Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | -11.91% | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.9 LAdmitted-Finance | -1.00% | ₹1.9 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Adjoining Block certificate from concerned BDO not uploaded |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Residence certificate from BDO not uploaded |
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
16 Mar 2026, 4:00 pmClosed
XEN REW Kathua
xenrew
Constt. of protection work near House of shiv kumar S/O munshi ram simti wno 1
2026_RDPR_305758_1
e-NIT No.390/REW/K of 2025-26 Dated 10/03/2026 2nd call
Open Tender
Civil Works
30 days
Mahanpur
sbd
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹3,920
18 Mar 2026
10 Mar 2026
17 Mar 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EXECUTIVE ENGINEER REW DIVISION KATHUA
Name of Work;- Protection work near house of Shiv Kumar S/o Munshi Ram Simti Wno. 1 Panchayat Chunnera Block Mahanpur District Kathua under Development Scheme (CDS) for the year 2025-26 ESTT AMOUNT 1.96 LACS
Contract NO:- MLACDF 2025-26
Name of the Bidder/ Bidding Firm / Company :
S. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge. 12.88 cum 479.3 1000 Excess(+) Full Conversion INR
Providing and laying in position cement concrete 1 cement:5 fine sand:10 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. 2.57 Cum 4826.5 1000 Excess(+) Full Conversion INR
Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. 21.43 CUM 5733.6 1000 Excess(+) Full Conversion INR
Supply and dumping of stones in horizontal 9.2 cum 937.9 1000 Excess(+) Full Conversion INR
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. SQM 1000 Excess(+) Full Conversion INR
Providing and fixing on wall face un-plasticized Rigid PVC rain water pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS: 5382 leaving 10 mm gap for thermal expansion. (i) Single socketed pipes 12.58.1 75 mm diametre 6.5 meter 226.15 1000 Excess(+) Full Conversion INR
Carriage of sand 43 km by MT 11.3 cum 663.86 1000 Excess(+) Full Conversion INR
Carriage of aggregate below 20 mm 43 km by MT 19.11 cum 663.86 1000 Excess(+) Full Conversion INR
Carriage of aggregate above 20 mm 43 km by MT 2.28 cum 721.64 1000 Excess(+) Full Conversion INR
Carriage of stone 18 km by MT 9.2 cum 451.51 1000 Excess(+) Full Conversion INR
Providing and fixing inauguration plaque made of polished granite stone, size 750 mm × 600 mm × 20 mm (or as approved), including machine-cut edges, fine polish, includinh high-quality gold paint (weather-resistant), complete with border design, cleaning, curing, and all finishing work. The plaque shall be fixed on a cement concrete pedestal/wall using stainless-steel clamps/adhesive, including all labour, materials, tools, transportation, and incidental charges to complete the job as per engineer-in-charge directions. 1 each 5000 1000 Excess(+) Full Conversion INR
Total in Figures Excess(+) Full Conversion INR
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.97 MB
BOQ_992976.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid