-17) etc. complete in all respect as per specification and direction of Engineer-in-charge.
2nd Floor | 7.29 | Sqm | 935.2 | ₹6,817.61 |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.42 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_598728.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .