| Sl No | Description | Qty | Unit | D Sakthivel L1 | Sri Construction L2 |
|---|---|---|---|---|---|
| 1.00Strengthening to the road From Poovalakuttai to othapillakadu road KM 0/0 - 0/670 H/O 85 Goundamapalayam (R 558) | |||||
| 2.00 | Clearing Scrub Jungles and removing them by burrying or burning etc., completed as per Sl. No.2 | 301.5 | Sqm | 4.9 ₹1,477.35 Lowest | 6 ₹1,809 |
| 3.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 89.67 | Sqm | 131.29 ₹11,772.77 Lowest | 131.29 ₹11,772.77 Lowest |
| 4.00 | Construction of Granular Sub base Grade III by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) | 200.13 | cum | 2,035.72 ₹4,07,408.64 Lowest | 2,045 ₹4,09,265.85 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 200.13 | cum | 2,100.32 ₹4,20,337.04 Lowest | 2,100.32 ₹4,20,337.04 Lowest |
| 6.00 | Applying Prime Coat over WMB/ WMM surface at 7 Kg of SS-1 Bitumen Emulsion / 10 sq.m including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification. | 2,001.3 | Sqm | 80.14 ₹1,60,384.18 Lowest | 80.14 ₹1,60,384.18 Lowest |
| 7.00 | Applying Tack Coat over WMM surface at 2.5 Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 2,001.3 | Sqm | 18.49 ₹37,004.04 Lowest | 18.49 ₹37,004.04 Lowest |
| 8.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Mini Hot Mix Plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc | 2,001.3 | cum | 298.58 ₹5,97,548.15 Lowest | 298.58 ₹5,97,548.15 Lowest |
| 9.00 | Providing and laying including cost and conveyanve of gravel from approved sources to work site including labour for spreading watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture contentband hire fule charges for power roller water sprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc.com | 268 | cum | 337.3 ₹90,396.4 Lowest | 337.3 ₹90,396.4 Lowest |
| 10.00 | Providing Km and Hm stones | 3 | Nos | 780 ₹2,340 Lowest | 780 ₹2,340 Lowest |
Tender Value
₹20.7 L
EMD Value
₹20,670
Closing Date
26 Dec 2024, 5:00 pmClosed
BDO (BP)
BDO office
Strengthening to the road From Poovalakuttai to othapillakadu road KM 0/0 - 0/670 H/O 85 Goundamapalayam in Elachipalayam Block of Namakkal District P2
2024_RDTN_512492_2
3526/2014/A2-20.12.2024
Open Tender
Civil Works
Item Rate
180 days
Elachipalayam
As per schedule
2 documents required · 2 mandatory
₹0
₹20,670
20 Aug 2025
20 Dec 2024
26 Dec 2024
20 Dec 2024
26 Dec 2024
21 Dec 2024
Amount
Strengthening to the road From Poovalakuttai to othapillakadu road KM 0/0 - 0/670 H/O 85 Goundamapalayam (R 558)
Clearing Scrub Jungles and removing them by burrying or burning etc., completed as per Sl. No.2
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Construction of Granular Sub base Grade III by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying Prime Coat over WMB/ WMM surface at 7 Kg of SS-1 Bitumen Emulsion / 10 sq.m including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Applying Tack Coat over WMM surface at 2.5 Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Mini Hot Mix Plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc
Providing and laying including cost and conveyanve of gravel from approved sources to work site including labour for spreading watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture contentband hire fule charges for power roller water sprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc.com
Providing Km and Hm stones
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sri Construction (BID ID -1218836)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_609432.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .