Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-Finance | ₹5.5 L | L1 | Accepted-Finance ACCEPTED |
| 2 | L2₹5.9 L+₹37,026.29 (6.72%)Accepted-Finance | ₹5.9 L+₹37,026.29 (6.72%) | L2 | Accepted-Finance ACCEPTED |
| 3 | L3₹6.0 L+₹44,286.34 (8.04%)Accepted-Finance 0 UMARCHHA KACHHAR MAHGAON CHAIL ALLAHABAD UTTAR PRADESH 212213 UDYAM UP 46 0009010 | KAUSHAMBI | UTTAR PRADESH | 212213 | ₹6.0 L+₹44,286.34 (8.04%) | L3 | Accepted-Finance ACCEPTED |
| 4 | L4₹6.2 L+₹66,139.12 (12.0%)Accepted-Finance TAMIL NADU TAMIL NADU | TIRUNELVELI | TAMIL NADU | 627001 | ₹6.2 L+₹66,139.12 (12.0%) | L4 | Accepted-Finance ACCEPTED |
| 5 | L5₹6.5 L+₹1.0 L (18.6%)Accepted-Finance | ₹6.5 L+₹1.0 L (18.6%) | L5 | Accepted-Finance ACCEPTED |
Tender Value
₹7.3 L
EMD Value
₹7,300
Closing Date
4 Sept 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
PROPOSED CONSTRUCTION OF COMPOUNDWALL AND LAYING OF FLOOR TILES SURROUNDING OF MULTIPURPOSE HALL AT AGATHIYA NAGAR 30 STREET IN DIV 95 UNIT 21 ZONE 08
2026_CoC_698101_1
Z.O.VIII.C.NO.E1/1006/2026
Open Tender
Civil Works
Works
120 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,300
7 Sept 2026
25 Aug 2026
7 Sept 2026
25 Aug 2026
4 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanica...2.40m Footing Depth. (including Refilling charges)Help | 16 | CUM | 368.55 | ₹5,896.8 |
| 2 | Crushed stone sand (Commercially called M-Sand)Help | 14 | CUM | 1,578.8 | ₹22,103.2 |
| 3 | Cement Concrete 1:3:6 (One Cement, Three crushed s...least 1 metre height)-Mixing by mechanical means Help | 14 | CUM | 6,916.1 | ₹96,825.4 |
| 4 | Installation of Vertical Bored cast in situ RCC pi...eparately ) Grade of Concrete: M25 300 mm dia pileHelp | 42 | R/M | 1,564.54 | ₹65,710.68 |
| 5 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level Help | 1,200 | KGS | 98.7 | ₹1,18,440 |
| 6 | Supplying and erecting steel centering including n...l be given after the concrete is laid). FOUNDATIONHelp | 53 | SQM | 756.34 | ₹40,086.02 |
| 7 | Supplying and erecting centering for plane surface...g shall be given after the concrete is laid).BEAM Help | 25 | SQM | 1,267.76 | ₹31,694 |
| 8 | Providing and laying in position, Standardised Con...the Department for the excess usage of materials).Help | 9 | CUM | 8,197.92 | ₹73,781.28 |
| 9 | Brick work in following Cement Mortar using best q...Executive Engineer in charge. In Cement Morter 1:3Help | 21 | CUM | 8,192.9 | ₹1,72,050.9 |
| 10 | Plastering the surface of walls with Cement Mortar...d as directed by the departmental officers. (Wall)Help | 158 | SQM | 317.59 | ₹50,179.22 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_839173.xls
BOQ • 0.28 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
CORRIGEN.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .