| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹3.5 L+₹10,288.42 (3.00%)Accepted-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L2 | Accepted-Finance ok | |
| 3 | L3₹3.8 L+₹33,925 (9.90%)Accepted-Finance | L3 | Accepted-Finance ok | |
| 4 | L4₹4.0 L+₹56,050 (16.4%)Accepted-Finance | L4 | Accepted-Finance ok | |
| 5 | L5₹4.1 L+₹63,720 (18.6%)Accepted-Finance | L5 | Accepted-Finance ok |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
12 Apr 2023, 11:05 amClosed
EE SDW IX
RITHALA STP SEC-11 ROHINI DELHI 110085
Renovation of foundation for pump set No.3,4 and 5 at Rohini Sector 19 SPS.
2023_DJB_239216_3
NIT No. 22 (2022-23)
Open Tender
Miscellaneous Works
Works
30 days
RITHALA STP SEC-11 ROHINI DELHI
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
As per NIT
₹10,000
20 Apr 2023
31 Mar 2023
12 Apr 2023
31 Mar 2023
12 Apr 2023
31 Mar 2023
Closing and opening of suction & delivery side sluice valves along with provision for blank flange for stopping the water leakage. Dismantling the pump by cutting of nut bolt with gas cutter.
Dismantling of electric connections from motor & removing of foundation bolt, coupling of pump and motor, taking out from its frame to outside in safe and sound condition up to floor level of pump house by EOT crane and manual labor.
Removing of base frame from the RCC foundation by cutting of foundation bolt with gas cutter etc and taking out of complete frame with the help of EOT crane.
Breaking the RCC of bolt pocket by power hammer for fresh bolt pocket. This includes removing of malba of RCC from the foundation site by manual labor from the deep dry sump well.
Removing of foundation bolt by manual labor and chisel to make the bolt free from the RCC foundation bolt.
Providing of heavy duty SS foundation bolts of size 25mm dia and 225 mm in length with nuts & washers.
Fixing of SS foundation bolts duly welded in the old MS Jal of foundation.
Filling of Cement & concrete mixture heaving CC ratio of 1:2:4 for grip of foundation bolt in RCC structure and also making wet layer of cement on the old RCC foundation including shuttering. Leveling of M.S. base frame on RCC Foundation
Supply of MS nut bolts with washer for fixing the dismantled pump in suction and delivery line as per site requirement.
Supply of rubber neoprene packing.
Fixing of pump set on dry foundation frame with the help of EOT crane and making of proper alignment of suction and delivery line of existing & fixing of delivery taper. Dismantle joint and other part like suction with new nut bolts and packing etc. as per required job. Fixing of electric motor on base frame and alignment with pump set and motor electric connection and coupled with coupling.
Testing and commissioning charges of complete pump set.
Shivam Enterprises
Raj Engineering Co.
M/s Vipin Enterprises
VS ENGINEERING COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .